Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000275-09-0008 and 0500323-09-008) Request for Information
ML091050600
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/15/2009
From: O'Keefe N
NRC/RGN-IV/DRS/EB-2
To: Conway J
Pacific Gas & Electric Co
References
IR-09-008
Download: ML091050600 (7)


See also: IR 05000002/1975009

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

April 15, 2009

John T. Conway

Senior Vice President &

Chief Nuclear Officer

Pacific Gas and Electric Company

P. O. Box 3

Mail Code 104/6/601

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL

FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT 05000275/2009008 and 05000323/2009008) REQUEST FOR

INFORMATION

Dear Mr. Conway:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at your Diablo Canyon

facility in July 2009. The inspection team will be comprised of reactor inspectors from the NRC

Region IV office. The team will conduct the inspection in accordance with the baseline

Inspection Procedure 71111.05TTP, "Fire Protection-NFPA 805 Transition Period (Triennial)."

The schedule for the inspection is as follows:

  • Information gathering visit: June 10 - 11, 2009
  • Onsite inspection: July 06 - 10, 2009

July 20 - 24, 2009

Three individuals will participate in the information gathering visit, to select the fire areas for

evaluation, identify additional documents needed to support the inspection, obtain unescorted

access, meet with the key personnel who will support the inspection, and become familiar with

your fire protection program. The enclosure to this letter provides an initial list of the documents

the team will want to review. We request that your staff transmit copies of the documents listed

in the enclosure to the NRC Region IV office for team use in preparation for the inspection.

Please send this information so that it will arrive in our office in Arlington, Texas, by the dates

listed in the enclosure.

We request that during the onsite inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest are those documents that establish that your fire

protection program satisfies the NRC regulatory requirements and conforms to applicable NRC

and industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) plant

systems required to achieve and maintain safe shutdown conditions from inside and outside the

control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant

Pacific Gas and Electric -2-

fire protection systems, and (4) the fire protection program and its implementation should be

available to support the team at the site during the inspection.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection team's information or logistical needs, please

contact the lead inspector, John Mateychick, at 817-276-6560.

Sincerely,

/RA/

Neil OKeefe, Chief

Engineering Branch 2

Division of Reactor Safety

Dockets: 50-275; 50-323

Licenses: DPR-80; DPR-82

Enclosure: Triennial Fire Protection

Inspection Supporting Documentation

DISTRIBUTION:

Sierra Club San Lucia Chapter

ATTN: Andrew Christie

P. O. Box 15755

San Luis Obispo, CA 93406

Nancy Culver

San Luis Obispo

Mothers for Peace

P. O. Box 164

Pismo Beach, CA 93448

Chairman

San Luis Obispo County

Board of Supervisors

1055 Monterey Street, Suite D430

San Luis Obispo, CA 93408

Truman Burns\Robert Kinosian

California Public Utilities Commission

505 Van Ness Ave., Rm. 4102

San Francisco, CA 94102

Pacific Gas and Electric -3-

Diablo Canyon Independent Safety Committee

Attn: Robert R. Wellington, Esq.

Legal Counsel

857 Cass Street, Suite D

Monterey, CA 93940

Director, Radiological Health Branch

State Department of Health Services

P. O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

City Editor

The Tribune

3825 South Higuera Street

P. O. Box 112

San Luis Obispo, CA 93406-0112

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 31)

Sacramento, CA 95814

James R. Becker, Site Vice President &

Station Director

Diablo Canyon Power Plant

P. O. Box 56

Avila Beach, CA 93424

Jennifer Tang

Field Representative

United States Senator Barbara Boxer

1700 Montgomery Street, Suite 240

San Francisco, CA 94111

Chief, Radiological Emergency Preparedness Section

FEMA Region 9

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Pacific Gas and Electric -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Michael.Peck@nrc.gov)

Resident Inspector (Tony.Brown@nrc.gov)

Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

DC Site Secretary (Agnes.Chan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

File located: R:REACTORS\DC 2009008 RFI-TFP ML091050600

SUNSI Rev Compl. X Yes No ADAMS X Yes No Reviewer Initials JMM

Publicly Avail X Yes No Sensitive Yes X No Sens. Type Initials JMM

EB2 C: EB 2

J. Mateychick N.OKeefe

/RA/ /RA/

04/13 /09 04/15/09

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

ENCLOSURE

Triennial Fire Protection Inspection Documentation Requested

Please provide the following documentation items 1 - 4 prior to the onsite information-gathering

visit, preferably no later than June 1, 2009. Where practical, please provide copies

electronically.

1. The current version of your fire protection program and fire hazards analysis.

2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate

acceptable plant response.

3. Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,

pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters

to/from the NRC regarding fire protection/fire safe shutdown, etc.).

4. The Fire Probabilistic Risk Assessment or portions of the plants Individual Plant

Examination for External Events report addressing fire events.

Please provide the following documentation items 5 - 37 during the information-gathering visit or

by June 29, 2009, in order to support inspection preparation. Whenever practical, please

provide copies electronically. However, drawings should be provided as paper copies of

sufficient size that all details are legible.

5. Plant layout and equipment drawings for the selected fire areas (these areas will be

selected during the information gathering trip) that identify: (a) the physical plant

locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or

fire zone delineation; and (c) the locations of fire protection equipment, such as

detection, suppression, and post-fire emergency lighting units; and (d) fire area

boundaries.

6. Fire protection program implementing procedures (e.g., administrative controls, operator

response procedures for fires, fire fighting procedures, etc.).

7. Operating procedures used for achieving and maintaining hot and cold shutdown

conditions from the control room in the event of a fire outside the control room (III.G.2

areas).

8. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)

capability with or without control room evacuation.

9. Pre-fire plans for the selected fire areas (areas to be selected by the team during the

information-gathering trip).

10. A list of equipment used to achieve and maintain hot standby and cold shutdowns in the

event of a fire (safe shutdown equipment lists).

-1- Enclosure

11. Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for normal and alternate shutdown. Please

provide one copy of the piping and instrumentation (flow) diagrams for these systems of

a size sufficient to read all details. These should include the systems used for RCS

makeup, RCS pressure control, decay heat removal, and reactivity control, including the

essential support systems.

12. A listing of design change packages which were determined to impact fire protection and

post-fire safe shutdowns, performed in the last 3 years.

13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.

14. A listing of open and closed corrective action documents initiated in the last 3 years,

which relate to the fire protection program or equipment. Include corrective action

document number, date, and subject.

15. A listing of the applicable codes and standards (with the versions) related to the design

of plant fire protection features and evaluations of any code deviations.

16. Drawings of the portions of the emergency lighting system which support fire response

and post-fire safe shutdown.

17. Procedures used to remove smoke from safety-related areas and the engineering

studies or calculations which support the design basis.

18. Drawings of communication systems credited in the license basis for firefighting and

plant operations during fires where control room is occupied and/or evacuated.

19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

20. A listing of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems.

21. Maintenance Rule performance criteria and a summary of the last 3 years performance

history for fire protection program systems or functions monitored within the

Maintenance Rule program.

22. A copy of fire protection program requirements (e.g. limiting conditions for operation,

surveillance test requirements) covered by Technical Specifications, Technical

Requirements Manual, Updated Final Safety Analysis Report, or similar documents.

23. Copies of internal and external self-assessments, audits, peer-assessments or similar

reviews related to post-fire safe shutdown capability or the fire protection program

completed since January 1, 2006.

24. A list of manual actions taken outside the control room which are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone and indicate the location where the action

must take place.

-2- Enclosure

25. Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design

basis documents that describe the purpose/function/operating characteristics of the safe

shutdown systems (reactor coolant system (RCS) makeup, RCS pressure control, decay

heat removal, and reactivity control, including the essential support systems).

26. Two copies of one-line diagrams of the electrical distribution system. These should

depict how power gets from the switchyard to the engineered safety feature loads (480V

and 4160V). Also, include the vital DC distribution system one-line diagrams.

27. A list of automatic and manually initiated gaseous fire suppression systems in the plant,

giving location and the key equipment being protected.

28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or

maintain hot shutdown and b) reach and/or maintain cold shutdown.

29. A list of high to low pressure interface valves.

30. A copy of procedures governing the training and operation of the fire brigade.

31. Organization charts of site personnel down to the level of fire protection staff personnel.

32. A contact list of key site personnel who will be supporting this inspection, giving location

of their office and phone number onsite.

33. The team would like to observe an unannounced fire brigade drill in the plant, if possible,

during the week of July 20, 2009. Please put us in contact with the appropriate

personnel for planning drills during the onsite information gathering trip.

34. The team would like to perform a walkthrough of the procedure for control room

evacuation due to fire with qualified operators in the plant during the week of

July 6, 2009. Please put us in contact with the appropriate personnel for planning the

walkthrough during the onsite information gathering trip.

35. Corrective action documents listing fire protection program deficiencies,

non-compliances and past violations to be resolved during the transition to NFPA 805.

36. A list of compensatory measures in place for the fire protection program identifying those

that are in place due to issues to be addressed by the transition to NFPA 805.

37. Drawings showing the installed location details for fire suppression and detection

systems for the selected fire areas (areas to be selected by the team during the

information-gathering trip).

-3- Enclosure