ML19257A275
From kanterella
Revision as of 09:47, 18 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML19257A275 | |
Person / Time | |
---|---|
Site: | Three Mile Island |
Issue date: | 01/03/1979 |
From: | JERSEY CENTRAL POWER & LIGHT CO. |
To: | |
References | |
NUDOCS 8001030521 | |
Download: ML19257A275 (1) | |
Similar Documents at Three Mile Island | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211M6651999-09-0101 September 1999
[Table view]Errata Page 4-45,reflecting Proposed Changes Requested in ML20211D1551999-08-20020 August 1999 Proposed Tech Specs Pages,Revising Degraded Voltage Relay as-left Setpoint Tolerances ML20210S7691999-08-12012 August 1999 Rev 10 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual ML20210J1261999-07-29029 July 1999 Proposed Tech Specs Revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance TSs ML20195E6201999-06-0404 June 1999 Proposed Tech Specs,Modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20206R1171999-05-13013 May 1999 Proposed Tech Specs Section 3.1.1,incorporating Administrative Updating & Changing Bases Statement ML20206R6531999-05-13013 May 1999 Rev 39 to TMI Modified Amended Physical Security Plan ML20205H0781999-04-0101 April 1999 Proposed Tech Specs Adding LCO Action Statements,Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20204B5291999-03-12012 March 1999 Rev 9 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual (Edcm) ML20203B0511999-02-0202 February 1999 Proposed Tech Specs Expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems Outside of Containment ML20196G4861998-12-0303 December 1998 Non-proprietary Proposed Tech Specs,Consenting to Transfer & Authorization for Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License ML20196H5361998-12-0303 December 1998 Proposed Tech Specs Reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196F8661998-11-25025 November 1998 Proposed Tech Specs Revised Pages for TS Change 277 Changing Surveillances Specs for OTSG ISI for TMI Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only. with Certificate of Svc ML20154P8661998-10-19019 October 1998 Proposed Tech Specs,Providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage ML20154Q6271998-10-19019 October 1998 Proposed Tech Specs Adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18 ML20154D5491998-10-0101 October 1998 Cancellation Notification of Temporary Change Notice 1-98-0066 to Procedure 6610-PLN-4200.02 ML20206C0911998-09-0101 September 1998 Rev 17 to Odcm ML20249B2421998-06-11011 June 1998 Proposed Tech Specs Re Alternate High Radiation Area Control ML20216E9751998-04-13013 April 1998 Emergency Dose Assessment Users Manual, for Insertion Into Rev 7 of Edcm ML20216E9491998-04-0909 April 1998 Rev 7,Temporary Change Notice 1-98-003 to 6610-PLN-4200.02, Edcm, Changing Pages 2 & 57 & Adding New Emergency Dose Assessment Users Manual ML20217J8201998-03-25025 March 1998 Proposed Tech Specs Page 6-1,reflecting Change in Trade Name of Owners & Operator of TMI-1 & Correcting Typo ML20217E5311998-03-23023 March 1998 Proposed Tech Specs Pages for Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 EFPY ML20202B2061998-01-30030 January 1998 Rev 7,Temporary Change Notice 1-98-0013 to 6610-PLN-4200.02, Edcm ML20198T4721997-12-31031 December 1997 TMI-1 Cycle 12 Startup Rept ML20217G0201997-10-0303 October 1997 Proposed Tech Specs Re Revised Pages 4-80 & 4-81 Previously Submitted ML20211F3781997-09-24024 September 1997 Proposed Tech Specs Revising Steam Line Break Accident Dose Consequence ML20211C2431997-09-19019 September 1997 Proposed Tech Specs Re Decay Heat Removal Sys Leakage ML20211C3421997-09-19019 September 1997 Proposed Tech Specs Pages 3.8-3.9b to TS Section 3.1.4 Providing More Restrictive Limit of 0.35 Uci/Gram Dose Equivalent I-131 & Clarifying UFSAR Analysis ML20210K0011997-08-14014 August 1997 Proposed Tech Specs Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J4051997-08-12012 August 1997 Proposed Tech Specs Revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operation ML20198E7941997-07-30030 July 1997 Proposed Tech Specs Incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 Nor Considered in TMI-1 UFSAR DBA Analysis Dose Calculations for 2568 Mwt ML20151K2071997-07-25025 July 1997 Revised TS Page 6-19 Replacing Corresponding Page Contained in 970508 Transmittal of TS Change Request 264 ML20217M7251997-06-22022 June 1997 Rev 16 to Procedure 6610-PLN-4200.01, Odcm ML20141E1491997-05-0808 May 1997 Proposed Tech Specs,Consisting of Change Request 264, Incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2471997-04-21021 April 1997 Proposed Tech Specs 3.3.1.2,changing Required Borated Water in Each Core Flood Tank to 940 ft,4.5.2.1.b,lowering Surveillance Acceptance Criteria for ECCS HPI Flow to 431 Gpm & 3.3.1.1.f Re Operability of Decay Heat Valves ML20134M1211997-02-0707 February 1997 Proposed Tech Specs,Incorporating Certain Improvements from Revised STS for B&W plants,NUREG-1430 ML20133D2821996-12-24024 December 1996 Proposed Tech Specs 3.15.3 Re Auxiliary & Fuel Handling Bldg Air Treatment Sys ML20132F3301996-12-16016 December 1996 Proposed Tech Specs,Reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135D0991996-12-0303 December 1996 Proposed Tech Specs Incorporating Certain Requirements from Revised B&W Std TS,NUREG-1430 ML20135C5321996-12-0202 December 1996 Proposed Tech Specs Re Relocation of Audit Frequency Requirements ML20128H4121996-10-0303 October 1996 Errata to Proposed Ts,Adding Revised Table of Contents & Making Minor Editorial Corrections ML20117H0451996-08-29029 August 1996 Proposed Tech Specs,Consisting of Change Request 257, Incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1971996-06-28028 June 1996 Proposed Tech Specs,Consisting of Change Request 259, Allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8791996-05-24024 May 1996 Proposed Tech Specs Re Pages for App A.Certificate of Svc Encl ML20138B4641996-05-0606 May 1996 Rev 14 to Procedure 6610-PLN-4200.01, Odcm ML20101R1571996-04-10010 April 1996 Proposed Tech Specs,Revising Addl Group of Surveillances in Which Justification Has Been Completed ML20100J6931996-02-22022 February 1996 Proposed Tech Specs,Consisting of Change Request 254, Revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Battery Cell Parameters Not Met ML20096F0521995-12-31031 December 1995 TMI-1 Cycle 11,Startup Rept ML20095J2311995-12-21021 December 1995 Proposed Tech Specs,Raising Low Voltage Action Level to 105 Volts DC ML20092M1941995-09-21021 September 1995 TMI-1 Pump & Valve IST Program 1999-09-01 Category:TEST REPORT MONTHYEARML20198T4721997-12-31031 December 1997
[Table view]TMI-1 Cycle 12 Startup Rept ML20096F0521995-12-31031 December 1995 TMI-1 Cycle 11,Startup Rept ML20063A4001993-12-31031 December 1993 TMI-1 Cycle 10 Startup Rept ML20058P0041993-09-30030 September 1993 Reactor Containment Bldg ILRT Rept ML20092A5221992-02-0404 February 1992 TMI-1 Cycle 9 Startup Rept ML20043G2481990-04-30030 April 1990 TMI-1 Cycle 8 Startup Rept. W/900612 Ltr ML20196E8591988-12-0505 December 1988 TMI-1 Cycle 7 Startup Rept ML20236H3781987-10-0909 October 1987 App I TMI-1 1987 Reactor Bldg Local Leak Rate Testing Rept, Updated-871009, for 861104-870318 ML20237J8141987-08-21021 August 1987 TMI-1,Cycle 6 Startup Test Rept ML20214L9471987-04-13013 April 1987 Analysis of Dose Rate Under TMI-2 Reactor Vessel ML20210S0231986-11-30030 November 1986 Reactor Containment Bldg Integrated Leak Rate Test ML20214P9891986-09-15015 September 1986 TMI-2 In-Core Nozzle Evaluation ML20197H3411986-04-24024 April 1986 Gpu Nuclear TMI-1 Startup Rept for Restart ML20138F9381985-10-18018 October 1985 Rev 0 to Control Bldg `Delta-P' Test Single Mode Failure (Postulated) of Dampers (AH-D-37,41A & 28) & Airflow Measurements ML20100K8271985-03-28028 March 1985 Rev 0 to Adequacy of TMI-1 Once-Through Steam Generator Return to Svc Safety Assessment After 1984 Tech Spec Eddy Current Test Exam ML20100K7991985-03-0505 March 1985 Rev 1 to Evaluation of 1984 Required Tech Spec Exam for TMI-1 Once-Through Steam Generator ML20126B7581984-06-20020 June 1984 Rev STR-1 to RCS Leak Rate Verification Test Supporting Documentation Encl ML20090H2981984-04-30030 April 1984 TMI-1 Reactor Containment Bldg Integrated Leak Rate Test ML20091Q8441984-04-10010 April 1984 Rept on Fire Resistant Cables ML20091Q8471984-02-17017 February 1984 Fire Resistance Testing of Fire Resistant Cables ML20126C1281983-09-14014 September 1983 Rev 2 to Technical Data Rept 417, TMI-1 Once-Through Steam Generator Repair ML20126B9301983-05-11011 May 1983 Rev 3 to Technical Data Rept 388, Mechanical Integrity Analysis of TMI-1 Once-Through Steam Generator Unplugged Tubes ML20126B6581982-12-0909 December 1982 Rev 0 to Technical Data Rept 388, Mechanical Integrity Analysis of TMI-1 Once-Through Steam Generator Tubes. Supporting Documentation Encl ML20063K0421982-06-25025 June 1982 App C to TMI-1 Steam Generator Recovery Program,Task 7, Primary Sys Review,Rcs Insps & Requalification, Exam Results ML20070H5181982-06-0303 June 1982 Exam of TMI-1 Reactor Vessel O-Ring & Control Rod Drive Mechanism Closure Insert, Final Rept ML20070H5091982-05-20020 May 1982 TMI-1 Recovery:Regenerative Neutron Source Retainer Exam ML20042B8631982-03-0808 March 1982 Stress Analysis for Demonstration of Operability of Purge & Vent Valves During Dba. ML20004E4261981-06-11011 June 1981 Amend 23 to Restart Rept ML19350B7501981-03-18018 March 1981 Amend 24 to Restart Rept ML20004E4281981-02-15015 February 1981 Analysis of Two Phase Flow Induced Differential Pressure Across TMI-1 Pressurizer Safety Valve Line Elbow Taps. ML20113G3871980-11-20020 November 1980 Qualification Insp of Series 24 Circuit Breaker Control Switch to ESC-STD-1000,Rev 1 ML20062J3781980-10-17017 October 1980 Amend 22 to TMI-1 Restart Rept ML19337B5861980-10-0303 October 1980 Amend 21 to Restart Rept ML19331D1301980-08-0808 August 1980 Amend 20 to Rept in Response to NRC Recommended Requirements for Restart of TMI-1. ML19331D1731980-08-0404 August 1980 Amend 19 to Restart Rept ML19323G3401980-05-23023 May 1980 Amend 18 to Restart Rept Providing Addl Info ML19305D6091980-04-14014 April 1980 Corrected Page 2.1-45,Amend 13,to Restart Rept,Describing short-term Mods ML19305D6621980-04-11011 April 1980 Amend 16 to Restart Rept, Providing Addl Info Re Plant Mods ML19323A0591980-04-0303 April 1980 Amend 17 to Restart Rept, App 7A,Revision 2 to Radiation Protection Plan ML19305C7011980-03-28028 March 1980 Amend 15 to Restart Rept,Consisting of Proprietary Version of BAW-1601, Pilot Operated Relief Valve (PORV) Monitor Test & Flow Detectors for Pressurizer Code Safety & Porvs. BAW-1603 Withheld (Ref 1OCFR2.790) ML19290E0131980-03-0303 March 1980 Amend 13 to Restart Rept ML19296B4801980-02-15015 February 1980 Amend 12 to Restart Rept for TMI-1 ML19257D3731980-01-31031 January 1980 Amend 11 to TMI-1 Restart Rept. ML19260C7361980-01-0404 January 1980 Amend 10 to Restart Rept,Providing Addl & Nonsubstantive Administrative Changes to Emergency Plan ML19260C0311979-12-14014 December 1979 Amend 9 to 790912 Startup Rept ML19260B0181979-12-0404 December 1979 Amend 8 to 790912 Restart Rept Providing Addl Info Re Solid Waste Disposal Sys,Mobile Solidifation Sys,Plant Sheilding & Auxiliary Bldg Ventilation Sys ML19260B0191979-12-0404 December 1979 Revised Section 5.2 of TMI-1 Restart Rept Re Station Organization ML19210E5801979-12-0303 December 1979 TMI-1 Restart Rept, Amend 7 ML19210E1401979-11-28028 November 1979 Amend 6 to 790912 Restart Rept ML19254D7301979-10-26026 October 1979 Amend 3 to Restart Rept,Providing Addl Info 1997-12-31 |
Text
THREE MILE ISLAND NUCLEAR STATION UNIT 1 RESTART REPORT INSTRUCTIONS Additional binders (Volumes 2 and 3) for the TMI-l Restart Report are enclosed. It is suggested that the three volumes of the Restart Report be divided in tne following manner:
Volume 1 - Introduction and Chapters 1 through 8 Volume 2 - Chapter 9 'As-Built' drawings Volume 3 - Chapters 10, 11 and Supplement 1 82 Sets have been forwarded to:
Director of Nuclear Reactor Regulation i
Please note 2 sets have bean forwarded under separate cover, e
O #h
?9 1668 235
.
l 8001030 (#
J
Retrieved from "https://kanterella.com/w/index.php?title=ML19257A275&oldid=1897305"