Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22336A038 | 8 December 2022 | Presentation Slides December 8, 2022, pre-submittal Meeting to Discuss Proposed License Amendment Request Regarding TS 3.7.11, Control Room Area Chilled Water System (Cracws) | Post Accident Monitoring |
ML22251A235 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22067A199 | 3 March 2022 | Annual Assessment Meeting Presentation | Coronavirus |
ML21336A142 | 7 December 2021 | December 7, 2021, Pre-submittal Presentation Slides Regarding Embedded Flaw Repair Relief Request - Revised | Stress corrosion cracking Eddy Current Testing Liquid penetrant |
ML21327A211 | 23 November 2021 | December 7, 2021, Pre-submittal Presentation Regarding Embedded Flaw Repair Relief Request | Stress corrosion cracking Eddy Current Testing Liquid penetrant |
ML21236A286 | 30 August 2021 | License Amendment Request for Revision 1 of DPC-NE-1007-P, Conditional Exemption of the End-of-Cycle (EOC) Moderator Temperature Coefficient (Mtc) Measurement Methodology | |
ML21116A254 | 15 April 2021 | C2R24 Relief Request Pre-Submittal Slides Call 1 | Boric Acid |
ML21089A173 | 30 March 2021 | EOC Slides Final | Coronavirus |
ML21081A124 | 22 March 2021 | EOC Slides Final | Coronavirus |
ML19318F291 | 18 November 2019 | Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request | Finite Element Analysis Stress corrosion cracking |
ML19214A056 | 7 August 2019 | Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 | |
ML18157A032 | 6 June 2018 | Nw System LAR Presubmittal Meeting | Local Leak Rate Testing |
ML17278A134 | 4 October 2017 | Duke Presentation for Public Meeting 09-20-17 | |
ML16242A238 | 30 August 2016 | Catawba/Mcguiproposed Changes to Technical Specification 3.8.1, AC Sources - Operating. | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment Offsite Circuit |
ML16112A011 | 28 April 2016 | Duke Presentation in Support of April 28, 2016 Pre-Submittal Meeting Catawba Nuclear Station, Units 1 and 2, License Amendment Request Proposed TS Bases Descriptions for Shared Systems | Enforcement Discretion |
ML16117A463 | 28 April 2016 | Duke Presentation in Support of April 28, 2016 Pre-Submittal Meeting Catawba Nuclear Station, Units 1 and 2, License Amendment Request Proposed TS Bases Descriptions for Shared Systems (Revised) | Enforcement Discretion |
ML16081A335 | 17 March 2016 | Summary of Meeting with Public Concerning Annual Assessment of Catawba Nuclear Station, Units 1 and 2 | |
ML15106A030 | 15 April 2015 | Meeting Summary with Public to Discuss the Annual Assessment of Catawba Nuclear Station, Units 1 and 2 | |
ML15099A587 | 14 April 2015 | Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson | Hot Short Safe Shutdown Probabilistic Risk Assessment Multiple Spurious Operation Large early release frequency Fire Protection Program |
ML15085A424 | 24 March 2015 | Nuclear Reactor Effluents Webinar | |
ML14126A679 | 6 May 2014 | Summary of Public Meeting with Catawba, Units 1 & 2 to Discuss Annual Assessment | |
ML14016A169 | 7 January 2014 | Presentation Regarding Use of High Density Polyethylene (Hdpe) Piping as Replacement for Underground Piping January 7, 2014 -Catawba Nuclear Station Hdpe Relief Request | |
ML13312A988 | 8 November 2013 | Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications | |
ML13308A007 | 1 November 2013 | Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. | |
ML13127A080 | 18 April 2013 | Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Emergency Lighting Large early release frequency Hemyc Fire Protection Program |
ML12261A223 | 17 September 2012 | September 11, 2012 - Summary of Category 1 Public Meeting Held in Atlanta, Ga | |
ML12206A325 | 7 August 2012 | G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 | Fitness for Duty Condition Adverse to Quality Aging Management License Renewal |
ML12188A071 | 11 July 2012 | G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 | Fitness for Duty Condition Adverse to Quality Aging Management License Renewal |
ML12117A254 | 26 April 2012 | 2011 EOC Slides | |
ML11097A027 | 14 April 2011 | Summary of Meeting with Duke Energy Carolinas, LLC, on Upcoming Submittal of License Amendments Regarding Implementation of National Fire Protection Association Standard 805, (TACs ME5767 & ME5768, Catawba 1 & 2 ME5769 & ME5770 Mcguire 1 & | Fire Barrier Hemyc Fire Protection Program |
ML092730460 | 7 October 2009 | 09/01/2009 Summary of Conference Call with Duke Regarding Responses to Generic Letter (GL) 2004-02. Meeting Handouts | Mission time Coatings |
ML091280303 | 8 May 2009 | Summary of Public Meeting/Open House to Provide Opportunities to Discuss Annual Assessment of Catawba Nuclear Station with Public | |
ML083300061 | 24 November 2008 | Meeting Slides for Category 1 Public Meeting with Duke Energy Carolinas, Regarding a Request for Additional Information on Duke'S Response to GL 200-04 | |
ML082200163 | 1 August 2008 | Meeting Slides, Performance Discussion Meeting to Provide the NRC Staff with an Update of Plant Performance at the Catawba Nuclear Station | |
ML081990367 | 15 July 2008 | Handouts from Duke Energy & NRC Meeting - NQA-1 Based QA Program Conversion | |
ML072050220 | 3 May 2007 | Public Meeting Slides for Catawba | Power change |
ML052550307 | 21 September 2005 | Meeting Summary with NRC, Ventilation Systems Amendments | |
ML052920066 | 19 September 2005 | 9/19/05, Catawba, Units 1 and 2, Enclosure 2, Meeting Summary Handouts, Nuclear Service Water System | Probabilistic Risk Assessment Temporary Modification |
ML052430093 | 18 August 2005 | Att. 6, FAQ Log | Mission time Coatings |
ML051950197 | 27 June 2005 | 6/27/05, Catawba, Meeting Summary Handouts, Attachment 2, Polyethylene Piping Use for Safety Related Buried Service Water Pipe | Hydrostatic Foreign Material Exclusion |
ML051090595 | 22 March 2005 | Meeting Slides for NRC CY2004 Annual Assessment Meeting - Catawba Nuclear Station | |
ML050250157 | 6 December 2004 | Meeting Presentation Slides to 12/06/2004 Summary of Meeting with Duke Energy Corporation to Discuss Appendix R Reconstitution and Transition to NFPA 805 | Hot Short Safe Shutdown Fire Barrier Enforcement Discretion Probabilistic Risk Assessment |
ML042190353 | 30 July 2004 | Summary of 07/27/2004 Meeting with Duke Energy Corp. Re. Modification to Quality Assurance Program for Catawba, McGuire, and Oconee Nuclear Station, Attachment 2 - Meeting Handouts | |
ML041250222 | 23 April 2004 | Meeting Handouts Next Generation Fuel and MOX | Fuel cladding |
ML041110531 | 8 April 2004 | Duke Energy Corporation Meeting Handouts, Enclosure 2, Meeting Summary | |
ML040360219 | 22 January 2004 | /22/2004 Meeting Handouts by the Licensee - Enclosure 3 | |
ML040370740 | 22 January 2004 | Enclosure 2 - Meeting Handouts from 01/22/2004 Meeting Between NRC-Duke Power and Framatome Anp | Exemption Request |
ML033240636 | 17 November 2003 | Meeting Between Duke Energy, Framatome Anp and NRC Staff on Use of MOX Lead Test Fuel Assemblies at Catawba Nuclear Station | Exemption Request |
ML032720621 | 24 September 2003 | Examiner - Vendor Matrix with Phone Number | |
ML032720611 | 22 September 2003 | Exam Process |