ES-401 CP-2011-06 Written Examination Review Worksheet Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only

1. Why include a handout copy of the SRO exam and not the RO exam? (Dont need either one) 2.

B/ Added SOP-108A, Step 5.1.G, Figure 1 as a reference to why seal differential 1 H 2 N S pressure rising in Distractors A and C is plausible.

2 H 2 N S D/

A/ Possible two correct answers. B is correct if water level is less than 23 feet and the stem information does not include water level. Recommend indicating water level 3 F 3 B E above the 23 foot mark in the stem to preclude B being correct. Added bullet for Refueling Cavity level at 858 feet.

4 F 3 B S A/

B/ Plausible to have normal pump suction as cooling for CCP bearings? Normal 5 F 2 B E cooling is provided by oil from a separate oil pump that is cooled by a heat exchanger. This affects two answers. Modified Distractors C &D (replaced the word Instructions

[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
2. Enter the level of difficulty (LOD) of each question using a 1 B 5 (easy B difficult) rating scale (questions in the 2 B 4 range are acceptable).
3. Check the appropriate box if a psychometric flaw is identified:

$ The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).

$ The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).

$ The answer choices are a collection of unrelated true/false statements.

$ The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.

$ One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).

4. Check the appropriate box if a job content error is identified:

$ The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).

$ The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).

$ The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).

$ The question requires reverse logic or application compared to the job requirements.

5. Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
7. Based on the reviewer=s judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
8. At a minimum, explain any AU@ ratings (e.g., how the Appendix B psychometric attributes are not being met). Page 1 of 7 OBDI 202 - IOLE Process

ES-401 CP-2011-06 2 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only suction with recirculation via).

6 H 2 B S D/

7 H 3 B S B/

8 H 3 B S C/

9 H 3 B E A/ Capitalized NOT in question stem.

10 H 3 B S C/

11 F 2 N S A/

12 F 2 B S D/

13 F 2 B S C/

C/ Plausible that securing Containment Fan Coolers 3 and 4 would isolate the leak?

14 H 3 B S Added Reference Drawing and System Description info on why valves must be locally shut.

15 H 3 N S B/

16 H 3 B S C/

17 F 2 B E D/ Revised Distractor B.

18 F 2 B S C/

19 F 2 B S B/

20 H 2 N S A/

21 H 3 B S B/

22 F 2 B S A/

C/ Overlap with Q8. Replaced Question and substituted K/A to avoid duplicity with 23 H 3 X B U Q08.

24 H 2 M S A/

25 H 2 N E A/ Added SOP-706 procedure title to Stem.

26 H 3 N E B/ Removed reference to Train and added SOP-501A procedure title to Stem.

27 F 2 B E B/ Minor wording change and added ABN-301 procedure title to Stem. Page 2 of 7 OBDI 202 - IOLE Process

ES-401 CP-2011-06 3 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 28 F 2 B S D/

29 F 3 B S D/

30 F 2 B S C/

B/ Ability to eval plant performance AND make operational judgments Raised power to 28% and removed last two bullets from Stem. Added whether a Turbine or 31 H 2 X B U Reactor trip was required to each Distractor. Changed the words the affected loop to Loop 1. Added ALM-0071A reference for why the Reactor would be tripped when an MSIV closes.

32 H 3 B S D/

33 H 3 B E D/ Changed the words consistent with to equal to in distractors B, C and D.

A/ ROs do not make OPERABILITY calls or TS calls below the line. Change Stem from Technical Specifications to OPT-112A-1, Accident Monitoring Instrumentation 34 H 2 X N U Check. Removed reference to Technical Specifications, rewrote Explanation, and replaced Objective.

35 H 2 B S B/

36 F 3 B S B/

37 H 2 M S A/

38 F 3 B E D/ Changed RM-11 to PC-11 in Distractors A & C.

39 H 3 B S D/

40 H 2 M S B/

B/ Frame vibration exceeded 2 mils/hr at 0200, not 0230. Adjusted the 0200 value 41 F 3 X M U for Frame vibration to make 0230 the correct answer.

42 H 4 B S A/(OR) 43 F 3 B S B/

44 H 3 B E C/ Moved reference to Unit 2 and added ABN-502 procedure title to Stem.

45 H 2 N E B/ Renumbered distractors and removed heater status to enhance plausibility.

46 H 2 B S B/

47 F 3 B E C/ Editorial Comment - add period to end of sentence on Distracter C. Corrected. Page 3 of 7 OBDI 202 - IOLE Process

ES-401 CP-2011-06 4 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 48 F 3 B E A/ Removed "... under the worst-case environmental conditions ... from the Stem.

A/ Removed Reactor Coolant Pumps have been secured and added ...A Loss of 49 H 3 B E Offsite Power has occurred. in the Stem. This effectively explains why RCPs are secured.

50 F 3 M S B/

51 H 3 B S A/

52 H 3 B S C/

D/ Plausibility of Distracter C - tripping the RX only on loss of SWS? Added ... and 53 H 2 B E Reactor Coolant Pumps." to Distractor C for balance.

54 H 3 B E B/

55 H 3 B S B/

56 H 3 B E A/ Added ...Turbine Control Valves... to Stem.

57 H 3 B S A/

58 H 3 B S D/

59 H 3 N S B/(OR) 60 H 3 N E A/ Added ABN-102 procedure title to Stem.

61 F 3 B S C/

C/ Question asks applicant to direct operations through the appropriate procedures.

62 H 3 X N U SRO level question. Question does meet the current K/A. Replaced Question and K/A.

63 H 3 B E C/ Added EOS-1.1A procedure title to Stem.

64 F 2 N S B/

65 F 2 B S D/

A/ Corrected punctuation and changed "... Continuous Action step." to "...

66 F 2 N E Continuous Action." In Distractors B and D.

67 F 3 N S C/

68 H 2 X B U C/(OR) Multiple correct answers - If I pick 790# that still gives me the answer when rounded up to 800#. Same for picking 820# and rounding down to 800# on EOP- Page 4 of 7 OBDI 202 - IOLE Process

ES-401 CP-2011-06 5 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 3.0A, Step 6.b. Modified Steam Generator pressures in the Stem and deleted Bases information provided in the Written Exam References.

69 F 2 B E B/ Added OWI-110 procedure title to Stem.

70 F 2 N S D/

71 F 3 B S D/

72 H 2 B E C/ Added ABN-902 procedure title to Stem.

73 F 2 B S B/

74 F 2 B E A/ Added EOP-0.0A/B procedure title to Stem.

75 F 2 B S C/

D/ Possible two correct answers. Stem info gives Safeguards DC Bus voltage at 105 VDC. ECA-0.0 says that minimum system voltage required for equipment operation is APPROXIMATELY 105 volts. ECA-0.0 then states that IF DC bus voltage is Less 76 H 3 B E than 110 volts AND plant staff determine it necessary to conserve batteries THEN 1)

Reference ABN-603, Loss of Protection or Instrument Bus. This makes Distracters C and D arguably correct. Modified reason in the second part of Distractor C since ABN-603 entry could be made. Modified Plausibility statement.

77 F 3 N S C/

C/ Entry conditions for AOPs or plant parameters that require direct entry to major 78 H 3 X B U EOPs are RO level questions. Also, knowledge of second half of question not required to determine correct answer. Replaced Question and K/A.

79 H 4 B S B/ Added FRZ-0.1A Critical Safety Functions Status Tree to references.

80 H 3 M S D/

81 H 3 B S C/ Added FRH-0.1A, Step 4 to references.

82 H 2 M S A/

C/ Added punctuation and Technical Specification REQUIRED ACTION for 83 H 3 N E Condition F to references.

84 H 2 B E D/ Added FRC-0.2B procedure title to Stem.

D/ Enhanced Explanation for the correct answer to differentiate why the maximum 85 H 3 B S allowable channel disagreement as stated in the K/A was addressed in the provided reference (OPT-102A-6). Page 5 of 7 OBDI 202 - IOLE Process

ES-401 CP-2011-06 6 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only A/ Modified Stem to include ABN-501 procedure title and reworded Distractors so 86 H 3 B E that reason for the action was removed.

C/ Revise using procedures in distracters as required by KA. Reworded Distractors 87 H 3 X N U to include SOP and ABN procedure titles.

88 H 2 N S B/

89 F 2 N S B/ Modified Explanation for correct answer.

A/ K/A mismatch - K/A requires ability to locate and operate components, including 90 H 3 X B U local controls. Question as written asks knowledge of automatic functions. Replaced Question and K/A.

A/ Question can be answered by simple systems knowledge. Also not necessary to be knowledgeable of the applicable TS to answer this question. - RO level question.

91 H 2 X X N U Modified distractors by removing procedure references and expanding Technical Specification criteria.

92 H 3 N S C/

93 F 3 B E D/ Added RFO-302 procedure title to Stem.

94 F 2 N S A/

95 H 3 N S D/

96 H 3 N S B/

97 F 2 N S D/

98 H 3 B E A/ Revised distracters to move common wording to the stem.

99 H 2 N S C/

100 H 3 B S D/

B= 54 (72%) F= 32 (43%) E= 23 (31%)

RO TOTALS: M= 5 (7%) H= 43 (57) U= 6 (8%) Additional Notes:

N= 16 (21%) S= 46 (61%)

B= 11 (44%) F= 5 (20%) E= 6 (24%)

SRO TOTALS: M= 2 (8%) H= 20 (80%) U= 4 (16%) Additional Notes:

N= 12 (48%) S= 15 (60) Page 6 of 7 OBDI 202 - IOLE Process

ES-401 CP-2011-06 7 Form ES-401-9

GENERAL COMMENT

S:

1. Average difficulty is __2.55 on the RO exam and 2.72_ on the SRO exam.
2. The answer distribution is: RO / SRO A = 19 (25%) / 6 (24%)

B = 23 (31%) / 4 (16%)

C = 18 (24%) / 7 (28%)

D = 15 (20%) / 7 (28%)

3. There are 2 RO and 0 SRO questions with attachments provided. Page 7 of 7 OBDI 202 - IOLE Process