Public Meeting NRC Slides Dresden End-of-Cycle Plant Performance Assessment
ML051670476
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/13/2005
From:
Division of Nuclear Materials Safety II
To:
References
Download: ML051670476 (20)


Text

Dresden Annual Assessment Meeting Reactor Oversight Program - CY 2004 Nuclear Regulatory Commission - Region III Lisle, Illinois

Agenda

! Introduction

! Review of Reactor Oversight Process

! National Summary of Plant Performance

! Discussion of Plant Performance Results

! Licensee Response and Remarks

! NRC Closing Remarks

! Break

! NRC available to address public questions

NRC Representatives

! Mark A. Satorius, Director, Division Reactor Projects

- (630) 829-9600

! Steven A. Reynolds, Deputy Division Director, DRP

- (630) 829-9601

! Maitri Banerjee, Project Manager, NRR

- (301) 415-2277

! Desiree R. Smith, Senior Resident Inspector

- (815) 942-9267

! Mina R. Sheikh, Resident Inspector

- (815) 942-9267

! Allan Barker, Senior Project Engineer

- (630) 829-9679

! Mark A. Ring, Branch Chief

- (630) 829-9703

Region III Organization James L. Caldwell Regional Administrator Geoffrey E. Grant Deputy Regional Administrator Mark A. Satorius Cynthia D. Pederson Director Division of Reactor Projects Director Division of Reactor Safety Steven A. Reynolds Roy J. Caniano Deputy Director Deputy Director Mark A. Ring Regional Specialists Branch Chief Dresden Project Engineers Resident Inspectors Allan Barker Desiree R. Smith Daneira Meléndez-Colón Mina R. Sheikh Liliana Ramadan

NRC Performance Goals

! Safety:Ensure protection of the public health and safety and the environment

! Security: Enhance the secure use and management of radioactive materials

! Openness: Ensure openness in our regulatory process

! Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely

! Management: Ensure excellence in agency management to carry out the NRCs strategic objectives

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Examples of Baseline Inspections

! Equipment Alignment ~92 hrs/yr

! Triennial Fire Protection ~200 hrs every 3 yrs

! Operator Response ~125 hrs/yr

! Emergency Preparedness ~80 hrs/yr

! Rad Release Controls ~100 hrs every 2 yrs

! Worker Radiation Protection ~100 hrs/yr

! Corrective Action Program ~200 hrs every 2 yrs

! Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to Moderate safety issue Yellow: Substantial safety issue Red: High safety issue

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

Purpose of Todays Meeting

! A public forum for discussion of the licensees performance

! NRC will address the licensee performance issues identified in the annual assessment letter

! Licensee will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

National Summary of Plant Performance Status at End of CY 2004 Licensee Response 78 Regulatory Response 21 Degraded Cornerstone 0 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total Units 102

National Summary

! Performance Indicator Results (at end of CY 2004)

< Green 1834

< White 6

< Yellow 0

< Red 0

! Total Inspection Findings (CY 2004)

< Green 778

< White 11

< Yellow 0

< Red 0

Dresden Assessment Results (Jan 1 - Dec 31, 2004)

! Licensee Response Column of Action Matrix

! Special Inspection on Unit 3 Loss of Offsite Power in May 2004 -resulted in three self-revealed Green Findings

! Supplemental Inspection (95001) for Scrams in October 2004 - no significant findings identified

Safety Significant Findings or PIs

! No greater than Green Findings

! No greater than Green Performance Indicators at the end of the year

< White PI on Unit 3 Safety System Unavailability from 2001 HPCI Waterhammer turned Green in 3Q2004

< White PI on Unit 2 Unplanned Scrams in 2Q2004, completed Supplemental Inspection, PI turned Green in 3Q2004

! Continued Substantive Cross-Cutting Issue in Human Performance

Dresden Inspection Activities (Jan 1 - Dec 31, 2004)

! 27 Green Findings

! Problem Identification & Resolution Inspection -February 2004

! Special Inspection on Unit 3 Loss of Offsite Power -May 2004

! IP 95001 Supplemental Inspection for scrams PI -October 2004

< January 24 - Unit 3 scrammed due to the failure of the master trip solenoid valve

< January 30 - Unit 3 experienced a turbine trip followed by a reactor scram

< April 24 - Unit 2 scrammed due to a Group 1 isolation

< April 28 - Unit 2 manually scrammed due to a trip of the 2 A reactor recirculation pump

< May 5 - Unit 3 scrammed due to a loss of offsite power

Dresden Inspection Activities (continued)

(Jan 1 - Dec 31, 2004)

! License Renewal for Units 2 & 3 - October 2004

! Unit 3 Refueling Outage - October 2004

< Cracking identified on steam dryer and main generator rotor

< Repair of steam dryer and main generator rotor shaft

! Unit 2 main generator and steam dryer inspection -November 2004

< Cracking identified on steam dryer and main generator rotor

< Repair of steam dryer and main generator rotor

Dresden Annual Assessment Summary January 1- December 31, 2004

! Exelon operated Dresden Units 2 & 3 in a manner that preserved public health and safety

! All cornerstone objectives were met with only one White PI identified (Unplanned Scrams per 7000 Critical Hours) which subsequently turned Green

! NRC plans baseline inspections at Dresden for the remainder of the assessment period and IP 71004, Extended Power Uprate (EPU), if Exelon decides to replace the steam dryers

Licensee Response and Remarks Danny Bost Dresden Site Vice President Exelon Generation Company

Contacting the NRC

! Report an emergency

< (301) 816-5100 (call collect)

! Report a safety concern:

< (800) 695-7403

< Allegation@nrc.gov

! General information or questions

< www.nrc.gov

< Select What We Do for Public Affairs

Reference Sources

! Reactor Oversight Process

< http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

! Public Electronic Reading Room

< http://www.nrc.gov/reading-rm.html

! Public Document Room

< 1-800-397-4209 (Toll Free)