MONTHYEARML20211M6651999-09-0101 September 1999 Errata Page 4-45,reflecting Proposed Changes Requested in ML20211D1551999-08-20020 August 1999 Proposed Tech Specs Pages,Revising Degraded Voltage Relay as-left Setpoint Tolerances ML20210J1261999-07-29029 July 1999 Proposed Tech Specs Revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance TSs ML20195E6201999-06-0404 June 1999 Proposed Tech Specs,Modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20206R1171999-05-13013 May 1999 Proposed Tech Specs Section 3.1.1,incorporating Administrative Updating & Changing Bases Statement ML20205H0781999-04-0101 April 1999 Proposed Tech Specs Adding LCO Action Statements,Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20203B0511999-02-0202 February 1999 Proposed Tech Specs Expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems Outside of Containment ML20196H5361998-12-0303 December 1998 Proposed Tech Specs Reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196G4861998-12-0303 December 1998 Non-proprietary Proposed Tech Specs,Consenting to Transfer & Authorization for Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License ML20196F8661998-11-25025 November 1998 Proposed Tech Specs Revised Pages for TS Change 277 Changing Surveillances Specs for OTSG ISI for TMI Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only. with Certificate of Svc ML20154Q6271998-10-19019 October 1998 Proposed Tech Specs Adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18 ML20154P8661998-10-19019 October 1998 Proposed Tech Specs,Providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage ML20249B2421998-06-11011 June 1998 Proposed Tech Specs Re Alternate High Radiation Area Control ML20217J8201998-03-25025 March 1998 Proposed Tech Specs Page 6-1,reflecting Change in Trade Name of Owners & Operator of TMI-1 & Correcting Typo ML20217E5311998-03-23023 March 1998 Proposed Tech Specs Pages for Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 EFPY ML20217G0201997-10-0303 October 1997 Proposed Tech Specs Re Revised Pages 4-80 & 4-81 Previously Submitted ML20211F3781997-09-24024 September 1997 Proposed Tech Specs Revising Steam Line Break Accident Dose Consequence ML20211C3421997-09-19019 September 1997 Proposed Tech Specs Pages 3.8-3.9b to TS Section 3.1.4 Providing More Restrictive Limit of 0.35 Uci/Gram Dose Equivalent I-131 & Clarifying UFSAR Analysis ML20211C2431997-09-19019 September 1997 Proposed Tech Specs Re Decay Heat Removal Sys Leakage ML20210K0011997-08-14014 August 1997 Proposed Tech Specs Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J4051997-08-12012 August 1997 Proposed Tech Specs Revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operation ML20198E7941997-07-30030 July 1997 Proposed Tech Specs Incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 Nor Considered in TMI-1 UFSAR DBA Analysis Dose Calculations for 2568 Mwt ML20151K2071997-07-25025 July 1997 Revised TS Page 6-19 Replacing Corresponding Page Contained in 970508 Transmittal of TS Change Request 264 ML20141E1491997-05-0808 May 1997 Proposed Tech Specs,Consisting of Change Request 264, Incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2471997-04-21021 April 1997 Proposed Tech Specs 3.3.1.2,changing Required Borated Water in Each Core Flood Tank to 940 ft,4.5.2.1.b,lowering Surveillance Acceptance Criteria for ECCS HPI Flow to 431 Gpm & 3.3.1.1.f Re Operability of Decay Heat Valves ML20134M1211997-02-0707 February 1997 Proposed Tech Specs,Incorporating Certain Improvements from Revised STS for B&W plants,NUREG-1430 ML20133D2821996-12-24024 December 1996 Proposed Tech Specs 3.15.3 Re Auxiliary & Fuel Handling Bldg Air Treatment Sys ML20132F3301996-12-16016 December 1996 Proposed Tech Specs,Reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135D0991996-12-0303 December 1996 Proposed Tech Specs Incorporating Certain Requirements from Revised B&W Std TS,NUREG-1430 ML20135C5321996-12-0202 December 1996 Proposed Tech Specs Re Relocation of Audit Frequency Requirements ML20128H4121996-10-0303 October 1996 Errata to Proposed Ts,Adding Revised Table of Contents & Making Minor Editorial Corrections ML20117H0451996-08-29029 August 1996 Proposed Tech Specs,Consisting of Change Request 257, Incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1971996-06-28028 June 1996 Proposed Tech Specs,Consisting of Change Request 259, Allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8791996-05-24024 May 1996 Proposed Tech Specs Re Pages for App A.Certificate of Svc Encl ML20101R1571996-04-10010 April 1996 Proposed Tech Specs,Revising Addl Group of Surveillances in Which Justification Has Been Completed ML20100J6931996-02-22022 February 1996 Proposed Tech Specs,Consisting of Change Request 254, Revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Battery Cell Parameters Not Met ML20095J2311995-12-21021 December 1995 Proposed Tech Specs,Raising Low Voltage Action Level to 105 Volts DC ML20092K5471995-09-20020 September 1995 Revised Tech Spec Pages 4-31,4-32 & 4-33,incorporating Change in TS Section 4.4.1.5 ML20091L2911995-08-23023 August 1995 Proposed Tech Specs Page 6-11a,incorporating Ref to 10CFR20.1302 ML20087F4921995-08-11011 August 1995 Proposed TS Section 3.2 Re Makeup,Purification & Chemical Addition Sys Requirements ML20085N1601995-06-22022 June 1995 Proposed Tech Specs Revising Replacement Pages in Package & Remove Outdated Pages,In Response to NRC Request for Addl Info ML20084L4351995-06-0101 June 1995 Proposed TS 5.3.1.1,describing Use of Advanced Clad Assemblies ML20084N3501995-06-0101 June 1995 Proposed Tech Specs,Deleting RETS & Relocating TSs Per Guidance in GL 89-01 & NUREG-1430 ML20084B3361995-05-24024 May 1995 Proposed Tech Specs Re Change in Surveillance Test Requirements for source-range Nuclear Instrumentation ML20083N7841995-05-17017 May 1995 Proposed Tech Specs,Consisting of Change Requests 252, Removing Chemical Addition Sys Requirements from TS to COLR ML20079A7811994-12-23023 December 1994 Proposed Tech Specs Page 3-32a ML20069A6781994-05-20020 May 1994 Proposed Tech Specs,Supporting Cycle 10 Control Rod Trip Insertion Time Testing ML20065M6831994-04-19019 April 1994 Proposed Tech Specs,Reflecting Deletion of Audit Program Frequency Requirements ML20065K0451994-04-11011 April 1994 Proposed Tech Specs Reflecting Relocation of Detailed Insp Criteria,Methods & Frequencies of Containment Tendon Surveillance Program to FSAR & Providing Direct Ref to Existing Tendon Surveillance Program ML20073C7731994-03-22022 March 1994 Proposed Tech Specs Re Control Rod Trip Insertion Time Testing 1999-09-01
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211M6651999-09-0101 September 1999 Errata Page 4-45,reflecting Proposed Changes Requested in ML20211D1551999-08-20020 August 1999 Proposed Tech Specs Pages,Revising Degraded Voltage Relay as-left Setpoint Tolerances ML20210S7691999-08-12012 August 1999 Rev 10 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual ML20210J1261999-07-29029 July 1999 Proposed Tech Specs Revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance TSs ML20195E6201999-06-0404 June 1999 Proposed Tech Specs,Modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20206R1171999-05-13013 May 1999 Proposed Tech Specs Section 3.1.1,incorporating Administrative Updating & Changing Bases Statement ML20206R6531999-05-13013 May 1999 Rev 39 to TMI Modified Amended Physical Security Plan ML20205H0781999-04-0101 April 1999 Proposed Tech Specs Adding LCO Action Statements,Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20204B5291999-03-12012 March 1999 Rev 9 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual (Edcm) ML20203B0511999-02-0202 February 1999 Proposed Tech Specs Expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems Outside of Containment ML20196G4861998-12-0303 December 1998 Non-proprietary Proposed Tech Specs,Consenting to Transfer & Authorization for Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License ML20196H5361998-12-0303 December 1998 Proposed Tech Specs Reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196F8661998-11-25025 November 1998 Proposed Tech Specs Revised Pages for TS Change 277 Changing Surveillances Specs for OTSG ISI for TMI Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only. with Certificate of Svc ML20154P8661998-10-19019 October 1998 Proposed Tech Specs,Providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage ML20154Q6271998-10-19019 October 1998 Proposed Tech Specs Adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18 ML20154D5491998-10-0101 October 1998 Cancellation Notification of Temporary Change Notice 1-98-0066 to Procedure 6610-PLN-4200.02 ML20206C0911998-09-0101 September 1998 Rev 17 to Odcm ML20249B2421998-06-11011 June 1998 Proposed Tech Specs Re Alternate High Radiation Area Control ML20216E9751998-04-13013 April 1998 Emergency Dose Assessment Users Manual, for Insertion Into Rev 7 of Edcm ML20216E9491998-04-0909 April 1998 Rev 7,Temporary Change Notice 1-98-003 to 6610-PLN-4200.02, Edcm, Changing Pages 2 & 57 & Adding New Emergency Dose Assessment Users Manual ML20217J8201998-03-25025 March 1998 Proposed Tech Specs Page 6-1,reflecting Change in Trade Name of Owners & Operator of TMI-1 & Correcting Typo ML20217E5311998-03-23023 March 1998 Proposed Tech Specs Pages for Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 EFPY ML20202B2061998-01-30030 January 1998 Rev 7,Temporary Change Notice 1-98-0013 to 6610-PLN-4200.02, Edcm ML20198T4721997-12-31031 December 1997 TMI-1 Cycle 12 Startup Rept ML20217G0201997-10-0303 October 1997 Proposed Tech Specs Re Revised Pages 4-80 & 4-81 Previously Submitted ML20211F3781997-09-24024 September 1997 Proposed Tech Specs Revising Steam Line Break Accident Dose Consequence ML20211C2431997-09-19019 September 1997 Proposed Tech Specs Re Decay Heat Removal Sys Leakage ML20211C3421997-09-19019 September 1997 Proposed Tech Specs Pages 3.8-3.9b to TS Section 3.1.4 Providing More Restrictive Limit of 0.35 Uci/Gram Dose Equivalent I-131 & Clarifying UFSAR Analysis ML20210K0011997-08-14014 August 1997 Proposed Tech Specs Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J4051997-08-12012 August 1997 Proposed Tech Specs Revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operation ML20198E7941997-07-30030 July 1997 Proposed Tech Specs Incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 Nor Considered in TMI-1 UFSAR DBA Analysis Dose Calculations for 2568 Mwt ML20151K2071997-07-25025 July 1997 Revised TS Page 6-19 Replacing Corresponding Page Contained in 970508 Transmittal of TS Change Request 264 ML20217M7251997-06-22022 June 1997 Rev 16 to Procedure 6610-PLN-4200.01, Odcm ML20141E1491997-05-0808 May 1997 Proposed Tech Specs,Consisting of Change Request 264, Incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2471997-04-21021 April 1997 Proposed Tech Specs 3.3.1.2,changing Required Borated Water in Each Core Flood Tank to 940 ft,4.5.2.1.b,lowering Surveillance Acceptance Criteria for ECCS HPI Flow to 431 Gpm & 3.3.1.1.f Re Operability of Decay Heat Valves ML20134M1211997-02-0707 February 1997 Proposed Tech Specs,Incorporating Certain Improvements from Revised STS for B&W plants,NUREG-1430 ML20133D2821996-12-24024 December 1996 Proposed Tech Specs 3.15.3 Re Auxiliary & Fuel Handling Bldg Air Treatment Sys ML20132F3301996-12-16016 December 1996 Proposed Tech Specs,Reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135D0991996-12-0303 December 1996 Proposed Tech Specs Incorporating Certain Requirements from Revised B&W Std TS,NUREG-1430 ML20135C5321996-12-0202 December 1996 Proposed Tech Specs Re Relocation of Audit Frequency Requirements ML20128H4121996-10-0303 October 1996 Errata to Proposed Ts,Adding Revised Table of Contents & Making Minor Editorial Corrections ML20117H0451996-08-29029 August 1996 Proposed Tech Specs,Consisting of Change Request 257, Incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1971996-06-28028 June 1996 Proposed Tech Specs,Consisting of Change Request 259, Allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8791996-05-24024 May 1996 Proposed Tech Specs Re Pages for App A.Certificate of Svc Encl ML20138B4641996-05-0606 May 1996 Rev 14 to Procedure 6610-PLN-4200.01, Odcm ML20101R1571996-04-10010 April 1996 Proposed Tech Specs,Revising Addl Group of Surveillances in Which Justification Has Been Completed ML20100J6931996-02-22022 February 1996 Proposed Tech Specs,Consisting of Change Request 254, Revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Battery Cell Parameters Not Met ML20096F0521995-12-31031 December 1995 TMI-1 Cycle 11,Startup Rept ML20095J2311995-12-21021 December 1995 Proposed Tech Specs,Raising Low Voltage Action Level to 105 Volts DC ML20092M1941995-09-21021 September 1995 TMI-1 Pump & Valve IST Program 1999-09-01
[Table view] |
Text
.METROPOLITAN EDISON COMPANY JERSEY CENTRAL PCWER & LIGHT COMPANY AND PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION UNIT 1 Operating License No. DPR-50 Docket No. 50-289 Technical Soecification Change Request No. h1 This Technical Specification Change Request is submitted in support of Licensee's request to change Appendix A to Operating License No. DPR-50 for Three Mile Island Nuclear Station Unit 1.
As a part of this request, proposed replacement pages for Appendix A are also included.
FETROPOLITAN EDISON COMPANY
/s/ R. C. Arnold By Vice President-Generation 29th October Sworn and subscribcd to me this day of , 1976./s/ L. L. Lawyer Notary Public 1A69 047 g,910.,9 o C,/ b
-v.
..Metropolitan Edison Company (Met-Ed)
Three Mile Island Nuclear Station Unit I (TMI-1)
Docket No. 50-289 Operating License No. DPR-50 Technical Specification Change Recuest No. h1 The Licensee requests that the attached section 3.17 be added and race h-10 replace the corresponding existing Technical Specification page.
Reasons for Procosed Change To prevent steam generator tube degradation by controlling contamination of the steam generator secondary coolant.
Safety Analysis Justifyine Protosed Chance This change request imposes more restrictive limits on the steam generator secondary coolant. Therefore, no unreviewed safety question is involved.
1469'4B J
'.TABLE OF CONTENTS P, age.Section TECHNICAL SPECIFICATIONS 1-1 1 1)EFINITIONS 1-1 1.1 RATED POWER 1.2 REACTOR OPERATING CONDITIOh1
, 1-1 1-1 1.2.1 COLD SHUTDOWN 1-1 1.2.2 HOT SHUTDOWN 1-1 1.2 3 REACER CRITICAL
-1.2.h HOT STANDBY 1 1-1 1.2 5 POWER OPERATION 1-1 1.2.6 REWELING SHUTDOWN 1-2 1.2 7 REFUELING OPEATION 1-2 1.2.8 REFUELING INTERVAL 1.29 STARTUP.1-2 l-2 1.2.10 TAVG 1-2 1.2.11 HEATUP-COOLDOWN MODE 1-2 1.2.12 STATION, UNIT, PLANT, AND FACILITY l-2 1.3 OPERABLE 1.h PROTECTIVE INSTRUMENTATION IDGIC 1-2 1; 2 1.h.1 INSTRUMENT CHANNEL 1-2 1.h.2 REACTOR PROTECTION SYSTEM
, 1-3 1.h.3 PROTECTION CHANNEL 1.h.h REACTOR PROTECTION SYST M IDGIC 1-3{ENGINEERED SAFETY FEATURES SYSTEM l-3 1.k.5 1.k.6 DEGREE OF REUNDANCY 1-3 1.5 INSTRUMENTATION SURVEILLANCE 1-3 l-3 1.51 TRIP TEST 1-3 152 CHANNFL TEST 1.5.3 INS %UMENT CHANNEL CHECK 1-3 1 5.h INSTRUMENT CHAICTEL CALIBRATION 1h 1h 1.55 HEAT BALANCE CHECK 1.5.6 HEAT BALANCE CALIBRATION 1L 1.6 POE 3 DISTRIBUTION 1-5" 1.6.1 QUADRANT POWE TILT 1-3 1.6.2 REACTOR MWE IMBALANCE l-5 1.7 CONTAINMENT INTEGRITY 1-5 2 SAFETY LIMITS AND LIMITING SAFETY SYSTM SETI'INGS 2-1 2.1 SAFETY LIMITS, REACTOR CORE 21 2.2 SAFETY LIMITS, REACTOR SYSTm PRESSURE 2_k 2.3 LIMITING SAFETY SYSTEM SETTINGS, PROTECTION g TRUMENTATION 2-3 , 3 LIMITING CONDITIONS FOR CP9ATIE 31 1469'049 (31 REAC'ICR C00LA';T SYe"g j.1 ,'3 1.1 OPEATIONAL COMNNE:f S 3-1%3.1.2 PRESSURI7.ATION, HEATUP, AND C00LDOWN LIMITATIONS 3- 3 i i
...-(Pages 3-61 thru 3-66 pending approval of Tech. Spec.
Change Request 7) 1469 050.3-61
.(Pages 3-67 +-uru ~7_65 pendir,E SPProval of Tech Spec. ch , equest 19)
-1469 051 3-62
'.3.17 SECONDARY WATER CHDCSTRY Apolicability Applies to secondary system water chemistry during hot standby, startup, and power operation.
Objective , To prevent steam generator tube degradation by controlling contamination of the steam generator secondary coolant.
Specification (Refer to Table 3.17-1) 3.17.1 With the total cation conductivity of the final feedwater to any steam generator exceeding its steady state limit but within its transient limit, restore the conductivity to within its steady state limit within 2h hours; or, be in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.3.17 2 With the total cation conductivity of the final feedvater to any steam generator exceeding its transient limit, initiate action immediately to restore the conductivity to within its steady state limit within h hours; or, be in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
3.17.3 With the pH of the final feedwater to any steam generator exceeding its stecdy state limits but within its transient limits; restore the pH to its steady state limits within 2h hours; or, be in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
3.17.h With the pH of the final feedvater to any steam gecerator exceeding its transient limits, initiate action immediately to restore the pH to its steady state limits within k hours; or, be in hot shutdown
- within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
lt Bases', Contamination of the steam generator secondary coolant may cause tube degradation and impair tube integrity. Generally, the most severe contamination results from condenser inleakage of caustic forming impurities that may accumulate on the secondary side of the steam generator, or on the high heat flux surfaces of the steam generator tubes and can lead to the potential for intergranular stress corrosion crucking.
1469 052 m
- ., , Mcnitoring of the condenser condensate by cation conductivity is an effective means of detecting condenser tube inleakage. The leakage rate can then be determined by comparing the anion concentration in the condensate with the anion concentration in the condenser cooling water.The cation conductivity of the steam generator final feedwater vill indicate how effectively the condensate polishing units are removing contaminants and can indicate need for polisher regeneration.
Since full flow condensate polishing is employed, no limit is assigned to the condenser condensate. Monitoring of this parameter vill identify condenser tube leakage. Monitoring the total solids in the final feedvater is not accurate at the low levels that exist in once through steam generators operated with volatile treatment schemes.
Cation conductivity is a more sensitive means of determining the concentrations of contaminants at these low levels.
In addition, known corrosive and scaling contaminants can be monitored during periods of increased cation conductivity in order to determine the extent of condenser leakage and steam generato" contamination.
I Controlling the secondary water chemistry within the specified limits
'will control the potential accumulation of corrosive impurities in the steam generator and minimise tube degradation. These limits provide reasonable assurance that the conditions in the steam generator will minimize the potential for tube degradation during all conditions
!of operation. and postulated accidents. These measures ensure the
'continued protection of the steam generator tubing which is an essential part of the reactor coolant pressure boundary.
The terms " Steady State" and " Transient", as used in this section, apply to chemistry parameters rather than to plant operating
'conditions.
!TABLE 3.17-1 Total Cation Conductivity (umho/cm)
Final Feedvater 0 at 25 C Steady State Limit
<05 Transient Limit
< l.0 25*C Steady State Limit 9 2 < pH < 9.6 Transient Limit 9.0 5,pH 5.9.8
.3_85)kb
'.., TABLE h.1-3 (Continued)
Item Check Frequency 11.Sodium Thiosulphate Concentration Quarterly and after Tank each makeup I ~1 ,2^19 Condenser Partition Partition Factor Once if primary /
Factor secondary leakage developes, i.e.: Gross Beta-Garrn on secondary side of OTSG is ,g greater than 2 x 10 micro curies per cc anu evidence of fission products is present 13 Final Feedvater a.Cation Conductivity Continuous monitor once per 2h hour period if monitor is not operable. (h) b.pH Continuous menitor once per 2h hour period of monitor is not operable.(h)
(1) When radioactivity level is greater than 10 percent of the limits of Specification 3.1.h, the sampling frequency shall be increased to a minimum of 5 times per veek.
(2) ~E determination vill be started when the 15 minute gross degassed beta-gamma activity analysis indicates greater than 10 pCi/=1 and vill be redetermired each 10 uCi/ml increase in the 15 minute gross degassed beta-gamma activity analysis. A radio chemical analysis for this purpose shall consist of a quantitative measurement of 95 percent of radionuclides in reactor coolant with half lives of >30 minutes.
(3) When the 15 minute gross degassed activity increases by a factor of two above background, an iodine analysis will be made and performea thereafter when the 15 minute gross degassed beta-gamma activity increases by 10 percent.(L) Not required with the reactor sub-critical.
}khh L-10