ME4068 & ME4069, Draft RAI from Cptb RR-02, Revision 1 for MSRV Test Frequency in the Third 10-Year IST Plan
ML102420605
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/30/2010
From: Bhalchandra Vaidya
Plant Licensing Branch 1
To: Coddington C, Crowthers M, Rochester M
Susquehanna
vaidya B, NRR/Dorl/lpl1-1, 415-3308
References
TAC ME4069, TAC ME4068
Download: ML102420605 (2)


Text

From: Vaidya, Bhalchandra Sent: Monday, August 30, 2010 3:25 PM To: 'Coddington, Cornelius T'; 'Rochester, Margaret'; 'Crowthers, Michael H' Cc: Feliu, Luis; Wolfgang, Robert; McMurtray, Anthony; Salgado, Nancy

Subject:

ME 4068 & ME4069 - Draft Request for Additional Information, RR02 Revision 1 - MSRV Test Frequency Grace Period for 3rd 10-year IST

SUBJECT:

PPL Susquehanna, Units 1 and 2- DRAFT Request for Additional Information (RAI) RE: Relief Request RR-02, Extension of Testing Interval for MS SRVs (TAC NO. ME4068 & ME4069)

By letter dated June 1, 2010, you submitted relief requests RR-02, for the NRC approval to allow for the grace period of 6 months for the test frequency (in addition to the 6-year test frequency which was previously approved) for Main Steam Relief Valves PSV141F013A through H, J through N, P, R, and S (RR-02).

That staff of the Nuclear Reactor Regulation (NRR), Division of Component Integrity (DCI), Component Performance and Testing Branch (CPTB) has determined that additional information is needed to complete its review. The DRAFT RAI is provided below:

===========================================

RAI-RR-02-01 By letter dated June 1, 2010 (Accession No. ML101610805), the licensee requested NRC approval for Relief Request RR-02 Revision 1, to allow for a grace period of 6 months for the test frequency (in addition to the 6-year testing frequency which was previously approved) for MSRVs. The licensee stated that RR-02 Revision 1 is consistent with the grace period allowed by ASME Code Case OMN-17 (the six months grace period is not part of the previously approved Relief Request RR-02). ASME OM Code Case OMN-17 requires, in part, that disassembly and inspection of each valve after as-found set-pressure testing be performed to verify that parts are free of defects resulting from time-related degradation or service-induced wear. Also, ASME OM Code Case OMN-17 requires, in part, that each valve be disassembled and inspected in accordance with OMN-17 subparagraph (d) prior to the start of the 72-mo test interval.

The licensees request does not explain how these requirements are met.

Please provide your explanation as to how you meet the requirements in Code Case OMN-17 subparagraphs 1(b)(1), 1(b)(2), 1(d), and 1(e).

====================================

Please contact me ASAP to schedule a telephone conference between PPL Susquehanna and the NRC Staff to ensure that you clearly understand the NRC Staff request and to obtain the firm commitment for the supplemental submission with response to this request.

Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL1-1 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov

E-mail Properties Mail Envelope Properties ()

Subject:

ME 4068 & ME4069 - Draft Request for Additional Information, RR02 Revision 1 - MSRV Test Frequency Grace Period for 3rd 10-year IST Sent Date: 08/30/2010 2:54:11 PM Received Date: 08/30/2010 3:24:00 PM From: Vaidya, Bhalchandra Created By: Bhalchandra.Vaidya@nrc.gov Recipients:

ctcoddington@pplweb.com ('Coddington, Cornelius T')

Tracking Status: None mrochester@pplweb.com ('Rochester, Margaret')

Tracking Status: None mhcrowthers@pplweb.com ('Crowthers, Michael H')

Tracking Status: None Luis.Feliu@nrc.gov (Feliu, Luis)

Tracking Status: None Robert.Wolfgang@nrc.gov (Wolfgang, Robert)

Tracking Status: None Anthony.McMurtray@nrc.gov (McMurtray, Anthony)

Tracking Status: None Nancy.Salgado@nrc.gov (Salgado, Nancy)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 18665 08/30/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: