|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:License-Operator
MONTHYEARIR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23097A0162023-04-0707 April 2023 Notification of NRC Initial Operator Licensing Examination 05000482/2023301 ML22020A1332021-12-0707 December 2021 11 Public Forms WO 20-0020, Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20015A5192019-12-14014 December 2019 11-WC-2019-12 Public Forms ML20007E4422019-12-14014 December 2019 10-WC-2019-12 Post-Exam Comments ML19326A7722019-11-22022 November 2019 NRC Initial Operator Licensing Examination Approval 05000482/2019301 ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17355A6512017-12-0404 December 2017 11 Post-Examination Comments ML17355A6452017-11-15015 November 2017 11 Draft Written Exam Comments ML18012A7472017-11-15015 November 2017 11 Public Forms ML17355A6412017-11-15015 November 2017 11 Draft Operating Test ML17355A6432017-11-15015 November 2017 11 Draft Outline Comments ML17355A6442017-11-15015 November 2017 11 Draft Outlines ML17355A6402017-11-15015 November 2017 11 Draft Operating Test Comments ML17355A6462017-11-15015 November 2017 11 Draft Written Exam ML17355A6482017-11-15015 November 2017 11 Final Operating Test ML17355A6492017-11-15015 November 2017 11 Final Outlines ML17355A6502017-11-15015 November 2017 11 Final Written Exam ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16336A7892016-12-0101 December 2016 Operating Company - Notification of NRC Initial Operator Licensing Examination 05000482/2017301 WO 16-0039, Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-092016-07-19019 July 2016 Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-09 ML16182A2852016-06-30030 June 2016 Arkansas, Units 1 and 2,South Texas Project, Units 1 and 2, Wolf Creek, Generic Fundamentals Examination Results for June 8, 2016 ML16027A3002015-12-29029 December 2015 2015-11-POST Exam Analysis ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16036A3882015-11-13013 November 2015 2015-11-PUBLIC Forms ML16036A3872015-11-13013 November 2015 2015-11-PROPOSED Written Exam Comments ML16036A3862015-11-13013 November 2015 2015-11-PROPOSED Outlines ML16036A3852015-11-13013 November 2015 2015-11 - Proposed Operating Test ML16036A3842015-11-13013 November 2015 2015-11-PROPOSED Operating Test Comments ML16036A3832015-11-13013 November 2015 2015-11-Final Outlines ML16036A3822015-11-13013 November 2015 2015-11-PROPOSED Outline Comments ML16036A3812015-11-13013 November 2015 2015-11-Proposed Written Exam ML16027A3192015-11-13013 November 2015 WC-2015-11 - Final Written Exams ML16027A3122015-11-13013 November 2015 2015-11 - Final Operating Test ML15317A1672015-11-12012 November 2015 2015-11-Examination Approval ML15181A2152015-06-30030 June 2015 Notification of NRC Initial Operator Licensing Examination 05000482/2015301 ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 ML13248A5962013-07-26026 July 2013 WC-2013-07 Draft Operating Test ML13252A0302013-07-26026 July 2013 WC-2013-07 Public Forms ML13252A0292013-07-26026 July 2013 WC-2013-07 Draft Written Examination Comments ML13248A6002013-07-26026 July 2013 WC-2013-07 Draft Operating Test Comments ML13248A5982013-07-26026 July 2013 Wc 2013-07 Draft Outline Comments ML13248A5932013-07-26026 July 2013 WC-2013-07 Draft Outlines.Pdf ML13248A5942013-07-26026 July 2013 WC-2013-07 Final Outlines 2023-04-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000482/20233012023-12-19019 December 2023 NRC Examination Report 05000482/2023301 ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23097A0162023-04-0707 April 2023 Notification of NRC Initial Operator Licensing Examination 05000482/2023301 ML22020A1332021-12-0707 December 2021 11 Public Forms WO 20-0020, Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20007E4422019-12-14014 December 2019 10-WC-2019-12 Post-Exam Comments ML20015A5192019-12-14014 December 2019 11-WC-2019-12 Public Forms ML19326A7722019-11-22022 November 2019 NRC Initial Operator Licensing Examination Approval 05000482/2019301 WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17355A6512017-12-0404 December 2017 11 Post-Examination Comments ML17355A6482017-11-15015 November 2017 11 Final Operating Test ML17355A6412017-11-15015 November 2017 11 Draft Operating Test ML17355A6402017-11-15015 November 2017 11 Draft Operating Test Comments ML17355A6432017-11-15015 November 2017 11 Draft Outline Comments ML17355A6502017-11-15015 November 2017 11 Final Written Exam ML17355A6462017-11-15015 November 2017 11 Draft Written Exam ML17355A6442017-11-15015 November 2017 11 Draft Outlines ML17355A6452017-11-15015 November 2017 11 Draft Written Exam Comments ML17355A6492017-11-15015 November 2017 11 Final Outlines ML18012A7472017-11-15015 November 2017 11 Public Forms ML16336A7892016-12-0101 December 2016 Operating Company - Notification of NRC Initial Operator Licensing Examination 05000482/2017301 WO 16-0039, Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-092016-07-19019 July 2016 Form 536 Operator Licensing Examination and Scheduling Data in Response to RIS 2106-09 ML16182A2852016-06-30030 June 2016 Arkansas, Units 1 and 2,South Texas Project, Units 1 and 2, Wolf Creek, Generic Fundamentals Examination Results for June 8, 2016 ML16027A3002015-12-29029 December 2015 2015-11-POST Exam Analysis ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16036A3832015-11-13013 November 2015 2015-11-Final Outlines ML16027A3122015-11-13013 November 2015 2015-11 - Final Operating Test ML16027A3192015-11-13013 November 2015 WC-2015-11 - Final Written Exams ML16036A3812015-11-13013 November 2015 2015-11-Proposed Written Exam ML16036A3822015-11-13013 November 2015 2015-11-PROPOSED Outline Comments ML16036A3842015-11-13013 November 2015 2015-11-PROPOSED Operating Test Comments ML16036A3852015-11-13013 November 2015 2015-11 - Proposed Operating Test ML16036A3862015-11-13013 November 2015 2015-11-PROPOSED Outlines ML16036A3872015-11-13013 November 2015 2015-11-PROPOSED Written Exam Comments ML16036A3882015-11-13013 November 2015 2015-11-PUBLIC Forms ML15317A1672015-11-12012 November 2015 2015-11-Examination Approval ML15181A2152015-06-30030 June 2015 Notification of NRC Initial Operator Licensing Examination 05000482/2015301 ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 ML13248A5982013-07-26026 July 2013 Wc 2013-07 Draft Outline Comments ML13252A0302013-07-26026 July 2013 WC-2013-07 Public Forms ML13252A0292013-07-26026 July 2013 WC-2013-07 Draft Written Examination Comments ML13248A6002013-07-26026 July 2013 WC-2013-07 Draft Operating Test Comments ML13248A5932013-07-26026 July 2013 WC-2013-07 Draft Outlines.Pdf ML13248A5942013-07-26026 July 2013 WC-2013-07 Final Outlines ML13248A5962013-07-26026 July 2013 WC-2013-07 Draft Operating Test ML13198A0112013-07-17017 July 2013 Operating Company - NRC Initial Operator Licensing Examination Approval ML1204704362012-01-18018 January 2012 WC-2012-01-Final OP Test ML1204704452012-01-18018 January 2012 2012-01-Final Outlines 2023-04-07
[Table view] |
Text
June 6, 2007 Rick A. Muench, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
SUBJECT:
WOLF CREEK NUCLEAR OPERATING CORPORATION NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000482/2007301
Dear Mr. Muench:
In a telephone conversation on May 2, 2007, between T. O. McKernon, Chief Examiner,and R. Murray, Supervisor, Initial License Operator Training, arrangements were made for the administration of licensing examinations at your facility during the weeks of October 22 and 29, 2007.
As agreed, during the telephone conversation, the facility staff will prepare the examinations based on the guidelines in Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors". The NRC regional office will review and discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by June 26, 2007. The written examinations, operating tests, and supporting reference materials identified in Attachment 2 to ES-201 will be due by August 28, 2007.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. Additionally, an onsite validation of the examination material will be performed during the week of October 8, 2007. Sufficient staff resources and simulator should be made available for the examination validation.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Wolf Creek Nuclear Operating Corporation Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date, September 25, 2007. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date, or no later than October 10, 2007.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. D. Burns has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. Tom McKernon at 817-860-8153, or myself at 817-860-8159.
Sincerely,
/RA/
Anthony T. Gody, Chief Operations Branch Division of Reactor Safety
Wolf Creek Nuclear Operating Corporation Docket No. 50-482 License: NPF-42 cc:
Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corp.
P.O. Box 411 Burlington, KS 66839 Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037 Supervisor Licensing Wolf Creek Nuclear Operating Corp.
P.O. Box 411 Burlington, KS 66839 Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027 Office of the Governor State of Kansas Topeka, KS 66612 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839-1798 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366
Wolf Creek Nuclear Operating Corporation Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (SDC)
SRI, Callaway (MSP)
Branch Chief, DRP/B (VGG)
Senior Project Engineer, DRP/B (FLB2)
Team Leader, DRP/TSS (CJP)
RITS Coordinator (MSH3)
SUNSI Review Completed: _xxx_ ADAMS: / Yes G No Initials: _TOM_____
/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive OB:SOE OB:C TOMcKernon ATGody
/RA/ /RA/
6/1/07 6/6/07 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax