C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication SamplingML17026A414 |
Person / Time |
---|
Site: |
Beaver Valley, Millstone, Hatch, Monticello, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Perry, Indian Point, Fermi, Saint Lucie, Point Beach, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Limerick, River Bend, Vermont Yankee, Crystal River, Diablo Canyon, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, Cook, Fort Calhoun, FitzPatrick, LaSalle |
---|
Issue date: |
01/20/2017 |
---|
From: |
Lauzon A C&D Technologies |
---|
To: |
Office of Nuclear Reactor Regulation |
---|
References |
---|
52502 |
Download: ML17026A414 (5) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Perry, Indian Point, Fermi, Saint Lucie, Point Beach, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Limerick, River Bend, Vermont Yankee, Crystal River, Diablo Canyon, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, Cook, Fort Calhoun, FitzPatrick, LaSalle |
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification DCL-24-056, Part 21 Interim Report Re Emergency Diesel Generator Fuel Snubber Valve Assembly2024-05-28028 May 2024 Part 21 Interim Report Re Emergency Diesel Generator Fuel Snubber Valve Assembly ML24127A0892024-05-0202 May 2024 57079-EN57079-1 - Redline Strikethrough e-mail Re Part 21 Interim Notification of Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24107A6972024-04-12012 April 2024 Engine Systems, Inc Part 21 Report Re EMD Cylinder Liner Water Leak ML24103A2022024-04-0909 April 2024 EN 57068 - Transco Products Inc Part 21 Initial Notification of Unverified Critical Characteristics of Darmatt KM-1 Flat Board ML24057A3382024-02-25025 February 2024 EN 56993 - Fairbanks Morse ML24088A1102024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves ML24088A1142024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Report 23-02 Re Synchro-Start Mini-Gen Signal Generator ML24057A3372024-02-25025 February 2024 56992-EN 56992 - Fairbanks Morse Defense ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24008A0692024-01-0404 January 2024 Part 21 Report No. 10CFR21-0137, Rev. 0 for Reportable Notification for an Emo Cylinder Liner with Bore Deficiency, P/N 9318833 (Component of Power Assembly P/N 40124897), S/N 20M0938 ML24002A7112023-12-28028 December 2023 Interim Part 21 Report of a Deviation or Failure to Comply - Lube Oil Scavenging and Fuel Oil Engine Driven Pump NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24004A2092023-12-12012 December 2023 Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code ML23352A2382023-12-0808 December 2023 56882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays ML23241A0022023-08-25025 August 2023 Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils RBG-48245, Part 21 Notification of a Failure to Comply Identified During Preinstallation Testing on a Motor Driven Relay2023-08-24024 August 2023 Part 21 Notification of a Failure to Comply Identified During Preinstallation Testing on a Motor Driven Relay ML23221A3702023-08-0303 August 2023 Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 ML23187A4722023-06-30030 June 2023 56603-EN 56603 - Engine Systems, Inc., Report No. 10CFR21-0136, Rev. 0 Re Voltage Regulator Chassis ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23100A1072023-04-10010 April 2023 Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker ML23094A1252023-03-31031 March 2023 Talen Part 21 Final Notification P21-03032023-FN R0 Re Defect Identified in Automatic Transfer Switch ML23094A1242023-03-31031 March 2023 EN 56387 Update - Paragon Energy Solutions Final Notification of Defect of Automatic Transfer Switch ML23087A1292023-03-23023 March 2023 Trillium Valves USA - Part 21 Written Notification - Event Number: 56420 ML23082A1122023-03-17017 March 2023 10 CFR Part 21 Report – Inconsistent Crimping of Motor Leads to Ring Terminal Connectors and Failure to Comply. Trillium Valves USA Part 21 Evaluation I211003 ML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 ML23060A0412023-03-0101 March 2023 Part 21 Interim Report of a Deviation or Failure to Comply Associated with a Limitorque Actuator ML23038A0192023-02-0606 February 2023 Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors ML23025A2532023-01-25025 January 2023 Part 21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML23024A0292023-01-24024 January 2023 Part 21 Interim Report of a Deviation or Failure to Comply Associated with a Limitorque Actuator 2024-09-09 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Limerick]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Diablo Canyon]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:Cook]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:LaSalle]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Limerick]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Diablo Canyon]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:Cook]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:LaSalle]] </code>. |
Text
0112012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 52502 Rep Org: C&D TECHNOLOGIES, INC. Notification Date I Time: 01/20/2017 16:01 (EST)
Supplier: C&D TECHNOLOGIES Event Date I Time: 11/23/2016 (EST)
Last Modification: 01/20/2017 R~gion: 1 Docket#:
City: BLUE BELL Agreement State: Yes County: License#:
State: PA NRC Notified by: ARMAND LAUZON Notifications: SILAS KENNEDY ~1DO HQ Ops Officer: JEFF HERRERA LADONNA SUGGS R2DO Emergency Class: NON EMERGENCY AARON McGRAW R3DO 10 CFR Section: GREG WERNER R4DO 21.21(a)(2) INTERIM,EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL PART 21 MATERIALS EMAIL PART 21 - PLASTIC JAR DEDICATION SAMPLING The following is an excerpt of a part 21 received via email:
"The purpose of this letter is to provide the NRC an interim report in general conformity to the requirements of 10CFR Part 21.21 (a)(2). During an internal audit in November 2016, the sampling plan* for dedication of plastic jars used in 1E battery cells was reviewed. Two lot numbers are associate.d with each plastic jar, a material lot number and a molding number. A material lot may encompass several molding lots. The dedication sampling plan was based on the material lot, and may not have properly sampled variations in critical characteristics generated by molding lots. An analysis of historical data is underway to determine whether any deviations to specifications for critical characteristics may have occurred, and whether these possible deviations could represent a defect as defined by Part 21. C&D expects that this analysis will be completed by March 20, 2017.
The facilities where the components have been supplied are:
Arkansas Nuclear One, Limerick, Beaver Valley, Millstone, Braidwood, Monticello, Browns Ferry, Nine Mile Point, Byron, Oconee, Clinton, Palisades, Columbia, Perry, Cook, Point Beach, Cooper, Prairie Island, Crystal River, River Bend, Diablo Canyon, Robinson, Duane Arnold, Salem, Farley, Sequoyah, Fermi, St. Lucie, Fitzpatrick, Summer, Ft. Calhoun, Susquehanna, Grand Gulf, Three Mile Island, Harris, US Navy, Hatch, Vogtle, Hope Creek, Vermont Yankee, Indian Point, Waterford, Watts Bar, LaSalle "If you have any questions or wish to discuss this matter or this report, please contact "Robert Malley VP Quality and Process Engineering bmalley@cdtechno.com
0112012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel (215) 619-7830"