ML12117A254

From kanterella
Revision as of 04:26, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2011 EOC Slides
ML12117A254
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/26/2012
From:
NRC/RGN-II/DRP/RPB1
To:
References
Download: ML12117A254 (25)


Text

Catawba Nuclear Station Annual Assessment Meeting 2011 Reactor Oversight Process Nuclear Regulatory Commission - Region 2 Enclosure 2

Agenda g

Introduction Reactor Oversight Process Industry Performance Catawba Nuclear Station Performance Results Public Questions to NRC Enclosure 2

Meetings g Purposep NRC will discuss the Reactor Oversight P

Process and d th the performance f off th the nuclear industry as a whole in 2011 P bli fforum ffor discussion Public di i off Catawbas performance in 2011 Enclosure 2

Region g 2 Organization g Victor McCree Regional Administrator Len Wert Deputy Regional Administrator Rick Croteau Joel Munday Director, Division of Reactor Director, Division of Reactor j

Projects Safetyy Bill Jones Chris Christensen Deputy Director Deputy Director Jonathan Bartley Branch Chief Regional Inspectors Catawba Project Engineers Resident Inspectors Curtis Rapp, Senior PE Andy Hutto, Senior RI Eric Stamm, PE Ron Cureton, RI Enclosure 2

What We Do Safety Security Environment Enclosure 2

What We Regulate Reactors Materials Waste Enclosure 2

What We Dont Regulate Military Radon X Rays X-Rays Enclosure 2

Assurance of Plant Safety Continuous Long-Term g

T i i Training Maintenance Regulation Compliance Defense In-Depth Enclosure 2

Regulatory Principles Independence p

Openness Efficiency Clarity Reliability Enclosure 2

How We Regulate Enclosure 2

Regulatory Framework PUBLIC HEALTH AND SAFETY NRCs Safety AS A RESULT OF CIVILIAN NUCLEAR REACTOR Mission OPERATION REACTOR RADIATION Strategic g SAFEGUARDS SAFETY SAFETY Performance Areas Cornerstones PUBLIC OCCUPATIONAL INITIATING MITIGATING BARRIER EMERGENCY RADIATION RADIATION EVENTS SYSTEMS INTEGRITY PREPAREDNESS SECURITY SAFETY SAFETY Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution Enclosure 2

Performance Indicators 17 Performance Indicators PIs for each cornerstone Licensee submits data to NRC quarterly Inspection program verifies accuracy Data available on NRC website Enclosure 2

Significance Threshold Performance Indicators Green White Yellow Red Increasing Safety Significance I

Inspection ti Findings Fi di Green White Yellow Red Increasing Safety Significance Enclosure 2

Action Matrix Columns Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Degraded Performance Increasing

  • Safety Significance
  • Inspection
  • Management Involvement
  • Regulatory Action Enclosure 2

Industry-Wide y Performance 3 11 As of 12/31/2011 11 Li Licensee R

Response

Regulatory Response Degraded Cornerstone Multiple/Repetitive Degraded Cornerstone Unacceptable IMC 0350 Process 88 Enclosure 2

Industry-Wide Inspection Findings Finding data current as of 2/24/2012 and does not include security findings Calendar Year 2011 data Green 846 White 13 Yellow 2 Red 0 Enclosure 2

Industry-Wide y Performance Indicators Calendar Year 2011 data Green 6585 White 9 Yellow 0 Red 0 Enclosure 2

NRC Annual Assessment Summary Catawba Nuclear Station Duke Energy operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

Catawba was in the Licensee Response C l Column off the th NRCs NRC ROP A Action ti Matrix M t i ffor the last quarter of 2011.

Substantive cross-cutting issues: None Enclosure 2

NRC Annual Assessment Summary Catawba Nuclear Station All cornerstone objectives were met NRC plans baseline inspections at Catawba Nuclear Station for 2012 Enclosure 2

NRC Inspection p Activities Catawba Nuclear Station for 2011 2,326 hours0.00377 days <br />0.0906 hours <br />5.390212e-4 weeks <br />1.24043e-4 months <br /> of inspection and related activities comprised of baseline and plant status Two resident inspectors on site - residents are stationed at the site and walk through the plant every day 8 regional inspections No major team inspections Enclosure 2

Catawba PIs and Findings g January 1 through December 31 31, 2011 All Findings and Performance Indicators were Green G

Enclosure 2

Actions in Response to the Japan Nuclear Accident

  • Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov

  • Office of Public Affairs Point of Contact:

OPA.resource@nrc.gov or 301-415-8200 Enclosure 2

NRC Social Media Channels

http://public-blog.nrc-gateway.gov/

Contactingg the NRC Report an emergency

  • (301) 816-5100 816 5100 (call collect)

Report a safety concern

  • (800) 695 695-7403 7403
  • Allegation@nrc.gov G

Generall iinformation f ti or questions ti

  • www.nrc.gov Contact Catawba Resident Inspectors
  • 803-831-2963 Enclosure 2

End of Presentation Nuclear Regulatory Commission Region 2 Rock Hill, Hill South Carolina A il 24, April 24 2012 Enclosure 2