MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] |
See also: IR 05000219/2008007
Text
BC Input to OC 2008-07 TdýE 410 F]~~~IN ~COVER LETTER Mr. Charles G. Pardee Chief Nuclear Officer (CNO) and Senior Vice President Exelon Generation
Company, LLC 200 Exelon Way Kennett Square, PA 19348 SUBJECT: OYSTER CREEK GENERATING
STATION -NRC LICENSE RENEWAL FOLLOW-UP
INSPECTION
REPORT 05000219/2008007
Dear Mr. Pardee On December 23, 2008, the U. S. Nuclear Regulatory
Commission (NRC) completed
an inspection
at your Oyster Creek Generating
Station. The enclosed report documents
the inspection
results, which were discussed
on December 23, 2008, with Mr. T. Rausch, Site Vice President, Mr. M. Gallagher, Vice President
License Renewal, and other members of your staff.The inspection
examined activities
conducted
under your license as they relate to safety and compliance
with the Commission's
rules and regulations
and with the conditions
of your license.In addition, an appeal of a licensing
board decision regarding
the Oyster Creek application
for a renewed license is pending before the Commission.
The NRC staff concluded
Oyster Creek should not enter the extended period of operation
without directly observing
continuing
license renewal activities
at Oyster Creek. Therefore, the NRC staff performed
an inspection
using Inspection
Procedure (IP) 71003 "Post-Approval
Site Inspection
for License Renewal" and observed Oyster Creek license renewal activities
during the last refuel outage prior to entering the period of extended operation.
IP 71003 verifies license conditions
added as part of a renewed license, license renewal commitments, selected aging management
programs, and license renewal commitments
revised after the renewed license was granted, are implemented
in accordance
with Title 10 of the Code of Federal Regulations (CFP Part 54, "Requirements
for the Renewal of Operating I icn.,P.s fnr Nuclear Power Plants."[_ (b)(5)(b)(5)(b)(5) )"he inspectors
reviewed selected procedures
ana recoras, ooserveo activities, and intervie ed personnel.
The enclosed report records the inspector's
observations, absent any conclusions
of adequacy, pending the final decision of the Commissioners
on the appeal of the renewed license.] -T, ___
it thOf re domd w of IM w ac0rac with
of Infoffnadoo
ACL ,O M -- 00 1/-r 0 "7 Q AlIA7
BC Input to OC 2008-07 SUMMARY OF FINDINGS IR 05000219/2008007;
10/27/2008
-12/23/2008;
Exelon, LLC, Oyster Creek Generating
Station; License Renewal Follow-up The report covers a multi-week
inspection
of license renewal follow-up
items. It was conducted by five region based engineering
inspectors
and the Oyster Creek resident inspector.
The inspection
was conducted
in accordance
with Insoection
Procedure
71003 "Post-Approval
Site In.-ni.r.tinn
fnr I ir.pnse Renewal.'E (b)(5)(b)((5)(b)(5) "]In accordance
with the NRC's agreement
with the State of New Jersey, state engineers-bbserved
portions of the NRC's staff review. The report documents
inspection
observations, absent any conclusions
of adequacy, pending the final decision of the Commissioners
on the appeal of the renewed license.
BC Input to OC 2008-07 BODY OF REPORT -- SAMPLE SELECTION
PROCESS 1. Inspection
Sample Selection
Process This inspection
was conducted
in order to observe AmerGen's
continuing
license renewal activities
during the last refueling
outage prior to Oyster Creek (OC) entering the extended period of operation.
The inspection
team selected a number of inspection
samples for review, using the NRC accepted guidance based on their importance
in the license renewal a~j~lication
process, as an opportunity
to make observations
on license renewal activitie
s( (b)(5)(b)(5) -Accordingly, the inspectors
recorded observations, without any assessment
of implementation
adequacy or safety significance.
Inspection
observations
were considered, in light of pending 10 CFR 54 license renewal commitments
and license conditions, as documented
in NUREG-1875, "Safety Evaluation
Report (SER) Related to the License Renewal of Oyster Creek Generating
Station," as well as programmatic
performance
under on-going implementation
of 10 CFR 50 current licensing
basis (CLB)requirements.
The reviewed SER proposed commitments
and license conditions
were selected based on several attributes
including:
the risk significance
using insights gained from sources such as the NRC's "Significance
Determination
Process Risk Informed Inspection
Notebooks," revision 2; the extent and results of previous license renewal audits and inspections
of aging management
programs;
the extent or complexity
of a commitment;
and the extent that baseline inspection
programs will inspect a system, structure, or component (SSC), or commodity
group.For each commitment
and on a sampling basis, the inspectors
reviewed supporting
documents
including
completed
surveillances, conducted
interviews, performed
visual inspection
of structures
and components
including
those not accessible
during power operation, and observed selected activities
described
below. The inspectors
also reviewed selected corrective
actions taken as a consequence
of previous license renewal inspections.
At the time of the inspection, AmerGen Energy Company, LLC was the licensee for Oyster Creek Generating
Station. As of January 8, 2009, the OC license was transferred
to Exelon Generating
Company, LLC by license amendment
No. 271 (ML082750072).