MONTHYEARML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML23130A1092023-04-20020 April 2023 Submittal of Annual Environmental Operating Report for 2022 ML22119A1242022-04-14014 April 2022 Annual Radiological Environmental Operating Report ML22122A0692022-04-14014 April 2022 Annual Radioactive Effluent Release Report for North Anna Power Station (January 01, 2021 to December 31, 2021) ML22119A1762022-04-12012 April 2022 Annual Environmental Operating Report for 2021 ML21144A1872021-04-26026 April 2021 Radiological Environmental Monitoring Program (January 1, 2020 to December 31, 2020) ML21139A2632021-04-26026 April 2021 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML21139A1232021-04-22022 April 2021 Annual Environmental Operating Report ML20122A1092020-04-20020 April 2020 Annual Environmental Operating Report ML19126A2732019-05-0606 May 2019 Annual Environmental Operating Report ML19126A0942019-04-26026 April 2019 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML18116A4442018-04-16016 April 2018 Submittal of Annual Environmental Operating Report ML17145A3062017-04-27027 April 2017 Independent Spent Fuel Storage Installation (ISFSI) Annual Radiological Environmental Operating Report ML17145A2872017-04-27027 April 2017 Annual Environmental Operating Report ML17145A3042017-04-27027 April 2017 Independent Spent Fuel Storage Installation (Isfsi), Submittal of Annual Radioactive Effluent Release Report ML16117A2792016-04-20020 April 2016 Independent Spent Fuel Storage Installation, Submittal of Annual Radiological Environmental Operating Report ML16111B2022016-04-14014 April 2016 Submittal of Annual Environmental Operating Report ML15117A0622015-04-20020 April 2015 Annual Environmental Operating Report ML15105A0802015-04-10010 April 2015 Independent Spent Fuel Storage Installation (Isfsi), Annual Radioactive Effluent Release Report ML15105A2412015-04-10010 April 2015 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report ML14118A0422014-04-22022 April 2014 Independent Spent Fuel Storage Installation (Isfsi), Submittal of 2013 Annual Radioactive Effluent Release Report ML14118A0372014-04-22022 April 2014 Independent Spent Fuel Storage Installation (Isfsi), Submittal of 2013 Annual Radiological Environmental Operating Report ML13141A4142013-04-22022 April 2013 Independent Spent Fuel Storage Installation - 2012 Annual Radioactive Effluent Release Report ML13114A0562013-04-16016 April 2013 Independent Spent Fuel Storage Installation (Isfsi), Submittal of 2012 Annual Radiological Environmental Operating Report ML13074A9252013-03-11011 March 2013 Flood Hazard Reevaluation Report in Response to March 12, 2012 Information Request Regarding Flooding Aspects of Recommendation 2.1 ML12130A2202012-04-26026 April 2012 2011 Annual Environmental Operating Report ML12125A1252012-04-23023 April 2012 Independent Spent Fuel Storage Installation (ISFSI) - 2011 Annual Radiological Environmental Operating Report ML11130A0212011-04-29029 April 2011 Submittal of Annual Environmental Operating Report ML11123A2152011-04-26026 April 2011 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report for 2010 ML11123A2142011-04-26026 April 2011 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML1036303592010-12-16016 December 2010 Post Accident Monitoring Report ML1012604752010-04-26026 April 2010 Independent Spent Fuel Storage Installation, 2009 Annual Radiological Environmental Operating Report ML1012501532010-04-26026 April 2010 Independent Spent Fuel Storage Installation (Isfsi), Submittal of 2009 Annual Radioactive Effluent Release Report ML1012501472010-04-26026 April 2010 Annual Environmental Operating Report ML0912802742009-04-27027 April 2009 ISFSI - Submittal of 2008 Annual Radioactive Effluent Release Report ML0912703092009-04-27027 April 2009 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report, January 1, 2008 to December 31, 2008 ML0912502952009-04-21021 April 2009 Annual Environmental Operating Report for 2008 ML0812806362008-04-28028 April 2008 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radiological Environmental Operating Report ML0812702002008-04-28028 April 2008 Annual Environment Operating Report for 2007 ML0712300692007-04-25025 April 2007 ISFSI, Annual Radiological Environmental Operating Report for 2006 ML0712101792007-04-24024 April 2007 ISFSI, 2006 Annual Radioactive Effluent Release Report ML0611601262006-04-17017 April 2006 Annual Environmental Operating Report ML0612103912006-04-17017 April 2006 Transmittal of North Anna Units 1 & 2 and Independent Spent Fuel Storage Installation (ISFSI) Annual Radiological Environmental Operating Report for 2005 ML0511802662005-04-20020 April 2005 Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report for 2004 ML0512302922005-04-14014 April 2005 Independent Spent Fuel Storage Installation (ISFSI) - Transmittal of Annual Radioactive Effluent Release Report for 2004 ML0506705202005-03-0808 March 2005 Proposal for Information Collection - North Anna Power Station Submittal for Agency Review and Comments 316(b) Cooling Water Intake Structures, Errata ML0412601692004-04-27027 April 2004 Annual Environmental Operating Report ML0412601912004-04-27027 April 2004 Units I & 2 and Independent Spent Fuel Storage Installation (ISFSI) Annual Radiological Environmental Operating Report 2024-04-18
[Table view] Category:Letter
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 2024-09-24
[Table view] |
Text
.. _'~,
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 27, 2017 United States Nuclear Regulatory Commission Serial No.17-146 Attention: Document Control Desk NAPS/JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT Enclosed is the Annual Environmental Operating Report for North Anna Power Station Units 1 and 2 for 2016, pursuant to Section 5.4.1 of the Technical Specifications, Appendix B - Environmental Protection Plan.
If you have any questions or require additional information, please contact Mr. Donald R. Taylor at (540) 894-2100.
Very truly yours,
'1/f ::, .
N. Larry Lane Site Vice President Enclosure cc: U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector North Anna Power Station
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 APPENDIX B ENVIRONMENTAL PROTECT:CON PLAN 2016 ANNUAL REPORT DOCKET NOS. 50-338 AND 50-339 Page 1 of 4
INTRODUCTION This 2016 Environmental Operating Report for the North Anna Power Station is submitted by Virginia Electric and Power Company as required under Section 5.4.1 of Appendix B, Environmental Protection Plan (EPP) .
The objective of the EPP is to verify that the North Anna Power Station is operated in an environmentally acceptable manner, consistent with NRC and other federal, state and local requirements as well as to keep the NRC informed of any environmental effects of facility construction or operation.
During 2016, no significant adverse environmental impacts occurred as a result of the operation of North Anna Power Station, Units 1 and ,2. Aquatic .issues are addressed in the licensee 1 s VPDES permit (number VA 0052451) issued by the Virginia State Water Control Board. The VPDES permitting program is administered by the Department of Environmental Quality (DEQ) and the NRC relies on this agency for regulation of matters involving water quality and aquatic biota.
- Listed below are the summaries and analyses required by Subsection 4.2 of the EPP.
PLANT DESIGN AND OPERATION (SECTION 3.1)
A review of all changes in s"tation design or operation, tests and experiments did not reveal any potentially, significant, unreviewed, environmental issues.
EROSION CONTROL INSPECTION - SITE (SECTION 4.2.2.1)
Performance of Periodic Test Procedures, 1-PT-9.3: Erosion Control Inspection-Station Site, and 0-PT-75.12: Visual Inspection.of the Service Water Reservoir Dike Crest and Toe, were completed by the Civil/Design Engineering Department. Six (6) areas of concern were identified during the performance of 1-PT-9.3. Two (2) areas of concern were identified during the performance of 0-PT-75.12.
The areas identified in 1-PT-9.3 were minor erosion issues. Three (3) of the areas identified were due to animal burrows near the Independent Spent Fuel Storage Installation (ISFSI) area, Page 2 of 4
Warehouse 5, and the tie-in vault and fabric tank, which needed to be filled in. Two (2) of the areas identified were due to excess gravel, sedimentation, and vegetation build-up in concrete drainage . ditches near the ice house and discharge canal, that needed to be cleaned out. There was one ( 1) issue identified where there was rutting and asphalt deterioration identified near the North Anna Nuclear Information Center (NANIC) , which needed to be repaired. The two (2) areas identified during the performance of 0-PT-75.12 were animal burrows observed near the Service Water Reservoir, *north of the horizontal *drains gallery, which needed to be .filled in.
All of the issues identified were. entered into the station's corrective action system arid work orders were assigned. All of the work that. was. assigned to correct the identified issues was completed by March 31, 2017. All of the issues identified were minor erosion issues that did not adversely impact site erosion control measures, or station operation.
EROSION AND SEDIMENT CONTROL PROGRAM ..: CORRIDOR RIGHTS-OF-WAY SECTION 4~2.2.2)
During 2016 all transmission line rights-of-way were patrolled to
.coordinate brush and tree work needed for maintenance of the lines. This work involved the following:
- North Anna-to-Gordonsville corridor: The patrol revealed that there were some minor vegetation issues. Herbicide applications commenced on August 31, 2016 and.were completed on
- September 6, 2 016. No significant erosion and sedimentation issues were observed.
- North Anna-to-Morrisville corridor: The patrol revealed that there were some minor vegetation issues. Herbicide applications commenced on August 4, 2016 and were completed on August 11, 2016. *No significant erosion and seqimentation issues were observed.
- North Anna to Ladysmith corridor: The patrol did not reveal any vegetation issues that needed work. No significant erosion and sedimentation issues were observed.
- North Anna to Midlothian corridor: The patrol revealed that there were sorrte minor vegetation issues.. Herbicide applications commenced on May 31~ 2016 and were completed on June 8, 2016. No significant erosion and sedimentation issues wer~ observed.
Page 3 of 4
I'~
During all of the above-noted patrols and follow-up observations, no abnormal erosion conditions were observed on any of the above corridors associated with transmission line construction, modification, maintenance activities or the use of herbicides during 2016.
NON-COMPLIANCE (SECTION 5.4.1)
There were no non-compliances with the Environmental Protection Plan during 2016.
NON-ROUTINE REPORTS (SECTION S.4.2)
There was one (1) five day notification letter submitted to the VA DEQ, on December 20, 2016, and one (1) 20-day follow-up letter, submitted to the VA DEQ on January 8, 2017, for the following event:
An unsuccessful pressure test of the 2H redundant underground diesel fuel feed line occurred during the week of December 12, 2016. Prior to this test, all of the other underground diesel fuel feed lines had been pressure tested successfully earlier during the year. A subsequent gas leak test confirmed the presence of a line leak in the vicinity of where the line enters the 2H Emergency Diesel Generator (EDG) room inside the Unit 2 Service Building. A soil remediation vendor began excavation work on December 20, 2016. During the excavation and remediation work, no free diesel product was observed in the soil, ground water was not affected, and there were no discharges of diesel fuel to the lake or Waste Heat Treatment Facility (WHTF).
Affected piping sections were replaced and successfully pressure tested, prior to being placed back into service. The soil excavation I remediation work was completed on January 3, 2017.
Page 4 of 4