Meeting Slides, Dresden Annual Assessment Meeting, Reactor Oversight Program - Cy 2007.ML081220979 |
Person / Time |
---|
Site: |
Dresden |
---|
Issue date: |
04/30/2008 |
---|
From: |
NRC/RGN-III |
---|
To: |
|
---|
References |
---|
Download: ML081220979 (27) |
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24232A2052024-08-12012 August 2024 Presentation Slides for Dresden End-of-Cycle Meeting ML24172A1092024-08-0707 August 2024 Scoping Power Point Presentation ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23173A0472023-06-28028 June 2023 SLRA - NRC Presubmittal Meeting Slides - 6-28-23 ML23173A0462023-06-28028 June 2023 DNPS SLR Pre-submittal Meeting Presentation Rev. 1 ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1322023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1822021-07-13013 July 2021 and Quad Cities Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML20258A0302020-09-22022 September 2020 Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8572020-08-25025 August 2020 Quad 2019 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17156A7972017-06-0505 June 2017 Presentation for 2016 Dresden Nuclear Power Station EOC Open House ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16189A2552016-07-0707 July 2016 Annual Assessment Meeting/Open House (Hand Out) ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15013A1562015-01-14014 January 2015 Meeting Slide Regarding Dresden Nuclear Power Station Pre-Application Meeting for Providing Natural Gas as a Primary Fuel to Station Auxiliary Heating Boilers RS-14-238, Transmittal of Proprietary Meeting Slides2014-08-25025 August 2014 Transmittal of Proprietary Meeting Slides ML14232A7852014-05-19019 May 2014 Fuel Transition License Amendment Request Pre-Submittal Update Meeting ML13149A2062013-05-22022 May 2013 NRC Slides from Public Meeting ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML0919803632009-08-20020 August 2009 Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes ML0914003382009-05-14014 May 2009 Slides Presented at the Dresden Station 2008 EOC Public Meeting ML0812007842008-06-0202 June 2008 Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. ML0812209792008-04-30030 April 2008 Meeting Slides, Dresden Annual Assessment Meeting, Reactor Oversight Program - Cy 2007. ML0714404642007-05-23023 May 2007 End-of-Cycle Meeting - NRC Slides ML0705101392007-02-16016 February 2007 2007 Emergency Preparedness and Incident Response Public Meeting: Status of the EP Threat Based Project, 2/16/07 ML0519303152005-06-30030 June 2005 June 30, 2005, Closed Meeting Handouts ML0434400712004-12-0202 December 2004 December 2, 2004, Meeting with Exelon Re Generator Rotor and Steam Dryer Meeting ML0430002872004-10-19019 October 2004 Presentation from 10/19/2004 Meeting with Exelon Nuclear, Quad Cities Unit 1 Steam Dryer Instrumentation and Refined Acoustic Model ML0427302602004-09-23023 September 2004 Meeting Presentation, Extended Power Uprate (EPU) Vibration Assessment and Vulnerability Review ML0409805242004-03-11011 March 2004 March 11, 2004 - RIC 2004 Presentation - T11 - Christopher Crane - Emergent Technical Topics ML0334403482003-12-0909 December 2003 Meeting Handout to Discuss Licensing Issues and Upcoming Licensing Activities with the Exelon Fleet of Nuclear Plants ML0314102832003-05-21021 May 2003 Meeting Handouts to Discuss Licensing Issues and Upcoming Licensing Activities for the Exelon Fleet of Nuclear Power Plants ML0229602282002-10-15015 October 2002 Meeting Handout for Exelon/Amergen Licensing Meeting with NRC 2024-08-07
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24232A2052024-08-12012 August 2024 Presentation Slides for Dresden End-of-Cycle Meeting ML24172A1092024-08-0707 August 2024 Scoping Power Point Presentation ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23251A0782023-09-0606 September 2023 DRE1 Decom Pre-Submittal Slides ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23173A0462023-06-28028 June 2023 DNPS SLR Pre-submittal Meeting Presentation Rev. 1 ML23173A0472023-06-28028 June 2023 SLRA - NRC Presubmittal Meeting Slides - 6-28-23 ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1322023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML22053A2912022-02-22022 February 2022 NRC Slides for February 25, 2022 Meeting - Acceptance Review of Proposed Alternative to Adopt ASME Code Case N-921 at Dresden and Quad Cities ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1822021-07-13013 July 2021 and Quad Cities Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML20258A0302020-09-22022 September 2020 Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8572020-08-25025 August 2020 Quad 2019 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18207A1882018-07-26026 July 2018 Slides for Dresden 2017 EOC Open House ML18086A8432018-03-27027 March 2018 NUREG-1021, Revision 11 Implementation ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17156A7972017-06-0505 June 2017 Presentation for 2016 Dresden Nuclear Power Station EOC Open House ML16189A2552016-07-0707 July 2016 Annual Assessment Meeting/Open House (Hand Out) ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15135A4252015-05-19019 May 2015 EOC Mtg Slides ML15013A1562015-01-14014 January 2015 Meeting Slide Regarding Dresden Nuclear Power Station Pre-Application Meeting for Providing Natural Gas as a Primary Fuel to Station Auxiliary Heating Boilers RS-14-238, Transmittal of Proprietary Meeting Slides2014-08-25025 August 2014 Transmittal of Proprietary Meeting Slides ML14232A7852014-05-19019 May 2014 Fuel Transition License Amendment Request Pre-Submittal Update Meeting ML13149A2062013-05-22022 May 2013 NRC Slides from Public Meeting ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML11201A2132011-07-20020 July 2011 Summary of Public Meeting to Discuss Exelon'S Plans for Implementing an Electronic Document Control System (Edocs) for Use by NRC Inspectors with U.S. Nuclear Regulatory Commission (NRC) Region III Staff ML1113202162011-05-11011 May 2011 Slides for Dresden Nuclear Power Station End-Of-Cycle Public Open House ML1012000332010-04-28028 April 2010 Annual Assessment Meeting Slides ML0929400522009-10-22022 October 2009 Meeting Power Uprate Meeting Slides ML0914003382009-05-14014 May 2009 Slides Presented at the Dresden Station 2008 EOC Public Meeting ML0812007842008-06-0202 June 2008 Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. ML0812209792008-04-30030 April 2008 Meeting Slides, Dresden Annual Assessment Meeting, Reactor Oversight Program - Cy 2007. ML0811504162008-04-22022 April 2008 Pandemic Planning Utility Interface with NRC Slide Presentation ML0714404642007-05-23023 May 2007 End-of-Cycle Meeting - NRC Slides ML0716601022007-03-20020 March 2007 Slides to Counterparts Meeting with Exelon to Discuss Current and Planned Licensing Activities and Process - Correction ML0705101392007-02-16016 February 2007 2007 Emergency Preparedness and Incident Response Public Meeting: Status of the EP Threat Based Project, 2/16/07 ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0613000812006-04-26026 April 2006 Annual Plant Performance Public Meeting - NRC Presentation Slides 2024-08-07
[Table view] |
Text
Dresden Annual Assessment Meeting Reactor Oversight Program - CY 2007 Dresden Nuclear Power Station Morris, IL April 30, 2008
Purpose of Todays Meeting
- A public forum for discussion of the licensees performance
- NRC will address the licensee performance issues identified in the annual assessment letter
- Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
Agenda
- Review of Reactor Oversight Process
- National Summary of Plant Performance
- Discussion of Plant Performance Results
- Licensee Response and Remarks
- NRC available to address public questions
Region III Organization James Caldwell Regional Administrator Mark Satorius Deputy Regional Administrator Cynthia Pederson Steven West Director Division of Reactor Projects Director Division of Reactor Safety Gary Shear Anne Boland Deputy Director Deputy Director Mark Ring Regional Specialists Branch Chief Dresden Station Project Engineers Resident Inspectors Allan Barker Charles Phillips Daneira Melendez-Colon
NRC Representatives
- (630) 829-9703
- (815) 942-9267
- Daneira Melendez-Colon, Resident Inspector
- (815) 942-9267
Our Mission To license and regulate the nations civilian use of byproduct, source and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
Some Nuclear Facts More than 100 nuclear power plants supply about 20 percent of the electricity in the U.S.
Nuclear materials are used in medicine for cancer treatment and diagnosis.
Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices and irradiators.
The NRC Regulates:
Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs; Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial and academic use; Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities; and Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks.
What we dont do:
Regulate nuclear weapons, military reactors or space vehicle reactors. (These are regulated by other federal agencies.)
Own or operate nuclear power plants.
Regulate some radioactive materials, such as naturally occurring radon and X-rays. (These are regulated by states or other federal agencies.)
How We Regulate Establish rules and regulations Issue licenses Provide oversight through inspection, enforcement and evaluation of operational experience Conduct research to support regulatory decisions Respond to emergencies
Assurance of Plant Safety
- Requiring a defense-in-depth design philosophy
- Requiring long-term maintenance of equipment
- Requiring continual training and qualification of nuclear plant operators.
- Verifying compliance with regulations
What We Do - Nuclear Waste The NRC regulates:
- Spent fuel storage installations for the interim storage of spent nuclear reactor fuel in fuel pools or dry storage casks.
- A high-level radioactive waste repository at Yucca Mountain, Nev., if proposed by the DOE.
What We Do - Nuclear Security NRC requires:
- Well-armed and well-trained security forces;
- Surveillance and perimeter patrols;
- State-of-the-art site access equipment and controls;
- Physical barriers and detection zones; and
- Intrusion detection systems and alarm stations
NRC Performance Goals
- Safety: Ensure adequate protection of public health and safety and the environment.
- Security: Ensure adequate protection in the secure use and management of radioactive materials.
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Examples of Baseline Inspections
- Equipment Alignment ~80 hrs/yr
- Triennial Fire Protection ~250 hrs every 3 yrs
- Operator Response ~125 hrs/yr
- Rad Release Controls ~110 hrs every 2 yrs
- Worker Radiation Protection ~95 hrs/yr
- Corrective Action Program ~250 hrs every 2 yrs
- Corrective Action Case Reviews ~60 hrs/yr
Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue
Action Matrix Concept Licensee Regulatory Degraded Multiple/R ep. Unacceptable Response Response Cornerstone Degraded Perform ance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance Status at End of CY 2007 Licensee Response 87 Regulatory Response 8 Degraded Cornerstone 8 Multiple/Repetitive Degraded Cornerstone 1 Unacceptable 0 Total 104
National Summary
- Performance Indicator Results (at end of CY 2007)
- Green 1942
- White 8
- Yellow 1
- Red 0
- Total Inspection Findings (CY 2007)
- Green 759
- White 9
- Yellow 2
- Red 0
Dresden Assessment Results (Jan 1 - Dec 31, 2007)
- Licensee Response column of Action Matrix
- White PI for Complicated Scrams returned to Green in 3rd QTR 2007
- Findings with Human Performance cross-cutting aspects
Safety Significant Findings or PIs
- No greater than Green findings or PIs
Dresden Inspection Activities (Jan 1 - Dec 31, 2007)
- 100% Baseline Inspection Completion
- Resident Inspectors
- Region-based Inspectors
- 15 Green Findings (baseline inspections)
Dresden Annual Assessment Summary January 1 - December 31, 2007
- Exelon operated the Dresden Station in a manner that preserved public health and safety
- All cornerstone objectives were met with no greater than Green findings or PIs
- Baseline inspections at Dresden for the remainder of the assessment period
Licensee Response and Remarks Dave Wozniak Site Vice President Exelon Nuclear Generating Company
Contacting the NRC
- (301) 816-5100 (call collect)
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
Reference Sources
- Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- Public Document Room 800-397-4209 (Toll Free)