Letter Sequence Supplement |
---|
|
|
MONTHYEARML13058A0592013-02-22022 February 2013 Licesne Amendment Request to Update Pressure-Temperature Limit Curves No. 2012-10 Project stage: Other ML13165A1472013-06-21021 June 2013 Request for Additional Information Regarding Amendment Application Related to Reactor Coolant System Pressure and Temperature Limit Curves Project stage: RAI ML13259A1202013-09-10010 September 2013 Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 1 Project stage: Supplement ONS-2013-016, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 22013-10-25025 October 2013 Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 2 Project stage: Supplement ML13322B2762013-11-14014 November 2013 11/14/13 e-mail from B.Shingleton to R.Guzman PT Curves LAR Supplement 2 - ONS Unit 3 Lower Nozzle Belt Forging Reported in ANP-3127, Revision 2 Project stage: Supplement ML13305A1222013-11-25025 November 2013 Enclosure 3 - Areva Document No. 32-9212003-000, Lst Considering RCS Piping and RVCH Limit for B&W Plant Designs, September 2012 Project stage: Request ONS-2013-023, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 32013-11-29029 November 2013 Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 3 Project stage: Supplement ML13342A0022013-12-0505 December 2013 12/5/13 E-mail from R.Guzman to B.Shingleton - Follow-up RAI to Pressure Temperature Curve LAR Supplement 3, Oconee Nuclear Station Units 1, 2, and 3 (TAC Nos. MF0763/64/65) Project stage: RAI ML13350A0982013-12-16016 December 2013 E-mail from B.Shingleton to R.Guzman Clarification of Upper Shelf Energy Values for ONS Pressure-Temperature Curve 54 EFPY LAR Project stage: Other ML14028A4822014-01-31031 January 2014 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML14041A0932014-02-27027 February 2014 Issuance of Amendments Regarding Revised Pressure-Temperature Limits Project stage: Approval 2013-12-05
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24257A0212024-09-11011 September 2024 Document Request for Oconee Nuclear Station - Radiation Protection Inspection - Inspection Report 2024-04 ML24234A2972024-08-21021 August 2024 August 21, 2024 - Oconee Nuclear Station, Units 1, 2, and 3 - Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.7.7 ML24211A0872024-07-27027 July 2024 EN 57079 Paragon Energy Solutions Final - No Active Links ML24197A2292024-07-15015 July 2024 Email from Mark Yoo (NRC) to Steve Snider (Duke) - Oconee SLRA - RAI - 2024 Annual Update ML24190A0462024-07-0505 July 2024 Notification of Inspection and Request for Information ML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24143A1322024-05-22022 May 2024 May 22, 2024, Verbal Authorization for Duke Energy Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI (RA-24-0152) (EPID L- 2024-LLR-0034) ML24127A0892024-05-0202 May 2024 57079-EN57079-1 - Redline Strikethrough e-mail Re Part 21 Interim Notification of Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24086A3772024-03-26026 March 2024 Request for Additional Information License Amendment Request to Revise Technical Specification 5.5.2 ML24036A1442024-02-27027 February 2024 NRC to Fws, NRC Request for Concurrence with Endangered Species Act Determinations for Oconee Nuclear Station, Units 1, 2, and 3, Proposed Subsequent License Renewal in Oconee County, South Carolina (Consultation Code: 2023-0054989) ML24054A0492024-02-21021 February 2024 Notification of Oconee Nuclear Station FEI Inspection and Information Request-Email ML23349A0272023-12-15015 December 2023 – Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 5.5.2 ML23284A3322023-10-11011 October 2023 Request for Additional Information Alternative Request (RA-22-0174) (L-2022-LLR-0060) ML23270B8362023-09-26026 September 2023 Code Case N-752 Audit September 26, 2023, E-mail Providing Additional Information Regarding the Use of Owner'S Requirements and Engineering Judgment in Lieu of Code and Standards ML23267A0032023-09-21021 September 2023 RP Inspection Document Request ML23269A0412023-08-22022 August 2023 Code Case N-752 Audit; August 22, 2023, E-mail Providing Additional Information Regarding Design and Quality Program Requirements ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23144A0862023-05-24024 May 2023 Acceptance of Requested Licensing Action Proposed Relief Request (RA-23-0018) to Use ASME Code Case 853 ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23125A1452023-05-0505 May 2023 Change in Estimated Review Schedule and Level of Effort for Proposed Alternative to Use Code Case N-752 ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23095A0052023-04-0404 April 2023 002 Radiation Safety Baseline Inspection Information Request ML23086C0362023-03-27027 March 2023 Request for Additional Information Steam Generator Tube Inspection Report (03R31) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23038A1832023-02-0707 February 2023 Request for Additional Information Alternative Request (RA-22-0174) to Use ASME Code Case N-752 ML23031A1552023-01-17017 January 2023 1/17/2023 Email from John Moses, Deputy Director, Division of Rulemaking, Environmental, and Financial Support, to Diane Curran, Counsel to Beyond Nuclear and the Sierra Club, Request for Extension of Scoping Comment Period for Oconee EIS ML22294A0812022-10-21021 October 2022 Nrc/Duke Steam Generator Inspection Call for November 8, 2022 NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22251A2902022-09-0808 September 2022 Request for Additional Information Additional Mode Change Limitations Applicable to the Adoption of Technical Specifications Tasks Force Traveler (TSTF) No. 359, Revision 9 ML22235A6552022-08-23023 August 2022 Acceptance of Requested Licensing Action Proposed Alternative to Use ASME Code Case N-752 NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22234A1262022-07-0808 July 2022 Email from NRC to Duke - Feedback on Trp 76 RAI Responses - July 8, 2022 ML22234A1272022-06-14014 June 2022 Email from NRC to Duke - Feedback on Trp 76 RAI Responses - June 14, 2022 ML22154A2142022-06-0101 June 2022 Email from NRC (Angela Wu) to Duke (Paul Guill) - Oconee SLRA - 2nd Round RAI B2.1.7-4b ML22157A0012022-06-0101 June 2022 Email from NRC (Angela Wu) to Duke (Paul Guill) - Oconee SLRA - Additional NRC Comments on RAI 4.6.1-1a ML22124A2052022-05-0404 May 2022 Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System ML22124A1612022-05-0303 May 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.7-4a ML22122A0192022-04-28028 April 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.9-2a ML22122A1322022-04-27027 April 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round Requests for Additional Information (FE 3.5.2.2.2.6 - Irradiation Structural) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22130A0112022-04-25025 April 2022 Email: Oconee SLRA - RAI 4.6.1-1a - NRC Staff Comments ML22112A1892022-04-22022 April 2022 Acceptance Review for Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9 ML22113A0082022-04-20020 April 2022 Email from Marieliz Johnson (NRC) to Steve Snider (Duke) - Oconee SLRA - Request for Additional Information 3.1.2-1 ML22112A0072022-04-20020 April 2022 Email from Marieliz Johnson (NRC) to Steve Snider (Duke) - Oconee SLRA - Request for Confirmation of Information 3.5.2.2.2.6-L ML22088A0452022-03-28028 March 2022 Radiation Safety Baseline Inspection Initial Information Request Inspection Report 2022002 2024-09-11
[Table view] |
Text
From: Shingleton, Boyd <Boyd.Shingleton@duke-energy.com>
Sent: Thursday, November 14, 2013 2:27 PM To: Guzman, Richard Cc: Whitaker, David E; Wasik, Christopher J
Subject:
ONS 54 EFPY PT Curves LAR Supplement 2 - ONS Unit 3 Lower Nozzle Belt forging reported in ANP-3127, Revision 2 came from a Certified Material Test Report (CMTR).
Rich, AREVA has advised that the new material data for the ONS Unit 3 Lower Nozzle Belt forging did not come from the CMTR provided by the Rotterdam Dockyard.
The new copper content for the ONS-3 Lower Nozzle Belt Forging (LNBF) comes from AREVA testing of an ONS-3 nozzle belt dropout remnant that contained LNBF material. The composition was determined via supplemental testing by AREVA in accordance with the AREVA QA program. The RTndt is determined by a Regulatory Guide 1.99 Revision 2 type statistical evaluation (mean/standard deviation) of data in the NRCs RVID2 database. The initial RTNDT and its uncertainty, , for the ONS-3 LNBF are estimated from a sample of A 508 Cl2 forgings specifically from the Rotterdam Dockyard. This provides a better estimate of the ONS-3 LNBF initial RTNDT than the previous values, which were estimated in accordance with Regulatory Guide 1.99, Revision 2 from a sample of materials from the same ASTM specification (A 508 Cl2) but without regard to supplier.
Boyd Shingleton ONS Regulatory Affairs 864-873-4716 From: Guzman, Richard [1]
Sent: Friday, November 08, 2013 6:40 PM To: Shingleton, Boyd Cc: Wasik, Christopher J; Patterson, Terry L; Guy, Robert H
Subject:
RE: ONS 54 EFPY PT Curves LAR Supplement 2
- This is an EXTERNAL email. Exercise caution. DO NOT open attachments or click links from unknown senders or unexpected email. ***
- Boyd, In his review of Supplement 2, the technical reviewer requests the licensee to confirm that the new material data for the ONS Unit 3 Lower Nozzle Belt forging reported in ANP-3127, Revision 2 came from a Certified Material Test Report (CMTR). A response via email will suffice; if necessary, we can also have a phone call to discuss further.
- Thanks, Rich Guzman Sr. Project Manager NRR/DORL
US NRC 301-415-1030 From: Shingleton, Boyd [2]
Sent: Friday, October 25, 2013 5:32 PM To: Guzman, Richard Cc: Wasik, Christopher J; Patterson, Terry L; Guy, Robert H
Subject:
ONS 54 EFPY PT Curves LAR Supplement 2
- Rich, Attached is the latest supplement to the PT curve LAR.
Boyd Shingleton Oconee Regulatory Affairs 864-873-4716