MONTHYEARML17164A8451998-10-31031 October 1998 SSES Unit 1 Tenth Refueling & Insp Outage ISI Outage Summary Rept. ML17158A8061995-07-14014 July 1995 Books 1 & 2 of ISI Outage Summary Rept SSES Unit 1 8th Refuel Outage. ML17158A4821994-08-23023 August 1994 ISI Outage Summary Rept Unit 2 6th Refueling Outage, Books 1 & 2 of 2 ML17158A2391994-04-0505 April 1994 Books 1 & 2 of SSES Unit 1 Seventh Refueling & Insp Outage ISI Outage Summary Rept. ML18017A2031993-02-0101 February 1993 Books 1 & 2 of Unit 2 Fifth Refueling & Insp Outage,Isi Outage Summary Rept. ML17157B9331992-07-24024 July 1992 Sixth Refueling & Insp Outage Inservice Insp Outage Summary Rept, Books 1 & 2 ML17157A7671991-07-19019 July 1991 Books 1 & 2 of, Susquehanna Steam Electric Station,Unit 2 Fourth Refueling & Insp Outage Inservice Insp Outage Summary Rept. ML17157A5711991-01-30030 January 1991 Fifth Refueling & Insp Outage Inservice Insp Outage Summary Rept, Books 1 & 2 ML17157A0091990-02-0606 February 1990 Books 1 & 2 to Unit 2 Third Refueling & Insp Outage;Outage Summary Rept. ML20154M5821988-09-23023 September 1988 Inservice Insp Outage Summary Rept for Unit 2 Second Refueling Outage 1988 ML17156A4081988-02-17017 February 1988 Inservice Insp Outage Summary Rept for Unit 1 Third Refueling Outage. ML20212Q2091987-01-31031 January 1987 Inservice Insp Outage Summary Rept for Unit 2 First Refueling Outage ML17146A4951986-08-12012 August 1986 Rev 0 to Component Listing & Inservice Insp 10 Yr Plan. ML18040B1581986-07-20020 July 1986 Inservice Insp Outage Summary Rept for Unit 1 Second Refueling Outage. ML17139D2321985-10-17017 October 1985 Preservice Insp Rept.Exams Performed on Reactor Pressure Vessel 3686 Described ML17146A2581985-09-18018 September 1985 Preservice Insp Rept of Reactor Pressure Vessel & Associated Class 1,2 & 3 Piping & Components from 1983-1984.Request for Relief from Code Requirements Determined to Be Impractical Granted ML17139D2341984-10-12012 October 1984 Rev 8 to Preservice Insp Rept 80A2804 for 1979-1983.Insp of Class 1,2 & 3 Components & Areas Described ML17139A6081982-04-0202 April 1982 PA Power & Light Co Susquehanna Unit 1 Preservice Exam Final Rept. 1998-10-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML17146B1741999-08-0303 August 1999 GL 96-06 Risk Assessment for Sses. ML20206D3331999-04-27027 April 1999 SER of Individual Plant Examination of External Events Submittal on Susquehanna Steam Electric Station,Units 1 & 2. Staff Notes That Licensee IPEEE Complete with Regard to Info Requested by Suppl 4 to GL 88-20 ML20195B2381999-03-31031 March 1999 Redacted Version for 10CFR2.790 Request for Decommissioning Status Rept for Sses,Units 1 & 2 ML17164A8451998-10-31031 October 1998 SSES Unit 1 Tenth Refueling & Insp Outage ISI Outage Summary Rept. ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20217Q4891998-04-21021 April 1998 Rev 1 to Draft LDCN 2482, FSAR Chapter 13.4 & FSAR Chapter 17.2 Changes to Support ITS Implementation ML18026A4931998-03-30030 March 1998 LER 97-007-01:on 971017,entry Into TS 3.0.3 Occurred to Allow Completion of Surveillance Testing of One Channel of Rbm.Caused by Failure of Components in LPRM Output to Rbm. Submitted TS Change Request to Extend LCO Action Statement ML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18026A4891997-11-17017 November 1997 LER 97-007-00:on 971017,TS 3.0.3 Entry Voluntarily Made. Caused by Inadequate Post Maint Testing Following Earlier Work Associated W/Components.Failed Components Repaired, Replaced & Testing Completed ML18017A2921997-10-28028 October 1997 1997 Nrc/Fema Observed Exercise. ML17158C1861997-06-0505 June 1997 Proceedings of Intl Topical Meeting on Advanced Reactors Safety Vol II, on 970601-05 ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML18026A4781997-03-28028 March 1997 Rev 1 to Application of Anfb to ATRIUM-10 for Susquehanna Reloads. ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20155F7661996-07-25025 July 1996 Partially Deleted Job Number 739619-96, Investigation of E Diesel Breaker Misalignment ML20155F7491996-07-24024 July 1996 Independent Safety Evaluation Svcs Project Rept 3-96, Investigation of E Diesel Generator In-Operability Event ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML18026A5961996-01-0202 January 1996 LER 95-013-00:on 951119,thermally Induced Pressure Locking of HPCI Valve Occurred Under Bonnet Pressure of 3,000-7,000 Psig.Damaged HPCI Injection Valve repaired.W/960102 Ltr ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17158A8771995-08-15015 August 1995 Exercise Manual. ML17158A8061995-07-14014 July 1995 Books 1 & 2 of ISI Outage Summary Rept SSES Unit 1 8th Refuel Outage. ML18017A0461995-07-0707 July 1995 LER 95-008-00:on 950609,shift Average Licensed Core Thermal Power Was Exceeded.Caused by Failed Instrumentation Drift. Repaired & Recalibrated Subject Instrumentation ML17164A6631995-04-11011 April 1995 Impact of Extending T-10 AOT from 3 to 7 Days. ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML18026A5351994-10-31031 October 1994 SSES Unit 1 & 2 MSIV Leakage Alternate Treatment Method Seismic Evaluation. W/One Oversize Drawing ML17158A4821994-08-23023 August 1994 ISI Outage Summary Rept Unit 2 6th Refueling Outage, Books 1 & 2 of 2 ML17158A2391994-04-0505 April 1994 Books 1 & 2 of SSES Unit 1 Seventh Refueling & Insp Outage ISI Outage Summary Rept. ML18017A2701993-12-31031 December 1993 PP&L Annual Rept 1993. ML17158A2651993-12-31031 December 1993 Allegheny Electric Cooperative,Inc Annual Rept 1993. ML17158A1631993-12-0909 December 1993 Remote Indication of Spent Fuel Pool Level & Temperature. ML18026A4281993-08-16016 August 1993 PP&L Response to NRC Concerns Re Loss of Spent Fuel Pool Cooling Following Loca,Sses,Units 1 & 2. ML18026A4261993-06-0909 June 1993 LER 90-007-01:on 900705,primary Power Supply to RPS a Power Distribution Panel Lost When One Electrical Protection Assembly (EPA) Breaker Tripped.Epa Logic Cards Reviewed & RPS Power Supply Will Be redesigned.W/930609 Ltr ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML18017A2031993-02-0101 February 1993 Books 1 & 2 of Unit 2 Fifth Refueling & Insp Outage,Isi Outage Summary Rept. ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions ML17157C3691992-12-31031 December 1992 PP&L Annual Rept 1992. ML20056C3941992-12-31031 December 1992 Allegheny Electric Cooperative,Inc Annual Rept 1992 ML18017A0421992-12-14014 December 1992 Suppl to 921127 Part 21 Rept Re High Air Concentration in Reactor Bldg Making Area Uninhabitable for Retrieving Air Filters,Per NUREG-0737,Item II.F.1.Util Current Position Re Fuel Pool Cooling Issues Contrary to Reg Guide 1.3 ML18026A2481992-11-27027 November 1992 Part 21 Rept Re Substantial Safety Hazard in Design of Facility for Loss of Normal Spent Fuel Pool Cooling ML18026A4231992-11-17017 November 1992 LER 92-016-00:on 920416,discovered That Existing Analysis for Two Spent Fuel Storage Pools Did Not Reflect Current Fuel Design & Plant Operation.Caused by Failure to Modify FSAR Analysis.Fsar Will Be revised.W/921117 Ltr ML17157C1421992-10-21021 October 1992 Engineering Assessment of Fuel Pool Cooling Piping EDR-G20020. ML17157C1411992-08-31031 August 1992 Loss of Fuel Pool Cooling Event Evaluation. ML17157C1401992-08-31031 August 1992 Review of Fuel Pool Cooling During Postulated Off-Normal & Accident Events SSES Units 1 & 2. ML20082C4941992-08-14014 August 1992 Evaluation of Unit 1 & Unit 2 Derating of Power Cables in Raceways Wrapped W/Thermo-Lag Matl ML17157C1381992-07-27027 July 1992 Safety Consequences of Boiling Spent Fuel Pool at Susquehanna Steam Electric Station. ML17157B9331992-07-24024 July 1992 Sixth Refueling & Insp Outage Inservice Insp Outage Summary Rept, Books 1 & 2 ML20097D4681991-12-31031 December 1991 Pennsylvania Power & Light Company,1991 Annual Rept ML18017A0391991-07-26026 July 1991 LER 91-010-00:on 910628,RWCU Isolated on Two Occassions Due to Actuations of Steam Leak Detection Instrumentation. Caused by Design Deficiency & Elevated Ambient Penetration Room Temps.Temp Modules replaced.W/910726 Ltr 1999-09-30
[Table view] |
Text
Page 1 of 4 FORM NIS-I OWNERS'ATA REPORT FOR 'PRESERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules PENNSYLVANIA POWER AND LIGHT CO.
- 1. Owner 0 NORTH NINTH STREET ALLENTOWN PA 18101 SUSQUEHANNA STERYLE8~8 RAVJtM, UNIT II2
~
- 2. Plant P.O. BOX 467, BERWICK, PA 18603 (Name and Address of Plant) 3 Plant Unit I/2 4. Owner Certificate of Authorization (if required) N/A Construction Permit Date 6. Nationai Board Number for Unit N A
- 7. ComPonents lnsPccted (See Pages 2 3 of 4)
Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.
Reactor
- Pressure Vess l CB&I General Electric B5023 B111231 //3687 2S-4OI Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is SVi in. x 11 in.,
(2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
This form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y. 10017 8'DR 860i280i96 860i22 PDR ADQCK 05000388
FORM NIS-1 (back)
- 8. Examination Dates ipEE to EE 9. Inspection Interval from N~A to N/A
- 10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. (See Pages 3 4 p f 4)
- 11. Abstract of Conditions Noted. (See Pages 39 4 of 4)
- 12. Abstractof CorrectiveMeasures Recommended and Taken (See Pageos 39 4 o~ 4)
We certify that the statements made in this rcport are correct and the examinations and corrective mea-sures taken conform to the rules of thc ASME Code,Section XI.
Date Ml Z5 19 ~+ Signed cR By Owner Certificate of Authorization No. (if applicable) Expiration Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler pnMressure Vessel Plklr A. hh ce of has performed examinations and taken corrective measures described in this Owners'ata Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither thc Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners'ata Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage Date 19 ~
or a loss of any kind arising from or connected with this inspection.
PT l 8 Commissions~
I'Acttfgy hhuTuht- SYST<~
Inspect s Signature National Board, State, Province and No.
Page 2 of 4 FORM NIS - 1 OWNER: Pennsylvania Power & Light Co. (PP&L) 2 North Ninth Street Allentown, PA 18101 PLANT: Susquehanna Steam Electric Station (SSES) Unit 82 P.O. Box 467, Berwick, PA 18603 Preservice examinations were performed on the Susquehanna Steam Electric Station, Unit 82 Reactor Pressure Vessel and Associated Class 1, 2 and 3 piping and components from 1983 to 1984. These examinations comply with the applicable requirements set forth in 10CFR50 and Section XI of the ASME Boiler and Pressure Vessel Code. The applicable editions and addenda, as utilized by PP&L are as outlined below:
Reactor Pressure Vessel ASME Section XI 1974 Edition to the Winter 1975 Addenda.
Pi in and Com onents ASME Section XI 1974 Edition to the Summer 1975 Addenda, including Appendix III from the Winter 1975 Addenda, as modified to include ASME Section XI 1977 Edition to the Summer 1978 Addenda to determine the extent and method of examination for Code Categories BG-l, BG-2, BK-1, CC, CD and CE-l.
COMPONENTS INSPECTED The required preservice examinations have been performed on components (including supports) within the following systems'.
SYSTEM INSTALLER* N5 SYSTEM NUMBER Containment Atmosphere Bechtel Power Corporation 2-73A Control Control Rod Drive Bechtel Power Corporation 2-55B Core Spray Bechtel Power Corporation 2-51A Diesel Generators Bechtel Power Corporation 0-24A Emergency Service Water Bechtel Power Corporation 0-54A Feedwater Bechtel Power Corporation 2-45A Fuel Pool Cooling and Bechtel Power Corporation 2-35B Clean Up High Pressure Core Bechtel Power Corporation 2-52BIC Injection
i P ~
Page 3 of 4 FORM NIS - 1 OWNER: Pennsylvania Power & Light Co. (PP&L) 2 North Ninth Street Allentown, PA 18101 PLANT: Susquehanna Steam Electric Station (SSES) Unit 82 P.O. Box 467, Berwick, PA 18603 COMPONENTS INSPECTED (Continued)
SYSTEM INSTALLERA N5 SYSTEM NUMBER Main Steam Bechtel Power Corporation 2-83A,B,D, MSIV Leakage Control Bechtel Power Corporation 2-83H Nuclear Boiler Bechtel Power Corporation 2-62A Reactor Building Bechtel Power Corporation 2-14A Closed Cooling Water Reactor Core Bechtel Power Corporation 2-50B,C Isolation Cooling Reactor Pressure Bechtel Power Corporation 2-62A Vessel Reactor Recirculation Bechtel Power Corporation 2-64A,B Reactor Water Clean-Up Bechtel Power Corporation 2-61B Residual Heat Removal Bechtel Power Corporation 2-49A,B,D,E,F,G RHR Service Water Becht el Power Corporati on 2-16A Standby Liquid Control Bechtel Power Corporation 2-53A
- Bechtel Power Corporation Certificate of Authorization N881-2 ABSTRACT OF EXAMINATIONS Portions of the following listed documents form a part of this report, and are found as Appendix I and II, respectively; I. Pre-service Examination Final Report of Reactor Pressure Vessel, National Board Number 3687, Susquehanna Steam Electric Station, Unit 2, Pennsylvania Power and Light Company, Contract Number 8856-M-166, prepared by General Electric Company, A&ESO (formally l&SE)
II. Susquehanna Steam Electric Station, Unit No. 1, Preservice Inspection Final Report, prepared by Nuclear Energy Services, Document 880A4758, Revision 6.
I .
~
f
Page 4 of 4 FORM NIS - 1 OWNER: Pennsylvania Power & Light Co. (PP&L) 2 North Ninth Street Allentown, PA 18101 PLANT: Susquehanna Steam Electric S'tation (SSES) Unit 82 P.O. Box 467, Berwick, PA 18603 These documents contain a 'complete listing of all the affected systems and individual components inspected. Details of examinations performed and results are also provided.
RELIEF RE UESTS Pursuant to 10CFR Part 50, Section 50.55a(a)(2), the Nuclear Regulatory Commission has granted, at PP&L's request, relief from Code Requirements that have been determined to be impractical [such that implementation would result [,
in hardship or unusual difficulty without a compensating increase in the level..
of quality and safety].
Supporting documentation relative to the SSES Unit 82 relief requests is found in Appendix III.
REPAIRS, REPLACEMENTS, AND MODIFICATIONS Attached as Appendix IV to this document are the Owner's "Report of Repairs and/or Modifications" (used prior to the availability of the NIS-2 Form) and Form-NIS-2 Owner's Report for Repairs or Replacements for ASME Code Section XI Repairs and Replacements on Unit 82.