ML13242A253

From kanterella
Revision as of 14:03, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Draft 2nd Set of RAIs for Susquehanna EDG Voltage LAR Submittal
ML13242A253
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/28/2013
From: John Hughey
Plant Licensing Branch 1
To: Jennings J
- No Known Affiliation
Hughey J
Shared Package
ML13242A251 List:
References
Download: ML13242A253 (1)


Text

From: Hughey, John To: "Jennings, Jason" Cc: "jltripoli@pplweb.com"; Whited, Jeffrey

Subject:

FW: Draft RAI For Susquehanna EDG Voltage LAR Submittal Date: Wednesday, August 28, 2013 4:51:00 PM Attachments: Draft 2nd EDG AMD Voltage RAI.docx Please see correction to date below.

From: Hughey, John Sent: Wednesday, August 28, 2013 4:43 PM To: 'Jennings, Jason' Cc: 'jltripoli@pplweb.com'; Whited, Jeffrey

Subject:

Draft RAI For Susquehanna EDG Voltage LAR Submittal

Jason, By letter dated September 18, 2012, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12262A322) as supplemented by letter dated, May 10, 2013, (ADAMS Accession No. ML13130A130) PPL Susquehanna, LLC (PPL) submitted a license amendment request for Susquehanna Steam Electric Station (SSES), Units 1 and
2. The proposed amendments would change Technical Specification (TS) Surveillance Requirements (SRs) 3.8.1.9, 3.8.1.11, 3.8.1.12 and 3.8.1.19 in TS 3.8.1, AC Sources-Operating. Specifically, the proposed amendments would increase the Diesel Generator (DG) acceptable minimum steady state voltage when operating in emergency/isochronous mode.

The NRC staff has reviewed the information submitted by PPL, and based on this review, determined additional information is required to completed the assessment of the submitted information. Please find attached a Draft Request For Additional Information.

Please respond to me by Wednesday, September 3 4, 2013, and advise if you desire to hold a teleconference to discuss the question. The NRC staff will request a response to the RAIs within 30 days of the formal NRC RAI transmittal letter.

Thank you, John John Hughey Susquehanna Acting Project Manager Salem & Hope Creek Project Manager NRR / Division of Operating Reactor Licensing Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov