ML052420458
| ML052420458 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 08/30/2005 |
| From: | Division Reactor Projects II |
| To: | Tennessee Valley Authority |
| Shared Package | |
| ML052420447 | List: |
| References | |
| Download: ML052420458 (2) | |
Text
Sequoyah Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2005 12:56:20 Report 22 1
60855.1
- ISFSI OPERATIONS INSPECTION Other Routine 10/03/2005 10/07/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2 2
EB2-TFP
- TFP PRE-INSPECTION VISIT Baseline Inspections 10/03/2005 10/07/2005 Fire Protection [Triennial]
IP 7111105T 1, 2 3
EB2-TFP
- TRIENNIAL FIRE PROTECTION (TFP) INSP Baseline Inspections 10/31/2005 11/04/2005 Fire Protection [Triennial]
IP 7111105T 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Fire Protection [Triennial]
IP 7111105T 1, 2 2
EB3-MR
- MR EFFECTIVENESS Baseline Inspections 02/13/2006 02/17/2006 Maintenance Effectiveness IP 7111112B 1, 2 2
EB3-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 04/10/2006 04/14/2006 Inservice Inspection Activities - PWR IP 7111108P 1
1 EB3SGISI
- U1 STEAM GENERATOR ISI Baseline Inspections 04/17/2006 04/21/2006 Inservice Inspection Activities - PWR IP 7111108P 1
1 PS1-RP
- RP PREINSPECTION VISIT/ ISFSI Baseline Inspections 05/15/2006 05/17/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 4
PS1-RP
- RP PUBLIC BASELINE Baseline Inspections 06/05/2006 06/09/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 06/05/2006 06/09/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 06/05/2006 06/09/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 06/05/2006 06/09/2006 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P IP 7112203 1, 2 Baseline Inspections 06/05/2006 06/09/2006 Performance Indicator Verification IP 71151 1, 2 3
OL PREP
- INITIAL EXAM PREP Not Applicable 08/28/2006 09/01/2006 SEQUOYAH/EXAM AT POWER FACILITIES V23243 1
3 PS2-EP
- EP EXERCISE Baseline Inspections 08/28/2006 09/01/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 08/28/2006 09/01/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 08/28/2006 09/01/2006 Performance Indicator Verification IP 71151 1, 2 3
OL EXAM
- INITIAL EXAM Not Applicable 09/18/2006 09/22/2006 SEQUOYAH/EXAM AT POWER FACILITIES V23243 1
- REQUAL INSPECTION Baseline Inspections 10/16/2006 10/20/2006 Licensed Operator Requalification Program IP 7111111B 1, 2 3
EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 11/13/2006 11/17/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 11/13/2006 11/17/2006 Permanent Plant Modifications IP 7111117B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Sequoyah Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2005 12:56:20 Report 22 1
EB3-ISI
- U2-INSERVICE INSPECTION Baseline Inspections 12/04/2006 12/08/2006 Inservice Inspection Activities - PWR IP 7111108P 2
1 EB3TI150
- 2515/150 U-2: RPV & VHP NOZZLES Safety Issues 12/04/2006 12/08/2006 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA IP 2515/150 2
1 EB3SGISI
- U2 STEAM GENERATOR ISI Baseline Inspections 12/11/2006 12/15/2006 Inservice Inspection Activities - PWR IP 7111108P 2
1 EB3-HS
- HEAT SINK Baseline Inspections 03/26/2007 03/30/2007 Heat Sink Performance IP 7111107B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.