Notification of Licensed Operator Initial Examination 05000269/2018301, 05000270/2018301 and 05000287/2018301
ML17324B346
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/16/2017
From: Gerald Mccoy
Division of Reactor Safety II
To: Teresa Ray
Duke Energy Carolinas
References
50-269/18-301, 50-270/18-301, 50-287/18-301
Download: ML17324B346 (4)


See also: IR 05000269/2018301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

November 16, 2017

Thomas D. (Tom) Ray

Vice President, Oconee Nuclear Station

Duke Energy Carolinas, LLC

7800 Rochester Highway

Seneca, SC 29672-0752

SUBJECT: OCONEE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION 05000269/2018301, 05000270/2018301 AND

05000287/2018301

Dear Mr. Ray:

In a telephone conversation on November 6, 2017, between Mr. Scott Bowen, Operations Exam

Writer, Mr. Sam Lark, NRC Exam Author and Mr. Phillip G. Capehart, Senior Operations

Engineer, arrangements were made for the administration of licensing examinations at the

Oconee Nuclear Station. The operating test is scheduled to be administered during the week of

June 4, 2018. The written examination is scheduled to be administered the week of June 20,

2018. The on-site preparatory week is scheduled for the week of April 30, 2018.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examinations based on the guidelines in Revision 11, of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outlines by January 5, 2018. I provided written examination outlines to your staff in September

2017. The written examinations, operating test and the supporting reference materials identified

in Attachment 3 to ES-201 will be due by March 21, 2018. Pursuant to Title 10, Section

55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the examinations, and test before they are

submitted to the NRC for review and approval. All materials shall be complete and ready-to-

use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

T. Ray 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator waiver or excusal requests (if any) (Office of Management

and Budget (OMB) approval number 3150-0090), at least 60 days before the first examination

date (if possible). Contact Mr. Capehart to determine the method for submission of waiver or

excusal requests. Preliminary reactor operator and senior reactor operator license applications

(OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024)

should be submitted at least 30 days before the first examination date. If the preliminary

applications are not received at least 30 days before the examination date, a postponement

may be necessary. Final signed applications certifying that all training has been completed and

requesting any waivers or excusals, as applicable, should be submitted at least 14 days before

the first examination date.

Although the guideline for receiving waiver or excusal requests calls for at least 30 days before

the first examination date (preliminary) and 14 days before the first examination date (final), the

requests should be submitted as early as possible in the process (see the 60-day guideline

above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.

Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form

398, Personal Qualifications Statement - Licensee, or as directed by Mr. Capehart when

contacting him to determine the method for submission). The NRC will document its final

decision on whether to grant a waiver or excusal on the final (not preliminary) NRC form 398

submitted for the applicant. The NRC will not provide its decision until the final application is

submitted to the agency.

Paperwork Reduction Act Statement

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018.

The burden to the public for these voluntary information collections is estimated to average

2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per response, including the time for reviewing instructions, searching existing data

sources, gathering and maintaining the data needed, and completing and reviewing the

information collections. You may submit comments on any aspect of the information collections,

including suggestions for reducing the burden, to FOIA, Privacy and Information Collections

Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

T. Ray 3

Public Protection Notification

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available

electronically for public inspection in the NRC Public Document Room or from the Publicly

Available Records (PARS) component of the NRCs Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Website at

http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Scott Bowen has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Phillip G. Capehart at (404) 997-4483, (Internet E-

mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail:

Gerald.McCoy@nrc.gov)

Sincerely,

/RA/

Gerald J. McCoy, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-269, 50-270, 50-287

License Nos.: DPR-38, DPR-47, DPR-55

cc: Distribution via Listserv

___ _____________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE PGC1 EMAIL GJM1

NAME PCAPEHART GMCCOY

DATE 11/ 16/2017 11/ 16 /2017

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO