Testimony in Response to Ucs Contention 4 Re Connection of Pressurizer Heater to Diesel.Presents Provisions Assuring Protection of Onsite Emergency Power Supplies.Prof Qualifications Encl.Related CorrespondenceML19337A426 |
Person / Time |
---|
Site: |
Three Mile Island |
---|
Issue date: |
09/15/1980 |
---|
From: |
Shipper P, Torcivia J METROPOLITAN EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML19332B231 |
List: |
---|
References |
---|
ISSUANCES-SP, NUDOCS 8009260407 |
Download: ML19337A426 (15) |
|
|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20210B8491999-07-21021 July 1999 Exemption from Certain Requirements of 10CFR50.54(w),for Three Mile Island Nuclear Station Unit 2 to Reduce Amount of Insurance for Unit to $50 Million for Onsite Property Damage Coverage ML20206D4141999-04-20020 April 1999 Exemption from Requirements of 10CFR50,App R,Section III.G.2 Re Enclosure of Cable & Equipment & Associated non-safety Related Circuits of One Redundant Train in Fire Barrier Having 1-hour Rating ML20206T7211999-02-11011 February 1999 Memorandum & Order (CLI-99-02).* Denies C George Request for Intervention & Dismisses Subpart M License Transfer Proceeding.With Certificate of Svc.Served on 990211 ML20198A5111998-12-11011 December 1998 Comment Opposing Proposed Rule 10CFR50.65 Re Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants.Proposed Rulemaking Details Collaborative Efforts in That Rule Interjects Change ML20154G2941998-09-17017 September 1998 Transcript of 980917 Public Meeting in Rockville,Md Re License Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen. Pp 1-41 ML20199J0121997-11-20020 November 1997 Comment on Pr 10CFR50 Re Financial Assurance Requirements for Decommisioning Nuclear Power Reactors.Three Mile Island Alert Invokes Comments of P Bradford,Former NRC Member ML20148R7581997-06-30030 June 1997 Comment on NRC Proposed Bulletin 96-001,suppl 1, Control Rod Insertion Problems. Licensee References Proposed Generic Communication, Control Rod Insertion, & Ltrs & 961022 from B&W Owners Group ML20078H0431995-02-0101 February 1995 Comment Opposing Proposed Rule 10CFR50 Re Shutdown & Lowpower Operations for Nuclear Reactors ML20077E8231994-12-0808 December 1994 Comment Supporting Proposed Rules 10CFR2,51 & 54 Re Rev to NRC NPP License Renewal Rule ML20149E2021994-04-20020 April 1994 R Gary Statement Re 10 Mile Rule Under Director'S Decision DD-94-03,dtd 940331 for Tmi.Urges Commissioners to Engage in Reconsideration of Author Petition ML20065Q0671994-04-0707 April 1994 Principal Deficiencies in Director'S Decision 94-03 Re Pica Request Under 10CFR2.206 ML20058A5491993-11-17017 November 1993 Exemption from Requirements in 10CFR50.120 to Establish, Implement & Maintain Training Programs,Using Sys Approach to Training,For Catorgories of Personnel Listed in 10CFR50.120 ML20059J5171993-09-30030 September 1993 Transcript of 930923 Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-130.Related Documentation Encl ML20065J3461992-12-30030 December 1992 Responds to Petition of R Gary Alleging Discrepancies in RERP for Dauphin County,Pa ML20065J3731992-12-18018 December 1992 Affidavit of Gj Giangi Responding to of R Gary Requesting Action by NRC Per 10CFR2.206 ML20198E5581992-12-0101 December 1992 Transcript of Briefing by TMI-2 Advisory Panel on 921201 in Rockville,Md ML20210D7291992-06-15015 June 1992 Exemption from Requirements of 10CFR70.24 Re Criticality Accident Requirements for SNM Storage Areas at Facility Containing U Enriched to Less than 3% in U-235 Isotope ML20079E2181991-09-30030 September 1991 Submits Comments on NRC Proposed Resolution of Generic Issue 23, Reactor Coolant Pump Seal Failure. Informs That Util Endorses Comments Submitted by NUMARC ML20066J3031991-01-28028 January 1991 Comment Supporting SECY-90-347, Regulatory Impact Survey Rept ML20059P0531990-10-15015 October 1990 Comment Opposing Proposed Rules 10CFR2,50 & 54 Re Nuclear Power Plant License Renewal ML20059N5941990-10-0404 October 1990 Transcript of 900928 Public Meeting in Rockville,Md Re Studies of Cancer in Populations Near Nuclear Facilities, Including TMI ML20055F4411990-06-28028 June 1990 Comment Supporting Petition for Rulemaking PRM-50-55 Re Revs to FSAR ML20248J1891989-10-0606 October 1989 Order.* Grants Intervenors 891004 Motion for Permission for Opportunity to Respond to Staff Correspondence.Response Requested No Later That 891020.W/Certificate of Svc.Served on 891006 ML20248J1881989-10-0303 October 1989 Motion for Permission for Opportunity to Respond to Staff Correspondence in Response to Board Order of 890913.* Svc List Encl ML20248J0301989-09-29029 September 1989 NRC Staff Response to Appeal Board Order.* Matters Evaluated in Environ Assessment Involved Subjs Known by Parties During Proceeding & Appear in Hearing Record & Reflect Board Final Initial Decision LBP-89-7.W/Certificate of Svc ML20247E9181989-09-13013 September 1989 Order.* Requests NRC to Explain Purpose of 890911 Fr Notice on Proposed Amend to Applicant License,Revising Tech Specs Re Disposal of Accident Generated Water & Effects on ASLB Findings,By 890929.W/Certificate of Svc.Served on 890913 ML20247G0361989-07-26026 July 1989 Transcript of Oral Argument on 890726 in Bethesda,Md Re Disposal of accident-generated Water.Pp 1-65.Supporting Info Encl ML20247B7781989-07-18018 July 1989 Certificate of Svc.* Certifies Svc of Encl Gpu 890607 & 0628 Ltrs to NRC & Commonwealth of Pa,Respectively.W/Svc List ML20245D3651989-06-20020 June 1989 Notice of Oral Argument.* Oral Argument on Appeal of Susquehanna Valley Alliance & TMI Alert from ASLB 890202 Initial Decision Authorizing OL Amend,Will Be Heard on 890726 in Bethesda,Md.W/Certificate of Svc.Served on 890620 ML20245A5621989-06-14014 June 1989 Order.* Advises That Oral Argument on Appeal of Susquehanna Valley Alliance & TMI Alert from Board 890202 Initial Decision LBP-89-07 Authorizing OL Amend Will Be Heard on 890726 in Bethesda,Md.W/Certificate of Svc.Served on 890614 ML20247F3151989-05-22022 May 1989 NRC Staff Response to Appeal by Joint Intervenors Susquehanna Valley Alliance/Tmi Alert.* Appeal Should Be Denied Based on Failure to Identify Errors in Fact & Law Subj to Appeal.W/Certificate of Svc ML20246Q2971989-05-15015 May 1989 Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20246J6081989-05-12012 May 1989 Licensee Brief in Reply to Joint Intervenors Appeal from Final Initial Decision.* ASLB 890203 Final Initial Decision LBP-89-07 Re Deleting Prohibition on Disposal of accident- Generated Water Should Be Affirmed.W/Certificate of Svc ML20247D2761989-04-20020 April 1989 Transcript of 890420 Briefing in Rockville,Md on Status of TMI-2 Cleanup Activities.Pp 1-51.Related Info Encl ML20244C0361989-04-13013 April 1989 Order.* Commission Finds That ASLB Decision Resolving All Relevant Matters in Favor of Licensee & Granting Application for OL Amend,Should Become Effective Immediately.Certificate of Svc Encl.Served on 890413 ML20245A8381989-04-13013 April 1989 Transcript of Advisory Panel for Decontamination of TMI-2 890413 Meeting in Harrisburg,Pa.Pp 1-79.Supporting Info Encl ML20245A2961989-04-13013 April 1989 Transcript of 890413 Meeting in Rockville,Md Re Affirmation/Discussion & Vote ML20248H1811989-04-0606 April 1989 Valley Alliance/Tmi Alert Motion for Leave to File Appeal Brief out-of-time.* W/Certificate of Svc.Served on 890411.Granted for Aslab on 890410 ML20248G0151989-04-0606 April 1989 Valley Alliance/Tmi Alert Motion for Leave to File Appeal Brief out-of-time.* Requests to File Appeal Brief 1 Day Late Due to Person Typing Document Having Schedule Problems ML20248G0261989-04-0606 April 1989 Susguehanna Valley Alliance/Tmi Alert Brief in Support of Notification to File Appeal & Request for Oral Argument Re Appeal.* Certificate of Svc Encl ML20248D7211989-04-0404 April 1989 Memorandum & Order.* Intervenors Application for Stay Denied Due to Failure to Lack of Demonstrated Irreparable Injury & Any Showing of Certainty That Intervenors Will Prevail on Merits of Appeal.W/Certificate of Svc.Served on 890404 ML20247A4671989-03-23023 March 1989 Correction Notice.* Advises That Date of 891203 Appearing in Text of Commission 890322 Order Incorrect.Date Should Be 871203.Certificate of Svc Encl.Served on 890323 ML20246M2611989-03-22022 March 1989 Order.* Advises That Commission Currently Considering Question of Effectiveness,Pending Appellate Review of Final Initial Decision in Case Issued by ASLB in LBP-89-07. Certificate of Svc Encl.Served on 890322 ML20236D3821989-03-16016 March 1989 Valley Alliance & TMI Alert Motion for Extension of Time to File Brief in Support of Request for Appeal in Matter of 2.3 Million Gallons Of....* Certificate of Svc Encl.Served on 890316.Granted for Aslab on 890316 ML20236D3121989-03-15015 March 1989 Licensee Answer to Joint Intervenors Motion for Extension of Time to File Brief on Appeal.* Motion Opposed Based on Failure to Demonstrate Good Cause.W/Certificate of Svc ML20236D2901989-03-11011 March 1989 Valley Alliance/Tmi Alert Motion for Extension of Time to File Brief in Support of Request for Appeal in Matter of Disposal of 2.3 Million Gallons of Radioactive Water at Tmi,Unit 2.* Svc List Encl ML20236A3761989-03-0808 March 1989 Licensee Answer Opposing Joint Intervenors Motion for Stay.* Stay of Licensing Board Decision Pending Appeal Unwarranted Under NRC Stds.Stay Could Delay Safe,Expeditious Cleanup of Facility.Certificate of Svc Encl ML20236C2441989-03-0808 March 1989 NRC Staff Response in Opposition to Application for Stay Filed by Joint Intervenors.* Application for Stay of Effectiveness of Final Initial Decision LBP-89-07,dtd 890202 Should Be Denied.W/Certificate of Svc ML20235V2641989-03-0202 March 1989 Notice of Aslab Reconstitution.* TS Moore,Chairman,Cn Kohl & Ha Wilber,Members.Served on 890303.W/Certificate of Svc ML20235V2161989-02-25025 February 1989 Changes & Corrections to Susquehanna Valley Alliance/Three Mile Island Alert Documents Submitted on 890221.* Certificate of Svc Encl 1999-07-21
[Table view] Category:TRANSCRIPTS
MONTHYEARML20154G2941998-09-17017 September 1998 Transcript of 980917 Public Meeting in Rockville,Md Re License Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen. Pp 1-41 ML20059J5171993-09-30030 September 1993 Transcript of 930923 Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-130.Related Documentation Encl ML20198E5581992-12-0101 December 1992 Transcript of Briefing by TMI-2 Advisory Panel on 921201 in Rockville,Md ML20059N5941990-10-0404 October 1990 Transcript of 900928 Public Meeting in Rockville,Md Re Studies of Cancer in Populations Near Nuclear Facilities, Including TMI ML20247G0361989-07-26026 July 1989 Transcript of Oral Argument on 890726 in Bethesda,Md Re Disposal of accident-generated Water.Pp 1-65.Supporting Info Encl ML20247D2761989-04-20020 April 1989 Transcript of 890420 Briefing in Rockville,Md on Status of TMI-2 Cleanup Activities.Pp 1-51.Related Info Encl ML20245A2961989-04-13013 April 1989 Transcript of 890413 Meeting in Rockville,Md Re Affirmation/Discussion & Vote ML20245A8381989-04-13013 April 1989 Transcript of Advisory Panel for Decontamination of TMI-2 890413 Meeting in Harrisburg,Pa.Pp 1-79.Supporting Info Encl ML20235N2161989-02-17017 February 1989 Follow-up Testimony Clarifying Position on Question of Disposition of Over 2 Million Gallons of Accident Generated Water.Related Documentation & Certificate of Svc Encl ML20235S9911989-02-16016 February 1989 Transcript of 890216 Public Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-119. Supporting Documentation Encl ML20206C9391988-11-0707 November 1988 Transcript of 881107 Hearing in Lancaster,Pa.Pp 1,122- 1,417.Witnesses:JA Auxier,Ji Fabrikant,Skolnik & Mather ML20235M7601988-11-0303 November 1988 Transcript of 881103 Public Hearing in Lancaster,Pa for Presentation of Limited Appearance Statements.Pp 998-1,121 ML20206C2801988-11-0303 November 1988 Transcript of 881103 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 859-997.Witnesses:JA Martin, SS Yaniv,F Skolnik,S Lewis & a Bhattacharyya ML20205Q6581988-11-0202 November 1988 Transcript of 881102 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 573-858.Supporting Documentation Encl.Witnesses:Gg Baker,Wj Cooper & L Munson ML20205Q6441988-11-0101 November 1988 Transcript of 881101 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 288-572.Supporting Info Encl. Witnesses:K Hofstetter,Kl Harner,L Thomas & M Masnik ML20205N5791988-10-31031 October 1988 Transcript of ASLB 881031 Meeting in Lancaster,Pa Re License Amend Application.Pp 87-287 ML20205P0451988-10-25025 October 1988 Transcript of 881025 Periodic Briefing by TMI-2 Advisory Panel in Rockville,Md.Pp 1-30 ML20205G1851988-10-25025 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Supporting Documentation Encl.Related Correspondence ML20205E5021988-10-24024 October 1988 Licensee Rebuttal Testimony of Ji Fabrikant on Health Effects of Tritium (Contention 5d).* Related Correspondence ML20155H1751988-10-11011 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Related Correspondence ML20155H1531988-10-11011 October 1988 Licensee Testimony of Ww Weaver on Accident Risks (Contention 2).* Related Correspondence ML20155H1901988-10-11011 October 1988 Licensee Testimony of Ja Auxier & Ji Fabrikant on Effects of Tritium (Contentions 3 & 5d).* Supporting Info Encl.Related Correpondence ML20155H1661988-10-11011 October 1988 Licensee Testimony of Kl Harner & Kj Hofstetter on Sampling & Analysis of accident-generated Water (Contentions 3 & 4b).* Related Correspondence ML20155H1401988-10-11011 October 1988 Licensee Testimony of Je Tarpinian on Occupational Dose Assessments (Contention 2).* Related Correspondence ML20155H1281988-10-11011 October 1988 Licensee Testimony of Dr Buchanan on Evaporation Proposal & Joint Intervenors Alternative (Contentions 2 & 3).* Related Correspondence ML20155H4751988-10-10010 October 1988 Testimony.* Discusses Environ Impact of Force Evaporation of 2.3 Million Gallons of accident-generated Water by Licensee. W/Certificate of Svc.Related Correspondence ML20155H4711988-10-10010 October 1988 Affidavit of Cw Huver (Contention 5):further Considerations of Biological Effects & Health Hazards of Tritium.* Copyrighted Matl Encl.Related Correspondence ML20154D5201988-09-0707 September 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880907 Meeting in Harrisburg,Pa.Pp 1-109.Supporting Documentation Encl ML20151G6951988-07-14014 July 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880714 Meeting in Harrisburg,Pa.Pp 1-140.Related Documentation Encl ML20196B6041988-05-26026 May 1988 Transcript of 880526 Advisory Panel Meeting in Harrisburg, PA to Discuss Decontamination of TMI-2.Pp 1-117.Supporting Documentation Encl ML20154N4101988-04-14014 April 1988 Transcript of 880414 Advisory Panel for Decontamination of TMI-2 Public Meeting in Lancaster,Pa.Related Info Encl. Pp 1-100 ML20148F2351988-03-17017 March 1988 Transcript of 880317 Briefing in Washington,Dc Re Status of TMI-2.Pp 1-51.Supporting Documentation Encl ML20236Y1061987-12-0808 December 1987 Transcript of Special Prehearing Conference on 871208 in Harrisburg,Pa Re Disposal of accident-generated Water. Pp 1-86 ML20238C6981987-10-0505 October 1987 Deposition of a Beach.* Transcript of 871005 Deposition in Washington,Dc Re R Parks Allegations.Pp 1-244.Supporting Documentation Encl ML20235J7071987-09-30030 September 1987 Transcript of 870930 Prehearing Conference in Bethesda,Md. Pp 225-343 ML20238D4641987-09-0909 September 1987 Transcript of 870909 Oral Argument in Bethesda,Md.Pp 1-57 ML20238C7531987-08-20020 August 1987 Vol II to Transcript of Hl Hofmann 870820 Deposition in San Francisco,Ca Re Civil Penalty.Pp 208-471 & 489-494. Supporting Documentation Encl ML20238C7891987-08-18018 August 1987 Deposition of Rd Parks.* Vol IV to Transcript of 870818 Deposition in San Francisco,Ca Re Civil Penalty.Pp 551-818. Supporting Documentation Encl ML20238C7651987-06-25025 June 1987 Deposition of Hl Hofmann.* Transcript of 870625 Deposition in San Francisco,Ca Re Civil Penalty.Pp 1-206 ML20238C8041987-06-24024 June 1987 Deposition of Rd Parks.* Vol III to Transcript of 870624 Deposition in Newport Beach,Ca Re Civil Penalty.Pp III-1 - III-89 ML20235J1271987-06-24024 June 1987 Deposition of Rd Parks.* Vols II & III of Transcript of Rd Parks 870624 Deposition.Related Correspondence ML20238C7981987-06-23023 June 1987 Deposition of Rd Parks.* Vol II to Transcript of 870623 Deposition in Newport Beach,Ca Re Civil Penalty.Pp II-1 - II-263.Supporting Documentation Encl ML20238C7941987-06-22022 June 1987 Deposition of Rd Parks.* Vol I to Transcript of 870622 Deposition in Newport Beach,Ca Re Civil Penalty.Pp 1-199. Supporting Documentation Encl ML20238C5921987-06-16016 June 1987 Deposition of R Meeks.* Transcript of 870616 Deposition in Washington,Dc Re Allegations of Harassment Against R Parks. Pp 1-198.Supporting Documentation Encl ML20238C6171987-06-16016 June 1987 Deposition of R Meeks.* Corrected Title Page of 870616 Deposition ML20215L2731987-05-0808 May 1987 Transcript of 870508 Prehearing Conference in Bethesda,Md.Pp 19-224.In Camera Session (Pp 101-138) Bound Separately ML20238C7331987-04-24024 April 1987 Deposition of Rc Arnold.* Transcript of 870424 Deposition in Washington,Dc Re Civil Penalty.Pp 1-224.Supporting Documentation Encl ML20212Q9801987-04-16016 April 1987 Transcript of 870416 Periodic Meeting W/Advisory Panel for Decontamination of TMI-2 in Washington,Dc.Pp 1-50.Supporting Documentation Encl ML20212Q8021987-04-15015 April 1987 Transcript of 870415 Briefing by DOE in Washington,Dc Re TMI-2 Core Exam Program.Pp 1-64.Viewgraphs Encl ML20238C6521987-04-10010 April 1987 Deposition of Bk Kanga.* Transcript of 870410 Deposition in Gaithersburg,Md Re R Parks.Pp 1-151.Supporting Documentation Encl 1998-09-17
[Table view] Category:DEPOSITIONS
MONTHYEARML20154G2941998-09-17017 September 1998 Transcript of 980917 Public Meeting in Rockville,Md Re License Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen. Pp 1-41 ML20059J5171993-09-30030 September 1993 Transcript of 930923 Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-130.Related Documentation Encl ML20198E5581992-12-0101 December 1992 Transcript of Briefing by TMI-2 Advisory Panel on 921201 in Rockville,Md ML20059N5941990-10-0404 October 1990 Transcript of 900928 Public Meeting in Rockville,Md Re Studies of Cancer in Populations Near Nuclear Facilities, Including TMI ML20247G0361989-07-26026 July 1989 Transcript of Oral Argument on 890726 in Bethesda,Md Re Disposal of accident-generated Water.Pp 1-65.Supporting Info Encl ML20247D2761989-04-20020 April 1989 Transcript of 890420 Briefing in Rockville,Md on Status of TMI-2 Cleanup Activities.Pp 1-51.Related Info Encl ML20245A2961989-04-13013 April 1989 Transcript of 890413 Meeting in Rockville,Md Re Affirmation/Discussion & Vote ML20245A8381989-04-13013 April 1989 Transcript of Advisory Panel for Decontamination of TMI-2 890413 Meeting in Harrisburg,Pa.Pp 1-79.Supporting Info Encl ML20235N2161989-02-17017 February 1989 Follow-up Testimony Clarifying Position on Question of Disposition of Over 2 Million Gallons of Accident Generated Water.Related Documentation & Certificate of Svc Encl ML20235S9911989-02-16016 February 1989 Transcript of 890216 Public Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-119. Supporting Documentation Encl ML20206C9391988-11-0707 November 1988 Transcript of 881107 Hearing in Lancaster,Pa.Pp 1,122- 1,417.Witnesses:JA Auxier,Ji Fabrikant,Skolnik & Mather ML20235M7601988-11-0303 November 1988 Transcript of 881103 Public Hearing in Lancaster,Pa for Presentation of Limited Appearance Statements.Pp 998-1,121 ML20206C2801988-11-0303 November 1988 Transcript of 881103 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 859-997.Witnesses:JA Martin, SS Yaniv,F Skolnik,S Lewis & a Bhattacharyya ML20205Q6581988-11-0202 November 1988 Transcript of 881102 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 573-858.Supporting Documentation Encl.Witnesses:Gg Baker,Wj Cooper & L Munson ML20205Q6441988-11-0101 November 1988 Transcript of 881101 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 288-572.Supporting Info Encl. Witnesses:K Hofstetter,Kl Harner,L Thomas & M Masnik ML20205N5791988-10-31031 October 1988 Transcript of ASLB 881031 Meeting in Lancaster,Pa Re License Amend Application.Pp 87-287 ML20205P0451988-10-25025 October 1988 Transcript of 881025 Periodic Briefing by TMI-2 Advisory Panel in Rockville,Md.Pp 1-30 ML20205G1851988-10-25025 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Supporting Documentation Encl.Related Correspondence ML20205E5021988-10-24024 October 1988 Licensee Rebuttal Testimony of Ji Fabrikant on Health Effects of Tritium (Contention 5d).* Related Correspondence ML20155H1751988-10-11011 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Related Correspondence ML20155H1531988-10-11011 October 1988 Licensee Testimony of Ww Weaver on Accident Risks (Contention 2).* Related Correspondence ML20155H1901988-10-11011 October 1988 Licensee Testimony of Ja Auxier & Ji Fabrikant on Effects of Tritium (Contentions 3 & 5d).* Supporting Info Encl.Related Correpondence ML20155H1661988-10-11011 October 1988 Licensee Testimony of Kl Harner & Kj Hofstetter on Sampling & Analysis of accident-generated Water (Contentions 3 & 4b).* Related Correspondence ML20155H1401988-10-11011 October 1988 Licensee Testimony of Je Tarpinian on Occupational Dose Assessments (Contention 2).* Related Correspondence ML20155H1281988-10-11011 October 1988 Licensee Testimony of Dr Buchanan on Evaporation Proposal & Joint Intervenors Alternative (Contentions 2 & 3).* Related Correspondence ML20155H4751988-10-10010 October 1988 Testimony.* Discusses Environ Impact of Force Evaporation of 2.3 Million Gallons of accident-generated Water by Licensee. W/Certificate of Svc.Related Correspondence ML20155H4711988-10-10010 October 1988 Affidavit of Cw Huver (Contention 5):further Considerations of Biological Effects & Health Hazards of Tritium.* Copyrighted Matl Encl.Related Correspondence ML20154D5201988-09-0707 September 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880907 Meeting in Harrisburg,Pa.Pp 1-109.Supporting Documentation Encl ML20151G6951988-07-14014 July 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880714 Meeting in Harrisburg,Pa.Pp 1-140.Related Documentation Encl ML20196B6041988-05-26026 May 1988 Transcript of 880526 Advisory Panel Meeting in Harrisburg, PA to Discuss Decontamination of TMI-2.Pp 1-117.Supporting Documentation Encl ML20154N4101988-04-14014 April 1988 Transcript of 880414 Advisory Panel for Decontamination of TMI-2 Public Meeting in Lancaster,Pa.Related Info Encl. Pp 1-100 ML20148F2351988-03-17017 March 1988 Transcript of 880317 Briefing in Washington,Dc Re Status of TMI-2.Pp 1-51.Supporting Documentation Encl ML20236Y1061987-12-0808 December 1987 Transcript of Special Prehearing Conference on 871208 in Harrisburg,Pa Re Disposal of accident-generated Water. Pp 1-86 ML20238C6981987-10-0505 October 1987 Deposition of a Beach.* Transcript of 871005 Deposition in Washington,Dc Re R Parks Allegations.Pp 1-244.Supporting Documentation Encl ML20235J7071987-09-30030 September 1987 Transcript of 870930 Prehearing Conference in Bethesda,Md. Pp 225-343 ML20238D4641987-09-0909 September 1987 Transcript of 870909 Oral Argument in Bethesda,Md.Pp 1-57 ML20238C7531987-08-20020 August 1987 Vol II to Transcript of Hl Hofmann 870820 Deposition in San Francisco,Ca Re Civil Penalty.Pp 208-471 & 489-494. Supporting Documentation Encl ML20238C7891987-08-18018 August 1987 Deposition of Rd Parks.* Vol IV to Transcript of 870818 Deposition in San Francisco,Ca Re Civil Penalty.Pp 551-818. Supporting Documentation Encl ML20238C7651987-06-25025 June 1987 Deposition of Hl Hofmann.* Transcript of 870625 Deposition in San Francisco,Ca Re Civil Penalty.Pp 1-206 ML20238C8041987-06-24024 June 1987 Deposition of Rd Parks.* Vol III to Transcript of 870624 Deposition in Newport Beach,Ca Re Civil Penalty.Pp III-1 - III-89 ML20235J1271987-06-24024 June 1987 Deposition of Rd Parks.* Vols II & III of Transcript of Rd Parks 870624 Deposition.Related Correspondence ML20238C7981987-06-23023 June 1987 Deposition of Rd Parks.* Vol II to Transcript of 870623 Deposition in Newport Beach,Ca Re Civil Penalty.Pp II-1 - II-263.Supporting Documentation Encl ML20238C7941987-06-22022 June 1987 Deposition of Rd Parks.* Vol I to Transcript of 870622 Deposition in Newport Beach,Ca Re Civil Penalty.Pp 1-199. Supporting Documentation Encl ML20238C5921987-06-16016 June 1987 Deposition of R Meeks.* Transcript of 870616 Deposition in Washington,Dc Re Allegations of Harassment Against R Parks. Pp 1-198.Supporting Documentation Encl ML20238C6171987-06-16016 June 1987 Deposition of R Meeks.* Corrected Title Page of 870616 Deposition ML20215L2731987-05-0808 May 1987 Transcript of 870508 Prehearing Conference in Bethesda,Md.Pp 19-224.In Camera Session (Pp 101-138) Bound Separately ML20238C7331987-04-24024 April 1987 Deposition of Rc Arnold.* Transcript of 870424 Deposition in Washington,Dc Re Civil Penalty.Pp 1-224.Supporting Documentation Encl ML20212Q9801987-04-16016 April 1987 Transcript of 870416 Periodic Meeting W/Advisory Panel for Decontamination of TMI-2 in Washington,Dc.Pp 1-50.Supporting Documentation Encl ML20212Q8021987-04-15015 April 1987 Transcript of 870415 Briefing by DOE in Washington,Dc Re TMI-2 Core Exam Program.Pp 1-64.Viewgraphs Encl ML20238C6521987-04-10010 April 1987 Deposition of Bk Kanga.* Transcript of 870410 Deposition in Gaithersburg,Md Re R Parks.Pp 1-151.Supporting Documentation Encl 1998-09-17
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20154G2941998-09-17017 September 1998 Transcript of 980917 Public Meeting in Rockville,Md Re License Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen. Pp 1-41 ML20059J5171993-09-30030 September 1993 Transcript of 930923 Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-130.Related Documentation Encl ML20198E5581992-12-0101 December 1992 Transcript of Briefing by TMI-2 Advisory Panel on 921201 in Rockville,Md ML20059N5941990-10-0404 October 1990 Transcript of 900928 Public Meeting in Rockville,Md Re Studies of Cancer in Populations Near Nuclear Facilities, Including TMI ML20247G0361989-07-26026 July 1989 Transcript of Oral Argument on 890726 in Bethesda,Md Re Disposal of accident-generated Water.Pp 1-65.Supporting Info Encl ML20247D2761989-04-20020 April 1989 Transcript of 890420 Briefing in Rockville,Md on Status of TMI-2 Cleanup Activities.Pp 1-51.Related Info Encl ML20245A2961989-04-13013 April 1989 Transcript of 890413 Meeting in Rockville,Md Re Affirmation/Discussion & Vote ML20245A8381989-04-13013 April 1989 Transcript of Advisory Panel for Decontamination of TMI-2 890413 Meeting in Harrisburg,Pa.Pp 1-79.Supporting Info Encl ML20235N2161989-02-17017 February 1989 Follow-up Testimony Clarifying Position on Question of Disposition of Over 2 Million Gallons of Accident Generated Water.Related Documentation & Certificate of Svc Encl ML20235S9911989-02-16016 February 1989 Transcript of 890216 Public Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-119. Supporting Documentation Encl ML20206C9391988-11-0707 November 1988 Transcript of 881107 Hearing in Lancaster,Pa.Pp 1,122- 1,417.Witnesses:JA Auxier,Ji Fabrikant,Skolnik & Mather ML20235M7601988-11-0303 November 1988 Transcript of 881103 Public Hearing in Lancaster,Pa for Presentation of Limited Appearance Statements.Pp 998-1,121 ML20206C2801988-11-0303 November 1988 Transcript of 881103 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 859-997.Witnesses:JA Martin, SS Yaniv,F Skolnik,S Lewis & a Bhattacharyya ML20205Q6581988-11-0202 November 1988 Transcript of 881102 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 573-858.Supporting Documentation Encl.Witnesses:Gg Baker,Wj Cooper & L Munson ML20205Q6441988-11-0101 November 1988 Transcript of 881101 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 288-572.Supporting Info Encl. Witnesses:K Hofstetter,Kl Harner,L Thomas & M Masnik ML20205N5791988-10-31031 October 1988 Transcript of ASLB 881031 Meeting in Lancaster,Pa Re License Amend Application.Pp 87-287 ML20205P0451988-10-25025 October 1988 Transcript of 881025 Periodic Briefing by TMI-2 Advisory Panel in Rockville,Md.Pp 1-30 ML20205G1851988-10-25025 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Supporting Documentation Encl.Related Correspondence ML20205E5021988-10-24024 October 1988 Licensee Rebuttal Testimony of Ji Fabrikant on Health Effects of Tritium (Contention 5d).* Related Correspondence ML20155H1751988-10-11011 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Related Correspondence ML20155H1531988-10-11011 October 1988 Licensee Testimony of Ww Weaver on Accident Risks (Contention 2).* Related Correspondence ML20155H1901988-10-11011 October 1988 Licensee Testimony of Ja Auxier & Ji Fabrikant on Effects of Tritium (Contentions 3 & 5d).* Supporting Info Encl.Related Correpondence ML20155H1661988-10-11011 October 1988 Licensee Testimony of Kl Harner & Kj Hofstetter on Sampling & Analysis of accident-generated Water (Contentions 3 & 4b).* Related Correspondence ML20155H1401988-10-11011 October 1988 Licensee Testimony of Je Tarpinian on Occupational Dose Assessments (Contention 2).* Related Correspondence ML20155H1281988-10-11011 October 1988 Licensee Testimony of Dr Buchanan on Evaporation Proposal & Joint Intervenors Alternative (Contentions 2 & 3).* Related Correspondence ML20155H4751988-10-10010 October 1988 Testimony.* Discusses Environ Impact of Force Evaporation of 2.3 Million Gallons of accident-generated Water by Licensee. W/Certificate of Svc.Related Correspondence ML20155H4711988-10-10010 October 1988 Affidavit of Cw Huver (Contention 5):further Considerations of Biological Effects & Health Hazards of Tritium.* Copyrighted Matl Encl.Related Correspondence ML20154D5201988-09-0707 September 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880907 Meeting in Harrisburg,Pa.Pp 1-109.Supporting Documentation Encl ML20151G6951988-07-14014 July 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880714 Meeting in Harrisburg,Pa.Pp 1-140.Related Documentation Encl ML20196B6041988-05-26026 May 1988 Transcript of 880526 Advisory Panel Meeting in Harrisburg, PA to Discuss Decontamination of TMI-2.Pp 1-117.Supporting Documentation Encl ML20154N4101988-04-14014 April 1988 Transcript of 880414 Advisory Panel for Decontamination of TMI-2 Public Meeting in Lancaster,Pa.Related Info Encl. Pp 1-100 ML20148F2351988-03-17017 March 1988 Transcript of 880317 Briefing in Washington,Dc Re Status of TMI-2.Pp 1-51.Supporting Documentation Encl ML20236Y1061987-12-0808 December 1987 Transcript of Special Prehearing Conference on 871208 in Harrisburg,Pa Re Disposal of accident-generated Water. Pp 1-86 ML20238C6981987-10-0505 October 1987 Deposition of a Beach.* Transcript of 871005 Deposition in Washington,Dc Re R Parks Allegations.Pp 1-244.Supporting Documentation Encl ML20235J7071987-09-30030 September 1987 Transcript of 870930 Prehearing Conference in Bethesda,Md. Pp 225-343 ML20238D4641987-09-0909 September 1987 Transcript of 870909 Oral Argument in Bethesda,Md.Pp 1-57 ML20238C7531987-08-20020 August 1987 Vol II to Transcript of Hl Hofmann 870820 Deposition in San Francisco,Ca Re Civil Penalty.Pp 208-471 & 489-494. Supporting Documentation Encl ML20238C7891987-08-18018 August 1987 Deposition of Rd Parks.* Vol IV to Transcript of 870818 Deposition in San Francisco,Ca Re Civil Penalty.Pp 551-818. Supporting Documentation Encl ML20238C7651987-06-25025 June 1987 Deposition of Hl Hofmann.* Transcript of 870625 Deposition in San Francisco,Ca Re Civil Penalty.Pp 1-206 ML20238C8041987-06-24024 June 1987 Deposition of Rd Parks.* Vol III to Transcript of 870624 Deposition in Newport Beach,Ca Re Civil Penalty.Pp III-1 - III-89 ML20235J1271987-06-24024 June 1987 Deposition of Rd Parks.* Vols II & III of Transcript of Rd Parks 870624 Deposition.Related Correspondence ML20238C7981987-06-23023 June 1987 Deposition of Rd Parks.* Vol II to Transcript of 870623 Deposition in Newport Beach,Ca Re Civil Penalty.Pp II-1 - II-263.Supporting Documentation Encl ML20238C7941987-06-22022 June 1987 Deposition of Rd Parks.* Vol I to Transcript of 870622 Deposition in Newport Beach,Ca Re Civil Penalty.Pp 1-199. Supporting Documentation Encl ML20238C5921987-06-16016 June 1987 Deposition of R Meeks.* Transcript of 870616 Deposition in Washington,Dc Re Allegations of Harassment Against R Parks. Pp 1-198.Supporting Documentation Encl ML20238C6171987-06-16016 June 1987 Deposition of R Meeks.* Corrected Title Page of 870616 Deposition ML20215L2731987-05-0808 May 1987 Transcript of 870508 Prehearing Conference in Bethesda,Md.Pp 19-224.In Camera Session (Pp 101-138) Bound Separately ML20238C7331987-04-24024 April 1987 Deposition of Rc Arnold.* Transcript of 870424 Deposition in Washington,Dc Re Civil Penalty.Pp 1-224.Supporting Documentation Encl ML20212Q9801987-04-16016 April 1987 Transcript of 870416 Periodic Meeting W/Advisory Panel for Decontamination of TMI-2 in Washington,Dc.Pp 1-50.Supporting Documentation Encl ML20212Q8021987-04-15015 April 1987 Transcript of 870415 Briefing by DOE in Washington,Dc Re TMI-2 Core Exam Program.Pp 1-64.Viewgraphs Encl ML20238C6521987-04-10010 April 1987 Deposition of Bk Kanga.* Transcript of 870410 Deposition in Gaithersburg,Md Re R Parks.Pp 1-151.Supporting Documentation Encl 1998-09-17
[Table view] |
Text
9 s
i
- g. O RELATED CORREspONDM O g renr3 LIC 9/15/80
, ' c .g
~ -
y c..y]p y 11980 >
5
- s UNITED STATES OF AMERICA k, , NUCLEAR REGULATORY COMMISSION M s 1
i BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
METROPOLITAN EDISON COMPANY ) Docket No. 50-289
) (Restart)
(Three Mile Island Nuclear )
Station, Unit No. 1) )
LICENSEE'S TESTIMONY OF JOSEPH A. TORCIVIA AND PAUL J. SHIPPER, JR.
IN RESPONSE TO UCS CONTENTION NO. 4 (CONNECTION OF PRESSURIZER HEATER TO DIESEL)
/
0 '
999'p 6 l
i OUTLINE j The purposes and objectives of this tesimony are to respond to UCS Contention No. 4 which asserts that design provisions to enable pressurizer deaters to be added to on-site er gency (diesel) power supplies in the event of postulated loss of off-site power events have not been demonstrated to no t degrade these emergency power supplies. This testimony presents the provisions that assure that on-site emergency power supplies are protected by the proper application of design features, administrative procedures and protective 1
devices.
l l
\
l f
1
-i-I
, I
INTRODUCTION ,
This testimony, by Mr. Joseph A. Torcivia , GPU, Senior Project Engineer , and Mr. Paul J. Shipper, Jr., Project Electrical Engineer , Gilbert Associates, Inc., is addressed to the following contention:
UCS CONTENTION NO. 4 Rather than classifying the pressurizer heaters as safety-grade, the staff has proposed simply to add the pressurizer heaters to the on-site emergency power supplies. It has not been demonstrated that this will not degrade the capacity, capability and reliability of these power supplies in violation of GDC 17. Such a demonstration is required to assure protection of public health and safety.
RESPONSE TO UCS CONTENTION NO. 4 BY WITNESSES TORCIVIA AND SHIPPER:
l NUREG-0578, Section 2.1 requires that a limited number of pressurizer heaters shall have the capability of being connec-ted to the emergency buses under loss of off-site power events in a manner that will provide redundant power supply capabil-ity.
Adding heaters to the emergency buses provides additional assurance that the pressurizer heaters will be available. The use of the pressurizer heaters is the normal and, therefore, the most desirable means for maintaining the pressure of the reactor coolant system during natural circulation.
Licensee's testimony in response to UCS Contention 3 (Safety Classification) explains why it is not necessary for the pressurizer heaters to be qualified as a safety-grade Emergency Core Cooling System (ECCS) .
Pressurizer heaters are normally supplied from two !
non-essential, Balance of Plant (BOP), 480 volt electrical !
buses. Power to these buses would be lost, however,( Jring postulated loss of off-site power events. Ther efore , the two 480 volt buses supplied by emergency diesel generators can be "tilized to provide emergency power to the pressurizer heaters.
The electrical arrangement of the design is shown in Figure 1. The design provides the means to: l
- a. Normally supply all pressurizer heaters from BOP buses.
- b. Manually connect pressurizer heater group 8 to emergency " bus" "lP", but not to emergency bus "1S".
- c. Manually connect pressurizer heater group 9 to emergency bus "lS", but not to emergency bus "lP".
- d. Prevent any possible interconnection of emergency bus "lP" with emergency bus "lS".
e.
Prevent the interconnection of a BOP bus with l an emergency bus. l l
l 1
l .
i t
Contrary to UCS Contention 4, this modification does not degrade the emergency buses in violation of GDC 17. Normally, the heaters would be supplied from off-site power and would not be connected to the emergency diesel buses. In the event of a Itss of off-site power, the operator may make the manual transfer of power supplies to restore portions of the pressurizer heaters. This transfer process employs a number of different kirk key interlocks that force a step by step process in a fixed sequence which requires an individual to obtain and utilize keys and specific electrical devices to:
1
- a. Trip the breaker at the BOP bus .
- b. Open the disconnect device enclosure in the l
Turbine Building and remove the disconnect l
assembly.
- c. Carry the disconnect assembly to the 480 volt ES switchgear room in the Control Building.
- d. Insert the disconnect assembly in the disconnect device enclosure in the Control Building.
- e. Engage the pressurizer heater emergency power feeder breaker into its compartment.
- f. Operate the control switch to close the associated feeder breaker if conditions permit.
The manual transfer, therefore, is controlled by design, administrative procedure, kirk key interlocks and protective devices that prevent paralleling or degrading redundant power supplies.
TMI-l Emergency Procedures specify that only one group of pressurizer heaters be connected to an emergency bus at any one
~
time, and that sufficient capacity be available for the emergency diesel generator to handle the pressurizer heater loads as verified by wattmeter indication. Further , the rated I capacity of the diesel has been verified as being capable of handling the heaters in addition to the safety related loads required during loss of off-site power events.
Diverse means of tripping the pressurizer heater loads from the safety-related buses are provided to assure that the capacity, capability and reliability of the safety bus to supply power to safety loads is not degraded. These diverse
, trips are:
i
- 1. Automatic safety features actuation signal trip (ESFAS) - There are three separate and independent signals that produce this safety l action (accident) signal which will trip the pressurizer heater loads.
- 2. Low emergency bus voltage trip - Emergency bus voltage is an indicator of the capability of the emergency bus to supply power to safety loads. Three (3) under-voltage relays
are provided, any one of which will trip the pressurizer heater load from the emergency bus when the voltage level indicates that that capability is jeopardized.
- 3. The distribution breaker thermal magnetic overload trip elements - One of the three (3) distribution breakers will trip the pressurizer heater elements it powers if a fault exists on those elements.
- 4. Main feeder breaker overcurrent trip elements
- This breaker , which is in series with the breakers mentioned in Item 3 above, will also provide a backup trip for a fault on the pressurizer heater elements.
- 5. Manual trip.
i Regulatory Guide 1.75, dated September 1978, presents the I basis for isolation of non-Class lE loads from Class lE power supplies (emergency buses) in Paragraph Cl:
Also, the susceptability of non-Class lE loads energized from redundant Class lE power sources to design basis events (e.g., seismic events) could similarly threaten the redundant main (bus) circuit breakers.
This establishes the basis for providing isolation of the pressurizer heater loads from the emergency buses. It al so i
implies that the purpose of this isolation is to prevent a fault on the pressurizer heaters from causing the main l
emergency bus circuit breaker to trip and thereby remove
i electrical power from safety loads during the performance of l
their safety function. The Regulatory Guide further states:
It is recognized that proper breaker or fuse coordination would preclude such an event.
However, because the main (bus) breakers are in series with the fault and could experience momentary currents above their setpoints, it is prudent to l';eclude the use of interrupting devices actuated only by fault current. . . . '
The con ern is that while a breaker in the supply chain to the .
non-Class r* od would isolate the fault if properly coordi-nated, that breaker may fail to respond to an above normal I current and thereby force the main bus breaker to function to isolate the fault. The electrical supply feeder to the pressurizer heater loads has two circuit breakers ( refer to Items 3 and 4 in the preceeding paragraph) in series, and each has coordinated overcurrent tripping elements. Therefore, a failure of either breaker overcurrent element to operate does not prevent the other from successfully isolating the fault before the time-current setting of the main emergency bus .
breaker is reached. Voltage on the emergency bus for a fault on the pressurizer heaters would also cause the under voltage relays (refer to Item 2 in the preceeding paragraph) to cause opening of the main pressurizer heater supply breaker to isolate the fault by a shunt trip independent of the overcur-rent tr ip.
It should be noted that while an overcurrc . v ic e requires sensing of a condition above normal to trip, unuervol-tage relays require a normal value to restrain them from tripping and trip for a value below normal. Therefore, in this
( ,
l
application the undervoltage relay can be considered as fail-safe in that a failure in its sensing circuit would produce a trip.
It also stated in the Regulatory Guide that:
Breakers that trip on receipt of a signal other than one derived from the fault current or its effects (e.g., an accident signal) are accept-able....
As previously stated, (refer to Item 1 above) this design does also incorporate an ESFAS signal trip.
In conclusion, and as stated in the Regulatory Guide, "The standard defines ' isolation device' in terms of preventing malfunctions in one section of circuit from causing unaccept-able influe:nces in other sections of the circuit." At TMI-1, the pressurizer heater loads are:
- a. Normally not connected to the emergency buses. The disconnect means is manual with a visable break.
- b. When required, only one group of pressurizer heaters are powered from one emergency bus at one time. The connection means precludes interconnection of emergency buaes and/or interconnection of a BOP bus with an emergency bus.
- c. Automatically tripped front the emergency bus by diverse signals: A failure of any one of the signals below does not prevent the I
l
successful isolation of a fault on the l pressurizer heaters.
- 1. Accident signals.
- 2. Undervoltage signals.
- 3. Overcurrent trip signals of two breaP'rs in series.
It is concluded tha t the addition of pressurizer heaters i
to the emergency buses when required does not degrade the capacity, capability and reliability of these power supplies and complies with GDC 17.
l l
l l
i
_ di s )W. C .?s. tatl*. B D _
, 4 e rs O V. F..i 9*'3", 9 F.
I L 's 9 iJ' 3.
L '<.f Ef.5" 9
~ <2eu,,r e<oi.
. s so, ,, . ...ies ce...ur.: ., , ,-: Im..-.tR 4eov. t.s. eux. o c W.c)
)t"t* anov, t.3. co: is (c.rtanu) -
i i i i I -1 i i i i H
') )- ) II ) El ) vp ,...) miu rr.rtat g ., - ens ..cx i) i) 3y _.) +i.a.r.tetc= en oc ') )
g o c= recsunene O&ies. .
os cit e.scincuits B&1 ts.2 orurn e.s.cincuit s M DEEAf t3! EVMW certculf S
- . < 'A '
A 6 4 84 M
a w a M q 3 6 9 a _,
(c DetTRIBUT eo6J $3rtEAWEst
, _ -_ _ , F^*3El S ~.
--1 MEcseAtticAq. MattK s(LY IDJTEt(Lccn l - @ unoasavoi.vac.e. nei.ny l l i > > i , ) > > i e i t I cu.Soe un4:Aine en _ , _
$NS800 C0 4I AINM&64I L._ . , _
c' c' t~' c' c' c' ent3suustty rerosuniten setAT Eis:8 C#!Oot* 8 HEA1ER G'.DOP 9 9 to MW 424 KW s
Tii~re,s..<,sh i. c ietn uie =e n., emm a,e FIGURE I ol en. o. I nna '
warm cee e
JOSEPH A. TORCIVIA Business Address: GPU Service Corporation 100 Interpace Parkway Parsippany, New Jersey 07054 Education: B.S.E.E., Pratt Institute, 1936.
Post-graduate courses in: protective relaying including extensive experience in coordination and ground fault studies; process control and instrumentation for industrial plants; industrial electronics; cathodic protection; and, switchgear and motor controls in all voltage classifications.
Expe rience : Lead Senior Electrical Engineer, GPU Service Corporation, 1972 to present.
Responsible for the design, documentation, and review of all power. equipment for the nuclear powered electric generating stations of the GPU system. Responsible for the major studies and responses to the NRC related to the electric power equipment.
Engineer, C.F. Braun Architectural Engineering Corp., 1971 to 1972.
Responsible for performing process control engineering projects for chemical and electrical industrial organizations.
Plant Manager, Federal Pacific Electric Company, 1970 to 1971.
Overall responsibility for manufacturing of power equipment.
Engineer, A.G. McKee Architectural Engineering Company, 1969 to 1970.
Responsible for process control applications for the petrochemical ind us try.
Westinghouse International, 1968 to 1969, consulting sales applications overseas.
i
Engineering Manager, Westinghouse Electric Corporation, 1936 to 1968. Responsible for engineering of manufactured switchgear motor control and all types of power equipment for Manufacturing Division.
Professional Affiliations: Member, IEEE - IAS Group.
Registered Professional Engineer, New Jersey and Massachusetts.
1 PAUL J. SHIPPER, JR.
Business Address: Gilbert Associates, Inc.
525 Lancaster Avenue Reading, Pennsylvania 19603 Education: B.S.E.E., The Pennsylvania University, 1966 Experience: Project Electrical Engineer, Gilbert Associates, Inc., 1979 to present.
Responsible for Metropolitan Edison Company's Three Mile Island Unit 1 Continuing Services Restart Program; and assisted Three Mile Island Unit 2 plant staff during accident and recovery.
Project Electrical Engineer, Gilbert Associates, Inc., 1974 to 1979.
Responsible for continuing engineering services for Metropolitan Edison j Company's Three Mile Island Nuclear l
Station, Unit 1; coordinator of Three l Mile Island Nuclear Station Unit 2 I cable routing data processing program- l and electrical design for all volatile l treatment condensate demineralizer installations for Rochester Gas and Electric Corporation's R.E. Ginna Nuclear Power Plant, Unit 1.
Project Electrical Engineer, Gilbert Associates, Inc., 1971 to 1974.
Responsible for completion of the engineering design and licensing of Metropolitan Edison Company's Three Mile Island Nuclear Station, Unit 1, and provided coordination for Unit 1 with Unit 2 design interface problems.
Also assisted in balance of plant studies for Gulf General Atomic for their standard 1140 MW HTGR Nuclear Generating Station.
l
Project Electrical Engineer, Gilbert Associates, Inc., 1969 to 1971.
Responsible for the design of gas '
turbine generating stations, including short circuit studies, plant layout, physical electrical distribution, application of equipment, electrical construction specification, underg-round ducts, review of purchased tur-bine package, and substation work on various generating plants.
Junior Electrical Engineer, Gilbert Associates, Inc., 1966 to 1969.
Involved in design of control systems, cabling and physical wire checking; application, evaluation and purchase of equipment; and startup of 2 mine-mouth coal-fired units for Pennsylvania Electric Company's Homer City Generating Station.
Engineering Trainee, Metropolitan Edison Company, 1965. Worked on conversion of Metropolitan Edison Eastern Division Load Flow Study from a-c network analyzer to digital computer.
Professional Affiliations: Registered Professional Engineer, Pennsylvania.
Publications: " Review of Cable Installation at Three Mile Island, Unit 1," GAI Report No.
2042.
- - -- --, - - , . -