Inspection/Activity Plant - 09/01/05 - 03/31/07
ML052420458
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/30/2005
From:
Division Reactor Projects II
To:
Tennessee Valley Authority
Shared Package
ML052420447 List:
References
Download: ML052420458 (2)


Text

Page 1 of 2 Sequoyah 08/30/2005 12:56:20 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 60855.1 - ISFSI OPERATIONS INSPECTION 1 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 10/03/2005 10/07/2005 Other Routine EB2-TFP - TFP PRE-INSPECTION VISIT 2 1, 2 IP 7111105T Fire Protection [Triennial] 10/03/2005 10/07/2005 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION (TFP) INSP 3 1, 2 IP 7111105T Fire Protection [Triennial] 10/31/2005 11/04/2005 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 11/14/2005 11/18/2005 Baseline Inspections EB3-MR - MR EFFECTIVENESS 2 1, 2 IP 7111112B Maintenance Effectiveness 02/13/2006 02/17/2006 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 04/10/2006 04/14/2006 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/17/2006 04/21/2006 Baseline Inspections PS1-RP - RP PREINSPECTION VISIT/ ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/15/2006 05/17/2006 Baseline Inspections PS1-RP - RP PUBLIC BASELINE 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 06/05/2006 06/09/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/05/2006 06/09/2006 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/05/2006 06/09/2006 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 06/05/2006 06/09/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 06/05/2006 06/09/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23243 SEQUOYAH/EXAM AT POWER FACILITIES 08/28/2006 09/01/2006 Not Applicable PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 08/28/2006 09/01/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/28/2006 09/01/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/28/2006 09/01/2006 Baseline Inspections OL EXAM - INITIAL EXAM 3 1 V23243 SEQUOYAH/EXAM AT POWER FACILITIES 09/18/2006 09/22/2006 Not Applicable OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 10/16/2006 10/20/2006 Baseline Inspections EB1-MODS - MODIFICATIONS/10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 11/13/2006 11/17/2006 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 11/13/2006 11/17/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Sequoyah 08/30/2005 12:56:20 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3-ISI - U2-INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 12/04/2006 12/08/2006 Baseline Inspections EB3TI150 - 2515/150 U-2: RPV & VHP NOZZLES 1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 12/04/2006 12/08/2006 Safety Issues EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 12/11/2006 12/15/2006 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 03/26/2007 03/30/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.