ML19327B441

From kanterella
Revision as of 20:45, 6 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements for Spent Fuel Pool Structural Integrity & Insp Frequencies
ML19327B441
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/19/1989
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19327B440 List:
References
NUDOCS 8910310205
Download: ML19327B441 (2)


Text

. . . . , , , , .. v ,v~ ~o w

/(; ? ',- , ' , A ,6 #

4' '.'l -, i 4 , >

- , 3.c

'y .. .

,; .

,

,

-

'

.. '

.,

i ,, '

.

.

5

(.

%

h.'.

J- ,

-

,.

\ gI

.

,

,

' 4 4

i

,

PROPOSED TECHNICAL SPECIFICATION CHANGE 9 ,

,

1.

i m;. ,

?-

,

3.

1.

2910310205 691019

'

PDR ADOCK 05000368 t- P PDC J.

!'

,;.

_m

-

. ,

t , n ,

i.

p.,.-
p. ,  ; ,

'

.

PLANT SYSTEMS

~

3/4.7.12 SPENT FUEL POOL STRUCTURAL INTEGRITY c LIMITING CONDITION FOR OPERATION 3.7.12'.The structural integrity of the spent fuel pool shall be maintained  :

in accordance with Specification 4.7.12. '

APPLICABILITY: Whenever irradiated fuel assemblies are in the spent fuel pool. ,

'

ACTION:

a. . With the structural integrity of the spent fuel pool not conforming to the above requirements, in lieu of any other report, prepare and submit a Special . Report to.the Commission pursuant to Specification 6.9.2 within 30 days of a determination of suen >

non-conformity,

b. The provisions of Specification 3.0.3 are not applicable.

.,

'

SURVEILLANCE REOUIREMENTS l

l 4.7.12.1 Inspection Frequencies - The structural integrity of the spent I fuel pool shall be determined per the acceptance criteria of Specificaticn '

l 4.7.12.2 at the following frequencies:

a. At least'once per 92 days after the pool is filled with water. If no abnormal degradation or other indications of structural

"

distress are detected during five consecutive inspections, the inspection internal may be extended to at least once per 5 years. j ,

b. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following any seismic event which actuater o.'

l should have actuated tne seismic monitoring Instrumentation of i Specification 3.3.3.3.

4.7.12.2 Acceptance Criteria - The structural integrity of the spent fuel

i. pool shall be determined by a visual inspection of at least the interior and exterior surfaces of the pool, the struts in the tilt pit, the surfaces of l the separation walls, and the structural slabs adjoining the pool walls.

-

L This visual inspection shall verify no changes in the concrete crack patterns, no abnormal degradation or other signs of structural distress (i.e, cracks, bulges, out of plumbness, leakage, discolorations, L efflorescence, etc.).

l l

l l

ARKANSAS - UNIT 2 3/4 7-38 Amendment No. 91

.. . _ . . -

__ . . . _