IR 05000295/2014009

From kanterella
Revision as of 20:35, 31 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IR 05000295/2014009(DNMS); 05000304/2014009(DNMS); 07201037/2014003(DNMS) on 09/18/14 with In-office Review Through 10/16/14, Zion Nuclear Power Station, NRC Inspection Report
ML14316A214
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/10/2014
From: Robert Orlikowski
NRC/RGN-III/DNMS/MCID
To: Sauger J
ZionSolutions
Slawinski W
References
IR 2014003, IR 2014009
Download: ML14316A214 (20)


Text

UNITED STATES mber 10, 2014

SUBJECT:

NRC INSPECTION REPORT 05000295/2014009(DNMS); 05000304/2014009(DNMS);

07201037/2014003(DNMS) - ZION NUCLEAR POWER STATION

Dear Mr. Sauger:

On September 18, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed onsite inspection activities for the third calendar quarter of 2014 at the permanently shut-down Zion Nuclear Power Station in Zion, Illinois. The inspection continued with in-office review through October 16, 2014. The purpose of the inspection was to determine whether activities associated with the decommissioning project and ongoing spent fuel transfer operations were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with you and members of your staff on October 16, 2014.

During the quarterly inspection period, the NRC inspectors reviewed the execution of the site decommissioning project focusing on the preparations and the transfer of Greater-Than-Class-C (GTCC) waste to the dry cask storage pad, site processes for final status surveys and release surveys related to demolished structures, ongoing spent fuel transfer operations, aspects of the occupational radiation safety program, and implementation of the corrective action program.

The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your 10 CFR Part 50 specific license and 10 CFR Part 72 general license. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, independent radiation measurements, and interviews with personnel.

Based on the results of this quarterly inspection, one violation of regulatory requirements was identified associated with monitoring for hydrogen gas during welding of a spent fuel cask. The violation is categorized at Severity Level IV (very low safety significance). Since the safety significance of the violation is low and the issue is documented in your corrective action program, the violation is dispositioned as a non-cited violation (NCV) in accordance with Section 2.3.2 of the Enforcement Policy.

No response is required for the non-cited violation. However, if you contest the subject or severity level of the NCV, you should provide a response within 30-days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator - Region III; and the Director, Office of Enforcement, Washington, DC.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter and the enclosed report will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding this inspection.

Sincerely,

/RA/

Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 050-00295; 050-00304; 07201037 License Nos. DPR-39; DPR-48 Enclosure:

Inspection Report No. 05000295/2014009(DNMS);

05000304/2014009(DNMS); 07201037/2014003(DNMS)

cc w/encl: ZionSolutions, Service List