2008 Regulatory Commitment Change Summary Report
ML090980347
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/08/2009
From: Enright D
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
1.10.0101, BYRON 2009-0041
Download: ML090980347 (3)


Text

Exel nSM Exelon Generation Company. LLC Byron Station www.exeloncorp.com Nuclear 4450 North German Church Road Byron. 1L 61010*9794 April 8, 2009 LTR; BYRON 2009-0041 File: 1.10.0101 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555-0001 Byron Station, Unions 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

2008 Regulatory Commitment Change Summary Report Enclosed please find the "Regulatory Commitment Change Summary Report" for Byron Station.

This report contains summary information from January 1, 2008, through December 31, 2008.

Revisions to docketed regulatory commitments were processed using the current revision of Nuclear Energy Institutes' document NEI 99-04 "Guidelines for Managing Nuclear Regulatory Commission (NRC) Commitment Changes."

If you have any questions concerning this report, please contact D. Gudger, Regulatory Assurance Manager at (815) 406-2800.

Daniel J. Enrig Site Vice President Byron Station DJE fTLH/ cy Enclosure

ATTACHMENT BYRON STATION REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT FOR 2008 Original Document:

Commitment ARs 10323 - 10336, 10338 - NRC Notice of Violation October 11, 1988 Subject of Delei:ion's AR 10313 - 0 BVS.5-1.W01 AR 10323 - 1/2 BVS.5-3.CC.1-1 AR 10324 -1/2 BVS.5-3.CC.1-2 AR 10325 - 1/2 BVS.5-2.F.3-1 AR 10326 - 1/2 BVS.5-2.F.3-2 AR 10327 - 1/2 BVS.5-2.F.2-1 AR 10328 - 1/2 BVS.5-2.F.2-2 AR 10329 - 1/2 BVS.6.2.1.B-1 AR 10330 - 1/2 BVS.6.2.1.B-2 AR 10331 -1/2 BVS.1.2.3.1-1 AR 10332 -1/2 BVS.1.2.3.1-1 AR 10333 - 1/2 BVS.1.2.3.1-2 AR 10334 - 0 BVS.5.3.SX.1-2 AR 10335 - 0 BVS.5.3.SX.1-1 AR 10336 - 1/2 BVS.5.3.SX.1-1 AR 10338 - 1/2 BVS.5.3.SX.1-2 These procedures have been revised to add steps to assure the repeatability of the position of vibration measurements on those pumps included in the current 1ST program. This is to assure compliance with section XI of the ASME code, subsection IWP-4160.

This has been standard practice for 20+ years and has also been incorporated into the fleetwide 1ST Program.

Status:

These commitments were deleted under Commitment Change Numbers08-013 through 08-027.

ATTACHMENT BYRON STATION REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT FOR 2008 Original Document:

Commitment AR 577295-07 & 10 - May 16, 2007 B.5.b Fleetwide Response to NRC Subject of Change::

"Attachment 1b, Table A.6-1: 10#32 External spray of the containment building. High confidence release reduction strategy. 10 #23 vent containment via the emergency access hatch.

Attachment 1b, Table A.2-4: 10 #5 SFP makeup from Aux Bldg and FHB hose stations.

This strategy may provide 1250 gpm through five 2.5 fire hoses."

Table A.6 It was erroneously indicated in the May 16, 2007 B.5.b Fleetwide Response that a modification was going to be installed; when it was not. IR 806752 was written after the identifying NRC inspector indicated he did not want a separate letter issued to correct this and to utilize this Annual NRC Commitment Change / Deletion Notification Process.

Table A.2-4 will correct wording from 'hoses' to 'hydrants'.

Status:

The commitment was being changed under Commitment Change Number 08-031.