|
---|
Category:Letter
MONTHYEARIR 05000302/20240012024-09-23023 September 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, NRC Inspection Report No. 05000302/2024001 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24242A2612024-08-29029 August 2024 Operator Licensing Examination Approval 05000261/2024301 ML24226B2392024-08-27027 August 2024 Application for License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Acknowledgement of Withdrawal IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 ML24179A0702024-07-26026 July 2024 SHPO S106 Completion Crystal River Unit 3 ML24179A0912024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Tribe of Florida ML24205A2182024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Nation of Oklahoma ML24205A2192024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Muscogee Nation ML24205A2202024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3_Miccosukee Tribe of Florida ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24190A1912024-07-0808 July 2024 Fws Concurrence for Crystal River Unit 3 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24172A2552024-06-20020 June 2024 Fws to NRC Species List: Florida Ecological Services Field Office 06/20/2024 ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 ML24114A2262024-04-24024 April 2024 Amended Special Package Authorization for the Cr3 Middle Package (Crystal River 3 Middle Package - Docket No. 71-9393) IR 05000302/20230022024-04-17017 April 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2023002 ML24100A0912024-04-10010 April 2024 Operator License Examination Report IR 05000324/20243012024-04-0303 April 2024 NRC Operator License Examination Report 05000325/2024301 and 05000324/2024301 ML24079A2492024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Johnson, Lewis Johnson 2024-09-04
[Table view] |
Text
Prgros En10 CFR 140.21(e)
&'2! Progress Energy PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Serial: PE&RAS-06-023 April 20, 2006 Director, Office of Nuclear Reactor Regulation United states Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / LICENSE NO. DPR-23 EVIDENCE OF GUARANTEE OF PAYMENT OF DEFERRED PREMIUMS Ladies and Gentlemen:
Pursuant to 10 CFR 140.21(e), enclosed are 2005 actual and 2006 projected cash flow statements as evidence of guarantee of payment of deferred premiums for the above listed plants belonging to Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC),
and Florida Power Corporation, now doing business as Progress Energy Florida, Inc. (PEF). provides evidence of guarantee of payment of deferred premiums for the principal owner-licensee and other owners-licensees of Brunswick Units 1 and 2, Harris Unit 1, and Robinson Unit 2. provides evidence of guarantee of payment of deferred premiums for the principal owner-licensee and other owners-licensees of Crystal River Unit 3.
This document contains no new regulatory commitment.
If you have additional questions, please call me at (919) 546-6901.
Sincerely, Chris Burton Manager - Performance Evaluation & Regulatory Affairs DMF Enclosures (2)
United States Nuclear Regulatory Commission PE&RAS-06-023 Page 2 c: W. D. Travers, Regional Administrator - Region II USNRC Resident Inspector - BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector - CR3 1JSNRC Resident Inspector - SHNPP, Unit No. 1 1JSNRC Resident Inspector - HBRSEP, Unit No. 2
]3. L. Mozafari, NRR Project Manager - BSEP, Unit Nos. 1 and 2; CR3 C. P. Patel, NRR Project Manager - SHNPP, Unit No. 1; HBRSEP, Unit No. 2
.f. A. Sanford - North Carolina Utilities Commission R. Vance - North Carolina Utilities Commission S. Watson - North Carolina Utilities Commission
- 13. 0. Hall - North Carolina Department of Environment and Natural Resources
United States Nuclear Regulatory Commission Enclosure 1 PE&RAS-06-023 Page 1 Carolina Power & Light 2006 Internal Cash Flow Projection for H.B. Robinson, Unit 2; Brunswick Units 1 and 2; Shearon Harris, Unit 1 (Dollars in Millions)
Year Ended Year Ended December 31, 2005 December 31, 2006 Actual Projected Net Income After Taxes $ 493 $ 484 Less Dividend Paid (457) (339)
Retained Earnings 36 145 Adjustments:
Depreciation, Amortization & Impairment 644 575 Deferred Income Taxes and Investment Tax Credits (149) (25)
AFUDC (7) (5)
Total Adjustments 487 546 Internal Cash Flow $ 524 $ 691 Average Quarterly Cash Flow $ 131 $ 173 Percentage Ownership in Robinson, Brunswick 1 & 2 and Harris plants 100%
- Maximum Total Contingent Liability $ 60
- Carolina Power & Light is the principal licensee as owner of 100%, 83.83% and 81.67% of the Robinson, Harris and Brunswick nuclear units, respectively.
This certified cash flow statement is made as of March 15, 2006, and covers all of the owners of this unit.
I do certify the above to be correct and accurate.
Thomas R. Sullivan Treasurer Prepared by: R. H. Kramer S:\CashMgml\Compliance\[01-041 NRCCash Flow Projectidn_2006.xis]PEC06
United States Nuclear Regulatory Commission Enclosure 2 PE&RAS-06-023 Page 1 Florida Power Corporation 2006 Internal Cash Flow Projection for Crystal River Unit 3 (Dollars in Millions)
Year Ended Year Ended December 31, 2005 December 31, 2006 Actual Projected Net Income After Taxes $ 260 $ 313 Less Dividend Paid 0 (235)
Retained Earnings 260 78 Adjustmen:s:
Depreciation and Amortization 367 424 Deferred Income Taxes and Investment Tax Credits (50) (51)
AFUDC (22) (25)
Total Adjustments 295 348 Internal Cash Flow $ 555 $ 426 Average Quarterly Cash Flow $ 139 $ 107 Percentage Ownership in Crystal River Unit No. 3 100%
- Maximum Total Contingent Liability $ 15
- Florida Power Corporation is the principal licensee as owner of 91.8% of the unit.
This certified cash flow statement is made as of March 15, 2006, and covers all of the owners of this unit.
I do certify the above to be correct and accurate.
Thomas R. Sullivan Treasurer ;;A Prepared by: R. H. Kramer S:ACashMgmt'.Compliance\[01-041 NRCCash Flow Projection_2006.xIs]PEF06