Proposed Tech Spec Changes to Sections 2.19 & 3.15 Re Requirements for Operation & Surveillance of Halon Fire Suppression SysML19344A668 |
Person / Time |
---|
Site: |
Fort Calhoun ![Omaha Public Power District icon.png](/w/images/6/6a/Omaha_Public_Power_District_icon.png) |
---|
Issue date: |
08/18/1980 |
---|
From: |
OMAHA PUBLIC POWER DISTRICT |
---|
To: |
|
---|
Shared Package |
---|
ML19344A662 |
List: |
---|
References |
---|
NUDOCS 8008210422 |
Download: ML19344A668 (4) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 ML20078P8251995-02-10010 February 1995 Proposed Tech Specs 2.10 to Relocate Requirements for Incore Instrumentation Sys ML20077S1691995-01-0909 January 1995 Proposed Tech Specs,Reflecting Deletion of Requirements for Toxic Gas Monitoring Sys ML20078G8981994-11-11011 November 1994 Proposed Tech Specs 5.2 & 5.5,reflecting Administrative Changes ML20024J3921994-10-0707 October 1994 Proposed Tech Specs,Deleting SRs in TS 3.6(3)a for Eight Raw Water Backup Valves to Containment Cooling Coils,Deleting SRs in TS 3.2,Table 3-5,item 6 for 58 Raw Water Valves & Revising Basis of TS 2.4 to Reflect Changes ML20069H9261994-06-0606 June 1994 Proposed Tech Specs Incorporating Changes to Credit Leak Before Break Methodology to Resolve USI A-2, Asymmetrical Blowdown Loads on Rcps ML20069D8451994-05-25025 May 1994 Proposed Tech Specs Requesting one-time Schedular Exemption from 10CFR50.36a(2) ML20062N4211993-12-28028 December 1993 Proposed TS Tables 3-1 & 3-2 Re Min Frequencies for Checks, Calibrs & Testing of RPS & Min Frequencies for Checks, Calibrs & Testing of ESFs & Instrumentation & Controls, Respectively LIC-93-0228, Proposed Tech Specs Incorporating Changes to Leak Before Break Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys1993-08-20020 August 1993 Proposed Tech Specs Incorporating Changes to Leak Before Break Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys ML20045H1791993-07-12012 July 1993 Proposed TS 2.14,Table 2-1,Item 6.b Re ESF Sys Initiation, Degraded Voltage Setting Limits LIC-93-0159, Proposed Tech Specs Incorporating Administrative Changes1993-06-17017 June 1993 Proposed Tech Specs Incorporating Administrative Changes ML20128E5341993-02-0808 February 1993 Proposed Tech Specs Deleting Section 5.9.4 Re Radioactive Effluent Release Rept.Draft Chemistry Manual Procedure Encl ML20128C0461993-02-0101 February 1993 Proposed TS Figures 2-1A & 2-1B Re pressure-temp Limits for Heatup & Cooldown,Respectively 1999-05-26
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR LIC-98-0141, SG Eddy Current Test Rept for 1998 Refueling Outage. with1998-10-27027 October 1998 SG Eddy Current Test Rept for 1998 Refueling Outage. with ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20211N7591997-10-0202 October 1997 Rev 0 to Fort Calhoun Station Unit 1 Operating Instruction, OI-ES-3, Engineered Safeguard Controls Normal Mode 1,2 & 3 Alignment Check ML20211N7521997-09-21021 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-04, Annunciator Marking ML20211N7471997-09-12012 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-08, Plastic Label Usage ML20211N7661997-08-25025 August 1997 Rev 4 to Fort Calhoun Station Unit 1 Annunciator Response Procedure ARP-1, APR-1 Annunciator Response Procedure ML20211N7411997-08-24024 August 1997 Rev 0 to Fort Calhoun Operations Dept Policy & Directive OPD-5-14, Test Monitor Program ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls ML20134J6841997-01-20020 January 1997 Rev 5,Change a to Security Training & Qualification Program LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20129C5351996-03-0101 March 1996 Rev 0 to Incore Instrumentation Operability Requirements ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20108A7161995-12-19019 December 1995 Rev 7 to CH-ODCM-0001, ODCM, Incorporating TS Amend 171 for Section 3.1 Update/Reflect Changing Environ ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20091P4011995-09-0101 September 1995 Rev 3 to Fort Calhoun Station ISI Program Plan Third Ten-Yr Interval 1993-2003 ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20085M0081995-06-15015 June 1995 Rev 2 to ISI Program Plan for 1993-2003 Interval ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20108A7121995-03-15015 March 1995 Rev 6 to CH-ODCM-0001, ODCM, Incorporating New TS Amend 164 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 1999-05-26
[Table view] |
Text
,
- g_ _
-g"" .
- . e_
' 12.0. ~ LIMITING CONDITIONS FOR OPEph.~0N
.19 LFire Protection System (Continued)
LThe' fire hose staticas designated in Table 2-8 shall be oper-
~
(6) able.1With a hose statioiinoperable, provide a hose of equiva-
' lent:capasity which can service'the unprotected areas frem an
- , / operable hose'staticn withia one hour from the time that a hose e
station is determined to be inoperable.'
-(T) LAll' penetration fire inrriers protecting safety related areas
.v 'shall' be functional .(intact). With a-penetration fire barrier non-functionalJ a continuous fire watch shall be established
- on one" side of the affected' penetration within one hour. -
.(8) The.switchgear room halca system shall be. operable with the stor-
. age tanks having at least.90% of full charge pressure and 95% of
. full' charge weight or. level. With a halon system inoperable, establish an' hourly fire watch with. backup fire suppression equipment. Restore the system to operable status within ik
~~
. days, or prepare and sub:.it a report to the Nuclear Regulatory Commission, pursuant to Section 5 9 3 of the Technical Specifi-cations, within an additional 30 days, outlining the cause of the inoperability and the plans for restoring the system to operable status.
Basis The fire protection system pr: tides a'means for detecting, alarming,
'and extinguishing plant fires. The system is divided into the fire detection / subsystem and fire +.mtinguishing subsystem.
The fire ~ detection subsystem is an instrumentation system which alarms control room operators of a fire, indicating fire location on a panel
-in the centrol room and providing a local indication from the detector
.in:the affected zone.
. The' fire extinguishing system includes the sprinklers which protect the
' Diesel Generator Rooms. Also included are the hose stations which pro-tect the immediate_ vicinity outside the entire plant, hose cabinets in-side;the intake structure, and other miscellaneous equipment.
Specir. Nation 2.19(2); allows cae_ of the four fire detection zones to be rinoperile- in the containment. One inoperable zone would not signi-Kficantly reGee ; fire detection capability or margins of safety or pro-
.tection forithe 'following reasons:
- (1) ' JA large number of fire detectors at many locations and eleva-
~
Ltions exist'in the containment vessel.
~
'(2)~ 'During normal operation, containment fans provide complete circulation 1and mixi.g of containment air,zthereby exposing most of the ' containment fire detectors to any locally pro-
~
duced!co=bustion prc'.uct3.
j-(3) I Normally, cantainment vantilation duct fire detectors are.
operable and areLcontinuously exposed to air streams origi-J >
.-natingLfrom.all locar bns~in the -ontainment.
Amendment No. 38: ..
'2-92 ATTAC E NT A
~
"i8008210M22 i
2 W
'9' x - 'V..
- 2. 3. 0 - SURVEILLANCE REQUIREMENTS'
.3.15~ : Fire' Protection System _(Continued)"
,. (6) .The diesel. fire pump shall be demonstrated OPERABLE:
~
- a .. . At 'least'once - per: month' _by verifying that the fuel stor-age tank?contains.at least 200 gallons of fuel.
,b., At .least once per: quarter by verifying that a sample of diesel' fuel .from the - fuel' storage tank,' obtained-in ac-M cordance with' ASTM-D270-65, is within the acceptable-limits specified in Table 1 of ASTM-D975-Th with res-c pect. to'viscositys vaier centent and sediment.
L c. . 'At least-once per 18 months,..during shutdown, by sub-jecting the dieselLto an, inspection in accordance with
. procedures prepared in conjunction with its manufacturer's ,
recommendations for the class of service.
_(7)J :The fire pump diesel starting 2k-volt battery bank and charger
- 4 shall be demonstrated OPERABLE:
- a. At least once per month by verifying that the electrolyte level of each battery is above the plates.
-b. At least once per quarter by verifying that the specific gravity _ is appropriate -for continued service of the bat-tery,
- c. At least.once per 18 months by verifying that:
'l. The batteries and battery. racks show no visual in-
'dication of physical damage or abnormal deteriora-
-2. . The battery-to-battery and terminal _ connections are
. clean, tight, = essentially free of corrosion and suit-
~a ble corrosion protection is used.
(8). The switchgear room halon system shall be -demonstrated to be
. operable:
a.- .i At least .once per month by veritying that each valve in the flow path is in its correct position.
' b . -- 1 At least once _ every 6 months by verifying each halon st'orage tank pressure and weight.or_ level.
- c. -At;1 east once every_18 conths by:
. l. cVerifying the system,. including associated ventila-tion dampers'(if applicable), is actuated by a simu--
~ ;1ated_ test-signal.' ' Manual and automatic test signals ,
- _ vill.be alternated every 18 months. l
-e Visual-inspection of spray headers to verify integrity.
_ - 2.
.. Amendment 4No.: 38:; 3-82:
^ # *
'p
-a 3.0 SURVEILLANCE REQUIRDIENTS 3.15 Fire Protection System (Continued) 3 Visual inspection of all nozzles to ensure no blockage.
- d. At least once every three years by performing an air flow test through each header and nozzle to assure no blockage.
Basis The fire protection system provides a means for detecting, alarming, and extinguishing plant fires. The system is divided into the fire detection subsystem and fire extingaishing subsystem.
The fire detection subsystem is an instrumentation system which alarms control room operators of a fire, indicating fire location on a panel in the control room,- and providing local indication frem the detector in the affected zone.
The fire extinguishing system includes the sprinklers which protect the Diesel Generator Rooms. Also included are the hose stations which pro-tect the i= mediate vicinity outside the entire plant, hose cabinets in-side the intake structure, and other miscellaneous equipment.
Maintaining the operability of the fire protection system under various operating conditions is essential to insure the integrity of various nuclear safety related plant syste=s and equipment. The above sur-veillance measures aid in accomplishing this objective.
Specification 315(2)f. provides a surveillance program that insures that silt and other material in the river water will not prevent the delivery of water to areas protected by fire water suppression systens.
Amendment No.'h0~ 3-83^
I.
s.
DISCUSSION In accordance with-Section 3.1.8 of the Concission's' Safety Evaluation Report (SER) for the Fort Calhoun Station fire pro-tection progray, the Omaha Public Power District will have a halon
- system installed, as noted in the proposed specificiations, in October, 1980. The preposed specifications specify limiting con-
~
l
[
ditions for operation and surveillance measures for the halon sys-tem to be installed in the switchgear room.
The specifications require that the halon system be maintained in operable, status with storage tanks having at least 90% of full charge pressure and 95% of full charge weight or level. This requirement ensures that .the system contains an adequate supply of halon. In addition, the specificacions provide assurance that system operability.is =aintained by requiring that system pressure and tank veight or level te verified.tvice a year, that autonatic and manual test signals be introduced, and that visual inspections and air flow tests be conducted at a prescribed frequency. These spec-
'ifications, if implemented, vould not be inimical to the health and safety of the public.
1 ATTAC&iE*IT B s