Page 1 of 4 FORM NIS-I OWNERS'ATA REPORT FOR

'PRESERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner
2. Plant PENNSYLVANIA POWER AND LIGHT CO.

0 NORTH NINTH STREET ALLENTOWN PA 18101 SUSQUEHANNA STERYLE8~8 RAVJtM, UNIT II2 P.O.

BOX 467, BERWICK, PA 18603 (Name and Address of Plant)

4. Owner Certificate of Authorization (ifrequired)

N/A 3

Plant Unit I/2 Construction Permit N A Date~ 6. Nationai Board Number for Unit

7. ComPonents lnsPccted (See Pages 2

3 of 4)

Component or Appurtenance Reactor Pressure Vess Manufacturer or Installer l CB&I General Electric Manufacturer or Installer Serial No.

B5023 State or Province No.

B111231 National Board No.

//3687 2S-4OI Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is SVi in. x 11 in.,

(2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

This form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y.

10017 860i280i96 860i22 PDR ADQCK 05000388 8'DR

FORM NIS-1 (back)

8. Examination Dates ipEE to EE
9. Inspection Interval from N~A to N/A
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.

(See Pages 3

4 pf 4)

11. Abstract of Conditions Noted.

(See Pages 39 4 of 4)

12. Abstractof CorrectiveMeasures Recommended and Taken (See Pageos 39 4 o~ 4)

We certify that the statements made in this rcport are correct and the examinations and corrective mea-sures taken conform to the rules of thc ASME Code,Section XI.

Date Ml Z5 19 ~+

Signed cR Owner By Certificate of Authorization No. (ifapplicable)

Expiration Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler pnMressure Vessel Plklr A. hh ce of has performed examinations and taken corrective measures described in this Owners'ata Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither thc Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners'ata Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date PT l8 19~

I'Acttfgy hhuTuht-SYST<~

Commissions~

National Board, State, Province and No.

Inspect s Signature

FORM NIS -

1 Page 2 of 4 OWNER:

Pennsylvania Power

& Light Co.

(PP&L) 2 North Ninth Street Allentown, PA 18101 PLANT:

Susquehanna Steam Electric Station (SSES) Unit 82 P.O.

Box 467, Berwick, PA 18603 Preservice examinations were performed on the Susquehanna Steam Electric Station, Unit 82 Reactor Pressure Vessel and Associated Class 1,

2 and 3

piping and components from 1983 to 1984.

These examinations comply with the applicable requirements set forth in 10CFR50 and Section XI of the ASME Boiler and Pressure Vessel Code.

The applicable editions and addenda, as utilized by PP&L are as outlined below:

Reactor Pressure Vessel ASME Section XI 1974 Edition to the Winter 1975 Addenda.

Pi in and Com onents ASME Section XI 1974 Edition to the Summer 1975 Addenda, including Appendix III from the Winter 1975 Addenda, as modified to include ASME Section XI 1977 Edition to the Summer 1978 Addenda to determine the extent and method of examination for Code Categories BG-l, BG-2, BK-1, CC, CD and CE-l.

COMPONENTS INSPECTED The required preservice examinations have been performed on components (including supports) within the following systems'.

SYSTEM Containment Atmosphere Control INSTALLER*

Bechtel Power Corporation N5 SYSTEM NUMBER 2-73A Control Rod Drive Core Spray Diesel Generators Emergency Service Water Feedwater Fuel Pool Cooling and Clean Up Bechtel Power Corporation Bechtel Power Corporation Bechtel Power Corporation Bechtel Power Corporation Bechtel Power Corporation Bechtel Power Corporation 2-55B 2-51A 0-24A 0-54A 2-45A 2-35B High Pressure Core Injection Bechtel Power Corporation 2-52BIC

i P

~

FORM NIS -

1 Page 3 of 4 OWNER:

Pennsylvania Power

& Light Co.

(PP&L) 2 North Ninth Street Allentown, PA 18101 PLANT:

Susquehanna Steam Electric Station (SSES) Unit 82 P.O.

Box 467, Berwick, PA 18603 COMPONENTS INSPECTED (Continued)

SYSTEM INSTALLERA N5 SYSTEM NUMBER Main Steam MSIV Leakage Control Nuclear Boiler Reactor Building Closed Cooling Water Bechtel Power Corporation Bechtel Power Corporation Bechtel Power Corporation Bechtel Power Corporation 2-83A,B,D, 2-83H 2-62A 2-14A Reactor Core Isolation Cooling Bechtel Power Corporation 2-50B,C Reactor Pressure Vessel Bechtel Power Corporation 2-62A Reactor Recirculation Bechtel Power Corporation Reactor Water Clean-Up Bechtel Power Corporation Residual Heat Removal Bechtel Power Corporation 2-64A,B 2-61B 2-49A,B,D,E,F,G RHR Service Water Becht el Power Corporati on Standby Liquid Control Bechtel Power Corporation 2-16A 2-53A

  • Bechtel Power Corporation Certificate of Authorization N881-2 ABSTRACT OF EXAMINATIONS Portions of the following listed documents form a part of this report, and are found as Appendix I and II, respectively; I.

Pre-service Examination Final Report of Reactor Pressure Vessel, National Board Number 3687, Susquehanna Steam Electric Station, Unit 2, Pennsylvania Power and Light Company, Contract Number 8856-M-166, prepared by General Electric Company, A&ESO (formally l&SE)

II.

Susquehanna Steam Electric Station, Unit No.

1, Preservice Inspection Final Report, prepared by Nuclear Energy Services, Document

880A4758, Revision 6.

I

~

f

FORM NIS -

1 Page 4 of 4 OWNER:

Pennsylvania Power

& Light Co.

(PP&L) 2 North Ninth Street Allentown, PA 18101 PLANT:

Susquehanna Steam Electric S'tation (SSES) Unit 82 P.O.

Box 467, Berwick, PA 18603 These documents contain a 'complete listing of all the affected systems and individual components inspected.

Details of examinations performed and results are also provided.

RELIEF RE UESTS Pursuant to 10CFR Part 50, Section 50.55a(a)(2),

the Nuclear Regulatory Commission has granted, at PP&L's request, relief from Code Requirements that have been determined to be impractical [such that implementation would result [,

in hardship or unusual difficultywithout a compensating increase in the level..

of quality and safety].

Supporting documentation relative to the SSES Unit 82 relief requests is found in Appendix III.

REPAIRS, REPLACEMENTS, AND MODIFICATIONS Attached as Appendix IV to this document are the Owner's "Report of Repairs and/or Modifications" (used prior to the availability of the NIS-2 Form) and Form-NIS-2 Owner's Report for Repairs or Replacements for ASME Code Section XI Repairs and Replacements on Unit 82.

mts/rpg037i: del

C