ML18219C418

From kanterella
Revision as of 18:48, 20 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Response to IE Bulletin 76-04A, Provide Information Re Schedule for Accomplishment of Revision to Policies & Procedures, & Summary Reports Detailing Monthly Progress
ML18219C418
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/27/1976
From: Dolan J
American Electric Power Service Corp
To: James Keppler
NRC/RGN-III
References
IEB-75-004A
Download: ML18219C418 (6)


Text

ACTION ROUTING AND TRANSMITTAL SLIP TO (Nome, olllce Tymool or locellonJ IHITIAIS C I 0 C V IA1T.

IE Chief, FSOB IE Chief, FCLEB DA1C COORDIHATIOH IE:Hq(4) 11cens>ng INI TI AID r I IC D I 1 Files J. Rizzo, ONIPC OAT C INPORMATION CD Poslusny, PSB INI1 I AID ROTC AHD RCIVRN Region II PDR PATE'N PCR COH VCRSATIOH

~

Local PDR l 1 I*IS SCC MC TIC OGC, Bethr,. P-506A DATC SICHATVRC R. Callen REMARKS AMERICAN ELECTRIC POWER SERVICE CORPORATION INDIANA AND MICHIGAN POWER COMPANY D. C. COOK NUCLEAR POWER PLANT - UNIT 0' DOCKET NUMBER 50-315 Attached is a copy of licensee's reply dated Nay 27, 1976, to IE Bulletin 76-04A.

Do NOT usc this form as a RECORD of approvals, concurrcnccs, disapprovals, clcaranccs, and similar actions FROM fNome, olllce sym4ol or locsrlon) VATC G. Fiorelli, IE: III PHON C OPTIOMAL FOAM 4l MS IS Sl&OI-I &&2 IO& oro SO& 1- lo l AUGUST TOST CSA rrPMA 1 Atcl A) 100 11.200

AMERICAN EL,ECTRIC POWER 5 e i vice C o I p 0 rII, li 0 n

'road>cay, Nero York, K )'. IOOOI (DID) iI2o.cI000 JOIIII E DOI,AX Senior I;zccutioc 17cc Prcskicni May 27, 1976 Iinginccring 4 Consrrncrion Donald C. Cook Nuclear Plant; Docket No. 50>>315 DPR No. $8 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement; Region III Roosevelt Road 799 Glen Ellyn, Illinois 60137 Attention: Hr. Z. G. Ke ler Re ional Director Gentlemen:

Item 6 of IE Bulletin 75-04A requires a schedule for accomplishment of any revision to our policies and procedures and any proposed changes to the facility, to assure that consideration for alternate methods for accomplishing an orderly plant shutdoirn and cooldown are provided in case of loss of normal and preferred alternate shutdown and cooldown systems at the Donald C. Cook Nuclear Plant, Our letter to you dated June 27, 1975 provided this schedule.

In addition, Item 6 requests summary reports detailing our monthly progress. This letter is the eleventh such monthly report.

During the recently completed scheduled outage of the Donald C. Cook Nuclear Plant Unit 1 the changes to air operated valves air supply lines, required for local control of shutdown of the unit, were completed.

The start of fabrication of the local shutdown instrumentation panels by our vendor has been delayed due to a labor strike at their facilities. tfe have been informed that resolution is expected shortly. Shipment of the panels is expected in ten to twelve weeks following the Oicr A'atioic's 200Iic Fear 'g 976 Our Ccsmyucnif'v 70Iic )'ear

Mr. Z. G. Keppler . May 27, 1976 start of fabrication.

These panels are still to be installed at the first extensive outage folloving their arrival on site.

Very truly yours,

e. r-.7 ~6 ohn E. Dolan Senior 'xecutive Vice President Engineering R Construction ZED:mam cco G~ Charnoff R. C. Callen P ~ N. Steketee R. Malsh R. Z. Vollen R. N. Zurgensen - Bridgman R. S. Hunter

)