ML19122A482
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/26/2019
From: James Kim
Plant Licensing Branch 1
To: Duke P
Public Service Enterprise Group
References
L-2019-LLA-0074
Download: ML19122A482 (2)


Text

NRR-DMPSPEm Resource From: Kim, James Sent: Friday, April 26, 2019 12:13 PM To: Duke, Paul R.

Subject:

Acceptance Review - Salem 1 and 2, Revise TS to Adopt TSTF-563 (EPID: L-2019-LLA-0074)

Mr. Duke, By letter dated April 8, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML ML19098B529), Public Service Enterprise Group Nuclear, LCC (PSEG, the licensee) submitted a license amendment request (LAR) for Salem Generating Station (Salem) Units 1 and 2. The licensee requests adoption of TSTF-563, "Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program." TSTF-563 revises the Technical Specification (TS) definitions of Channel Calibration and Channel Functional Test. The definition of Channel Calibration currently permits performance by means of any series of sequential, overlapping, or total channel steps. The definition of Channel Functional Test is revised to explicitly permit performance by means of any series of sequential, overlapping, or total channel steps. Both definitions are revised to allow the required frequency for testing the components or devices in each step to be determined in accordance with the TS Surveillance Frequency Control Program.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

The NRC staff has estimated that this licensing request will take approximately 140 hours0.00162 days <br />0.0389 hours <br />2.314815e-4 weeks <br />5.327e-5 months <br /> to complete. The NRC staff expect to complete this review in approximately 12 months, which is April 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any question, please contact me, James Kim, at James.Kim@nrc.gov or 301-415-4125.

James Kim, Project Manager Branch 1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1

Hearing Identifier: NRR_DMPS Email Number: 939 Mail Envelope Properties (BN6PR09MB1332EB271363D0C82B736B3DE43E0)

Subject:

Acceptance Review - Salem 1 and 2, Revise TS to Adopt TSTF-563 (EPID:

L-2019-LLA-0074)

Sent Date: 4/26/2019 12:13:10 PM Received Date: 4/26/2019 12:13:00 PM From: Kim, James Created By: James.Kim@nrc.gov Recipients:

"Duke, Paul R." <Paul.Duke@pseg.com>

Tracking Status: None Post Office: BN6PR09MB1332.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3065 4/26/2019 12:13:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: