Application to Amend Licenses DPR-32 & DPR-37,clarifying Term Operable, Submitted as Proposed Tech Spec Change 86, in Response to NRC 800410 Ltr.Certificate of Svc Encl
ML18139A313
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/16/1980
From: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139A314 List:
References
NUDOCS 8006130297
Download: ML18139A313 (3)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGINIA 23261 May 16, 1980 Mr. Harold R. Denton, Director Serial No. 446 Office of Nuclear Reactor Regulation LQA/WRM:rab Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Docket Nos. 50-280 Division of Licensing 50-281 U. s. Nuclear Regulatory Commission License Nos. DPR-32 Washington, D.C. 20555 DPR-37

Dear Mr. Denton:

AMENDMENT TO OPERATING LICENSES SURRY POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE NO. 86 Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company hereby requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for the Surry Power Station, Unit Nos. 1 and 2. The proposed changes are enclosed and have been designated Change No. 86.

In a letter from Mr. D. G. Eisenhut dated April 10, 1980, we were requested to submit proposed changes to the Technical Specifications for Surry Unit No. 1 and No. 2 which would clarify the definition of the term operable as it applies to the single failure criterion for reactor safety systems. In accordance with the request, the enclosed proposed changes clarify the meaning of operability in the Surry Technical Specifi-cations.

Specification 1.0-D has been modified to more clearly define operability for a system or component. This clarification includes the implied assumption that for a system or component to be operable, all the supporting systems must be operable and the component or system must be capable of performing its function.

Two additional Limiting Conditions for Operation, Specifications 3 .* 0.1 and 3.0.2, have been proposed. Specification 3.0.1 defines the action to be implemented for events not provided for in the Limiting Con-ditions for Operation and whose occurrence would violate the intent of the Specification. A Basis for Specification 3.0.1 has been provided.

Specification 3.0.2 defines what additional conditions must be satisfied for continued operation. This Specification permits the action statements associated with individual systems or components to be consistent with the action statements of the associated power source. A Basis for ~0\

Specification 3.0.2 has been provided.

t\Y

~1~

e VIRGINIA ELECTRIC AND POWER COMPANY TO Mr. Harold R. Denton 2 The Surry Technical Specifications are not in the format of the Standardized Technical Specifications; therefore, a number of other Specifications require minor clarifying changes. These changes are listed in the Tabulation of Changes enclosed in the attachments.

These proposed changes have been reviewed and approved by the Station Nuclear Safety and Operating Committee and the System Nuclear Safety and Operating Committee. It has been determined that this request does not involve an unreviewed safety question.

This request has been reviewed in accordance with the criteria in 10 CFR 170.22. Since this request is in response to NRC recommendations and simply provides additional clarification of the existing Specifications, the request is administrative in nature; therefore, a Class II license amendment fee is required for Unit 1 and a Class I license amendment fee is required for Unit 2. Accordingly, a voucher check in the amount of

$1,600.00 is enclosed in payment of the required fees.

Very truly yours,

-~~

J. H. Ferguson Executive Vice President-Power Attachments:

1. - Tabulation of Changes
2. Proposed Technical Specification Change No. 86
3. Voucher Check No. 18768 for $1,600.00 cc: Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II

e COMMONWEALTH OF VIRGINIA )

) s. s.

CITY OF RICHMOND )

Before me, a Notary Public, in and for the City and Common-wealth aforesaid, today personally appeared J. H. Ferguson, who being duly sworn, made oath and said (1) that he is Executive Vice President-Power of the Virginia Electric and Power Company, (2) that he is duly authorized to execute and*file the foregoing Amendment in behalf of that Company, and (3) that the statements in the .Amendment are true to the best of his knowledge and belief.

(Y\ Given under my hand and notarial seal this \b1':l day of

~O\~ ' ,~80.

My Commission expires --~-0.-"-'-Q. . .U=O.,..___t .a;,_.Q. ....(.. .,) ~ 5=---f--

0

.....\........

1

~ Notary Public (SEAL)