D.C. Cook DRS Input to Integrated Report 05-315/2006-003; 50-316/2006-003
ML060830167
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/23/2006
From: Hironori Peterson
Division of Reactor Safety III
To: Christine Lipa
NRC/RGN-III/DRP/RPB6
References
Download: ML060830167 (9)


See also: IR 05000316/2006003

Text

March 23, 2006

MEMORANDUM TO: Christine Lipa, Chief

Projects Branch 6

Division of Reactor Projects

FROM: Hironori Peterson, Chief /RA/

Operations Branch

Division of Reactor Safety

SUBJECT: D. C. COOK NUCLEAR POWER PLANT

DRS INPUT TO INTEGRATED REPORT 50-315/06-03;

50-316/06-03

Attached is the report input for D. C. Cook Nuclear Power Plant, Inspection

Report 50-315/06-03; 50-316/06-03. I have reviewed this input and have determined it is ready

for distribution to the licensee and dissemination to the public.

Post Inspection Data Input to Inspection Report 50-315/06-03; 50-316/06-03

Procedure Status and Sample Size:

IP 71111.11B (Biennial Licensed Operator Requalification Training Program Inspection)

Status = Not Applicable

Sample size = 0 (None: sample size of 1 entered in odd years for biennial inspections)

Attachment: Input to Inspection Report 50-315/316/2006-03

CONTACT: Bruce Palagi, DRS

(630) 829-9611

DOCUMENT NAME:G:\DRS\Work in Progress\DCCook Input Report 50-316-06-03 BBP.wpd

G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME BPalagi: ls PPeterson

DATE 03/23/06 03/23/06

OFFICIAL RECORD COPY

Cover Letter

X No Input, no significant findings.

Title Page

Inspectors: B. Palagi, Senior Operations Engineer (Lead Inspector)

C. Moore, Operations Engineer

SUMMARY OF FINDINGS

ADAMS boilerplate - Inspectable Area: Licensed Operator Requalification Program

A. Inspector-Identified and Self-Revealed Findings

Cornerstone: Mitigating Systems

No findings of significance were identified.

B. Licensee-Identified Violations

No findings of significance were identified.

REPORT DETAILS

1. REACTOR SAFETY

Cornerstone: Mitigating Systems

1R11 Licensed Operator Requalification Program (71111.11)

.1 Facility Operating History

a. Inspection Scope

The inspectors reviewed the plants operating history from January 2004 through

January 2006 to identify operating experience that was expected to be addressed by

the Licensed Operator Requalification Training (LORT) program. Then it was verified

that the identified operating experience had been addressed by the facility licensee in

accordance with the stations approved Systems Approach to Training (SAT) program to

satisfy the requirements of 10 CFR 55.59(c), Requalification program requirements.

b. Findings

No findings of significance were identified.

.2 Licensee Requalification Examinations

a. Inspection Scope

The inspectors performed a biennial inspection of the licensees LORT test/examination

program for compliance with the stations SAT program which would satisfy the

requirements of 10 CFR 55.59(c)(4), Evaluation. The operating examination material

reviewed consisted of four operating tests, each containing two dynamic simulator

scenarios and five job performance measures (JPMs). The written examinations

reviewed consisted of four written examinations, each containing 37 questions. The

inspectors reviewed the annual requalification operating test and biennial written

examination material to evaluate general quality, construction, and difficulty level. The

inspectors assessed the level of examination material duplication from week-to-week

during the current year operating test and written examinations. The inspectors

reviewed the methodology for developing the examinations, including the LORT

program 2-year sample plan, probabilistic risk assessment insights, previously identified

operator performance deficiencies, and plant modifications.

b. Findings

No findings of significance were identified.

.3 Licensee Administration of Requalification Examinations

a. Inspection Scope

The inspectors observed the administration of a requalification operating test to assess

the licensees effectiveness in conducting the test to ensure compliance with

10 CRF 55.59(c)(4), Evaluation. The inspectors evaluated the performance of three

crews in parallel with the facility evaluators during six dynamic simulator scenarios and

evaluated various licensed crew members concurrently with facility evaluators during the

administration of several JPMs. The inspectors assessed the facility evaluators ability to

determine adequate crew and individual performance using objective, measurable

standards. The inspectors observed the training staff personnel administer the operating

test, including conducting pre-examination briefings, evaluations of operator performance,

and individual and crew evaluations upon completion of the operating test. The inspectors

evaluated the ability of the simulator to support the examinations. A specific evaluation of

simulator performance was conducted and documented under Section 1R11.8,

Conformance With Simulator Requirements Specified in 10 CFR 55.46, of this report.

b. Findings

No findings of significance were identified.

.4 Examination Security

a. Inspection Scope

The inspectors observed and reviewed the licensees overall licensed operator

requalification examination security program related to examination physical security

(e.g., access restrictions and simulator considerations) and integrity (e.g., predictability

and bias) to verify compliance with 10 CFR 55.49, Integrity of examinations and tests.

The inspectors also reviewed the facility licensees examination security procedure, any

corrective actions related to past or present examination security problems at the facility,

and the implementation of security and integrity measures (e.g., security agreements,

sampling criteria, bank use, and test item repetition) throughout the examination

process.

b. Findings

No findings of significance were identified.

.5 Licensee Training Feedback System

a. Inspection Scope

The inspectors assessed the methods and effectiveness of the licensees processes

for revising and maintaining its LORT Program up to date, including the use of feedback

from plant events and industry experience information. The inspectors reviewed the

licensees quality assurance oversight activities, including licensee training department

self-assessment reports. The inspectors evaluated the licensees ability to assess the

effectiveness of its LORT program and their ability to implement appropriate corrective

actions. This evaluation was performed to verify compliance with 10 CFR 55.59 (c)

Requalification program requirements and the licensees SAT program.

b. Findings

No findings of significance were identified.

.6 Licensee Remedial Training Program

a. Inspection Scope

The inspectors assessed the adequacy and effectiveness of the remedial training

conducted since the previous biennial requalification examinations and the training from

the current examination cycle to ensure that they addressed weaknesses in licensed

operator or crew performance identified during training and plant operations. The

inspectors reviewed remedial training procedures and individual remedial training plans.

This evaluation was performed in accordance with 10 CFR 55.59 (c) Requalification

program requirements and with respect to the licensees SAT program.

b. Findings

No findings of significance were identified.

.7 Conformance With Operator License Conditions

a. Inspection Scope

The inspectors reviewed the facility and individual operator licensees' conformance

with the requirements of 10 CFR Part 55. The inspectors reviewed the facility licensee's

program for maintaining active operator licenses and to assess compliance with

10 CFR 55.53 (e) and (f). The inspectors reviewed the procedural guidance and the

process for tracking on-shift hours for licensed operators and which control room

positions were granted watch-standing credit for maintaining active operator licenses.

The inspectors reviewed the facility licensee's LORT program to assess compliance with

the requalification program requirements as described by 10 CFR 55.59 (c). Additionally,

medical records for 14 licensed operators were reviewed for compliance with

10 CFR 55.53 (i).

b. Findings

No findings of significance were identified.

.8 Conformance With Simulator Requirements Specified in 10 CFR 55.46

a. Inspection Scope

The inspectors assessed the adequacy of the licensees simulation facility (simulator) for

use in operator licensing examinations and for satisfying experience requirements as

prescribed in 10 CFR 55.46, Simulation Facilities. The inspectors also reviewed a

sample of simulator performance test records (i.e., transient tests, scenario test and

discrepancy resolution validation test), simulator discrepancy and modification records,

and the process for ensuring continued assurance of simulator fidelity in accordance with

10 CFR 55.46. The inspectors reviewed and evaluated the discrepancy process to

ensure that simulator fidelity was maintained. Open simulator discrepancies were

reviewed for importance relative to the impact on 10 CFR 55.45 and 55.59 operator

actions as well as on nuclear and thermal hydraulic operating characteristics. The

inspectors conducted interviews with members of the licensees simulator staff about the

configuration control process and completed the IP 71111.11, Appendix C, checklist to

evaluate whether or not the licensees plant-referenced simulator was operating

adequately as required by 10 CFR 55.46 (c) and (d).

b. Findings

No findings of significance were identified.

9 Annual Operating Test Results

a. Inspection Scope

The inspectors reviewed the pass/fail results of individual written tests, and the operating

and simulator tests (required to be given per 10 CFR 55.59(a)(2)) administered by the

licensee during calender year 2006. The overall written examination and operating test

results were compared with the significance determination process in accordance with

NRC Manual Chapter 0609, Appendix I, Operator Requalification Human Performance

Significance Determination Process.

b. Findings

No findings of significance were identified.

4. OTHER ACTIVITIES

4OA5 Other Activities

(Closed) Violations 05000315/316/200506-01, 02, and 03 Failure to Accurately Report

Completion of Corrective Actions from a Previous Severity Level III Violation, Failure to

Provide Complete and Accurate Information about Operators Health Status, and

Failure to Report a Change in Operator Medical Status

Corrective actions associated with NRC issued Notice of Violation (NOV) EA-05-171

were reviewed. On November 23, 2005, the NRC issued a Notice of Violation EA-05-171

and proposed a Civil Penalty of $60,000 to the Indiana Michigan Power Company

associated with two violations of 10 CFR 50.9, "Completeness and Accuracy of

Information," and one violation of 10 CFR 50.74, Notification of Change in Operator or

Senior Operator Status. The violations were identified during an NRC inspection (NRC

Inspection Report No. 05000315/2005006) conducted at D.C. Cook in the spring and

summer of 2005 to review the plants reactor operator licensing program. NRC

inspectors identified three violations: (1) the utility had provided the NRC with incomplete

and inaccurate information. The utility stated that a complete review of all operator

medical records had been conducted and that no records that would require restrictions

to operator licenses for medical reasons had been found. However, NRC inspectors

identified three licensed operators who had medical conditions that would require their

licenses to be restricted; (2) the utility had failed to notify the NRC about licensed

operators experiencing a permanent illness within 30 days. Two NRC-licensed operators

at the plant were diagnosed with potentially disqualifying medical conditions in 1998 and

2003. However, the NRC was not notified of these facts until 2005; and (3) the utility

also failed to provide the NRC with complete and accurate information on NRC reactor

license applications. Applications submitted to the NRC for new, renewed and amended

NRC licenses did not describe the individuals recently diagnosed medical conditions that

would affect the conditions of these licenses. The licensee has implemented corrective

actions and the NRC evaluated the effectiveness of those corrective actions during this

inspection. The corrective action were evaluated as having been effective based on a

review of current operator training material, medical records, and reporting practices.

Therefore, violations VIO 05000315/316/2005006-01 (Failure of the licensee to

accurately report the completion of corrective actions from a previous SLIII violation in

2004.); VIO 05000315/316/2005006-02 (Failure to provide accurate and complete

information about operators health prior to the NRC performing a licensing action.); and

VIO 05000315/316/2005006-03 (Failure of the licensee to report the change in operator

medical status.) will be closed.

4OA6 Meeting(s)

.1 Interim Exit Meetings

Interim exit meetings were conducted for:

Biennial Operator Requalification Program Inspection with Mr. J. Jensen, Site Vice

President, on March 10, 2006.

Annual Operator Requalification Examination Results Inspection with Mr. T. Vriezema,

Operations Requalification Training Supervisor, on March 20, 2006.

KEY POINTS OF CONTACT

Licensee

L. Bush, Operations Supervisor

R. Gillespie, Operations Training Manager

T. Veirzema, Operations Requalification Training Supervisor

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Closed

05000315/200506-01 VIO Failure to Accurately Report Completion of Corrective

05000316/200506-01 Actions from a Previous Severity Level III Violation

05000315/200506-02 VIO Failure to Provide Complete and Accurate Information

05000316/200506-02 about Operators Health Status

05000315/200506-03 VIO Failure to Report a Change in Operator Medical Status

05000316/200506-03

LIST OF DOCUMENTS REVIEWED

Condition Reports associated with Notice of Violation EA-05-171, CR #s 05109063, 05111059,

05112045,051122049, 05216067,05223020, 05224028, 05322029, 0534276

Lesson Plan RQ-C-3040, LOR Period 3004 Ops Review

TI-TROP-02 Rev. 8, Administrative Requirements for NRC License and Medical Requirements

OHI-2071 Rev. 9, Reporting Reassignment, Yermination, and Conditions Potentially Affecting

Performance of Licensed Duties

TPD-600-LOR Rev. 11, LICENSED OPERATOR REQUALIFICATION TRAINING PROGRAM

DESCRIPTION

LIST OF ACRONYMS USED

CFR Code of Federal Regulations

DRS Division of Reactor Safety

IP Inspection Procedure

JPM Job Performance Measure

LORT Licensed Operator Requalification Training

SAT Systems Approach to Training