Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211M6651999-09-0101 September 1999 Errata Page 4-45,reflecting Proposed Changes Requested in ML20211D1551999-08-20020 August 1999 Proposed Tech Specs Pages,Revising Degraded Voltage Relay as-left Setpoint Tolerances ML20210J1261999-07-29029 July 1999 Proposed Tech Specs Revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance TSs ML20195E6201999-06-0404 June 1999 Proposed Tech Specs,Modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20206R1171999-05-13013 May 1999 Proposed Tech Specs Section 3.1.1,incorporating Administrative Updating & Changing Bases Statement ML20205H0781999-04-0101 April 1999 Proposed Tech Specs Adding LCO Action Statements,Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20203B0511999-02-0202 February 1999 Proposed Tech Specs Expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems Outside of Containment ML20196H5361998-12-0303 December 1998 Proposed Tech Specs Reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196G4861998-12-0303 December 1998 Non-proprietary Proposed Tech Specs,Consenting to Transfer & Authorization for Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License ML20196F8661998-11-25025 November 1998 Proposed Tech Specs Revised Pages for TS Change 277 Changing Surveillances Specs for OTSG ISI for TMI Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only. with Certificate of Svc ML20154Q6271998-10-19019 October 1998 Proposed Tech Specs Adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18 ML20154P8661998-10-19019 October 1998 Proposed Tech Specs,Providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage ML20249B2421998-06-11011 June 1998 Proposed Tech Specs Re Alternate High Radiation Area Control ML20217J8201998-03-25025 March 1998 Proposed Tech Specs Page 6-1,reflecting Change in Trade Name of Owners & Operator of TMI-1 & Correcting Typo ML20217E5311998-03-23023 March 1998 Proposed Tech Specs Pages for Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 EFPY ML20217G0201997-10-0303 October 1997 Proposed Tech Specs Re Revised Pages 4-80 & 4-81 Previously Submitted ML20211F3781997-09-24024 September 1997 Proposed Tech Specs Revising Steam Line Break Accident Dose Consequence ML20211C3421997-09-19019 September 1997 Proposed Tech Specs Pages 3.8-3.9b to TS Section 3.1.4 Providing More Restrictive Limit of 0.35 Uci/Gram Dose Equivalent I-131 & Clarifying UFSAR Analysis ML20211C2431997-09-19019 September 1997 Proposed Tech Specs Re Decay Heat Removal Sys Leakage ML20210K0011997-08-14014 August 1997 Proposed Tech Specs Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J4051997-08-12012 August 1997 Proposed Tech Specs Revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operation ML20198E7941997-07-30030 July 1997 Proposed Tech Specs Incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 Nor Considered in TMI-1 UFSAR DBA Analysis Dose Calculations for 2568 Mwt ML20151K2071997-07-25025 July 1997 Revised TS Page 6-19 Replacing Corresponding Page Contained in 970508 Transmittal of TS Change Request 264 ML20141E1491997-05-0808 May 1997 Proposed Tech Specs,Consisting of Change Request 264, Incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2471997-04-21021 April 1997 Proposed Tech Specs 3.3.1.2,changing Required Borated Water in Each Core Flood Tank to 940 ft,4.5.2.1.b,lowering Surveillance Acceptance Criteria for ECCS HPI Flow to 431 Gpm & 3.3.1.1.f Re Operability of Decay Heat Valves ML20134M1211997-02-0707 February 1997 Proposed Tech Specs,Incorporating Certain Improvements from Revised STS for B&W plants,NUREG-1430 ML20133D2821996-12-24024 December 1996 Proposed Tech Specs 3.15.3 Re Auxiliary & Fuel Handling Bldg Air Treatment Sys ML20132F3301996-12-16016 December 1996 Proposed Tech Specs,Reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135D0991996-12-0303 December 1996 Proposed Tech Specs Incorporating Certain Requirements from Revised B&W Std TS,NUREG-1430 ML20135C5321996-12-0202 December 1996 Proposed Tech Specs Re Relocation of Audit Frequency Requirements ML20128H4121996-10-0303 October 1996 Errata to Proposed Ts,Adding Revised Table of Contents & Making Minor Editorial Corrections ML20117H0451996-08-29029 August 1996 Proposed Tech Specs,Consisting of Change Request 257, Incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1971996-06-28028 June 1996 Proposed Tech Specs,Consisting of Change Request 259, Allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8791996-05-24024 May 1996 Proposed Tech Specs Re Pages for App A.Certificate of Svc Encl ML20101R1571996-04-10010 April 1996 Proposed Tech Specs,Revising Addl Group of Surveillances in Which Justification Has Been Completed ML20100J6931996-02-22022 February 1996 Proposed Tech Specs,Consisting of Change Request 254, Revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Battery Cell Parameters Not Met ML20095J2311995-12-21021 December 1995 Proposed Tech Specs,Raising Low Voltage Action Level to 105 Volts DC ML20092K5471995-09-20020 September 1995 Revised Tech Spec Pages 4-31,4-32 & 4-33,incorporating Change in TS Section 4.4.1.5 ML20091L2911995-08-23023 August 1995 Proposed Tech Specs Page 6-11a,incorporating Ref to 10CFR20.1302 ML20087F4921995-08-11011 August 1995 Proposed TS Section 3.2 Re Makeup,Purification & Chemical Addition Sys Requirements ML20085N1601995-06-22022 June 1995 Proposed Tech Specs Revising Replacement Pages in Package & Remove Outdated Pages,In Response to NRC Request for Addl Info ML20084L4351995-06-0101 June 1995 Proposed TS 5.3.1.1,describing Use of Advanced Clad Assemblies ML20084N3501995-06-0101 June 1995 Proposed Tech Specs,Deleting RETS & Relocating TSs Per Guidance in GL 89-01 & NUREG-1430 ML20084B3361995-05-24024 May 1995 Proposed Tech Specs Re Change in Surveillance Test Requirements for source-range Nuclear Instrumentation ML20083N7841995-05-17017 May 1995 Proposed Tech Specs,Consisting of Change Requests 252, Removing Chemical Addition Sys Requirements from TS to COLR ML20079A7811994-12-23023 December 1994 Proposed Tech Specs Page 3-32a ML20069A6781994-05-20020 May 1994 Proposed Tech Specs,Supporting Cycle 10 Control Rod Trip Insertion Time Testing ML20065M6831994-04-19019 April 1994 Proposed Tech Specs,Reflecting Deletion of Audit Program Frequency Requirements ML20065K0451994-04-11011 April 1994 Proposed Tech Specs Reflecting Relocation of Detailed Insp Criteria,Methods & Frequencies of Containment Tendon Surveillance Program to FSAR & Providing Direct Ref to Existing Tendon Surveillance Program ML20073C7731994-03-22022 March 1994 Proposed Tech Specs Re Control Rod Trip Insertion Time Testing 1999-09-01
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211M6651999-09-0101 September 1999 Errata Page 4-45,reflecting Proposed Changes Requested in ML20211D1551999-08-20020 August 1999 Proposed Tech Specs Pages,Revising Degraded Voltage Relay as-left Setpoint Tolerances ML20210S7691999-08-12012 August 1999 Rev 10 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual ML20210J1261999-07-29029 July 1999 Proposed Tech Specs Revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance TSs ML20195E6201999-06-0404 June 1999 Proposed Tech Specs,Modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20206R1171999-05-13013 May 1999 Proposed Tech Specs Section 3.1.1,incorporating Administrative Updating & Changing Bases Statement ML20206R6531999-05-13013 May 1999 Rev 39 to TMI Modified Amended Physical Security Plan ML20205H0781999-04-0101 April 1999 Proposed Tech Specs Adding LCO Action Statements,Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20204B5291999-03-12012 March 1999 Rev 9 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual (Edcm) ML20203B0511999-02-0202 February 1999 Proposed Tech Specs Expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems Outside of Containment ML20196G4861998-12-0303 December 1998 Non-proprietary Proposed Tech Specs,Consenting to Transfer & Authorization for Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License ML20196H5361998-12-0303 December 1998 Proposed Tech Specs Reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196F8661998-11-25025 November 1998 Proposed Tech Specs Revised Pages for TS Change 277 Changing Surveillances Specs for OTSG ISI for TMI Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only. with Certificate of Svc ML20154P8661998-10-19019 October 1998 Proposed Tech Specs,Providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage ML20154Q6271998-10-19019 October 1998 Proposed Tech Specs Adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18 ML20154D5491998-10-0101 October 1998 Cancellation Notification of Temporary Change Notice 1-98-0066 to Procedure 6610-PLN-4200.02 ML20206C0911998-09-0101 September 1998 Rev 17 to Odcm ML20249B2421998-06-11011 June 1998 Proposed Tech Specs Re Alternate High Radiation Area Control ML20216E9751998-04-13013 April 1998 Emergency Dose Assessment Users Manual, for Insertion Into Rev 7 of Edcm ML20216E9491998-04-0909 April 1998 Rev 7,Temporary Change Notice 1-98-003 to 6610-PLN-4200.02, Edcm, Changing Pages 2 & 57 & Adding New Emergency Dose Assessment Users Manual ML20217J8201998-03-25025 March 1998 Proposed Tech Specs Page 6-1,reflecting Change in Trade Name of Owners & Operator of TMI-1 & Correcting Typo ML20217E5311998-03-23023 March 1998 Proposed Tech Specs Pages for Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 EFPY ML20202B2061998-01-30030 January 1998 Rev 7,Temporary Change Notice 1-98-0013 to 6610-PLN-4200.02, Edcm ML20198T4721997-12-31031 December 1997 TMI-1 Cycle 12 Startup Rept ML20217G0201997-10-0303 October 1997 Proposed Tech Specs Re Revised Pages 4-80 & 4-81 Previously Submitted ML20211F3781997-09-24024 September 1997 Proposed Tech Specs Revising Steam Line Break Accident Dose Consequence ML20211C2431997-09-19019 September 1997 Proposed Tech Specs Re Decay Heat Removal Sys Leakage ML20211C3421997-09-19019 September 1997 Proposed Tech Specs Pages 3.8-3.9b to TS Section 3.1.4 Providing More Restrictive Limit of 0.35 Uci/Gram Dose Equivalent I-131 & Clarifying UFSAR Analysis ML20210K0011997-08-14014 August 1997 Proposed Tech Specs Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J4051997-08-12012 August 1997 Proposed Tech Specs Revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operation ML20198E7941997-07-30030 July 1997 Proposed Tech Specs Incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 Nor Considered in TMI-1 UFSAR DBA Analysis Dose Calculations for 2568 Mwt ML20151K2071997-07-25025 July 1997 Revised TS Page 6-19 Replacing Corresponding Page Contained in 970508 Transmittal of TS Change Request 264 ML20217M7251997-06-22022 June 1997 Rev 16 to Procedure 6610-PLN-4200.01, Odcm ML20141E1491997-05-0808 May 1997 Proposed Tech Specs,Consisting of Change Request 264, Incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2471997-04-21021 April 1997 Proposed Tech Specs 3.3.1.2,changing Required Borated Water in Each Core Flood Tank to 940 ft,4.5.2.1.b,lowering Surveillance Acceptance Criteria for ECCS HPI Flow to 431 Gpm & 3.3.1.1.f Re Operability of Decay Heat Valves ML20134M1211997-02-0707 February 1997 Proposed Tech Specs,Incorporating Certain Improvements from Revised STS for B&W plants,NUREG-1430 ML20133D2821996-12-24024 December 1996 Proposed Tech Specs 3.15.3 Re Auxiliary & Fuel Handling Bldg Air Treatment Sys ML20132F3301996-12-16016 December 1996 Proposed Tech Specs,Reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135D0991996-12-0303 December 1996 Proposed Tech Specs Incorporating Certain Requirements from Revised B&W Std TS,NUREG-1430 ML20135C5321996-12-0202 December 1996 Proposed Tech Specs Re Relocation of Audit Frequency Requirements ML20128H4121996-10-0303 October 1996 Errata to Proposed Ts,Adding Revised Table of Contents & Making Minor Editorial Corrections ML20117H0451996-08-29029 August 1996 Proposed Tech Specs,Consisting of Change Request 257, Incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1971996-06-28028 June 1996 Proposed Tech Specs,Consisting of Change Request 259, Allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8791996-05-24024 May 1996 Proposed Tech Specs Re Pages for App A.Certificate of Svc Encl ML20138B4641996-05-0606 May 1996 Rev 14 to Procedure 6610-PLN-4200.01, Odcm ML20101R1571996-04-10010 April 1996 Proposed Tech Specs,Revising Addl Group of Surveillances in Which Justification Has Been Completed ML20100J6931996-02-22022 February 1996 Proposed Tech Specs,Consisting of Change Request 254, Revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Battery Cell Parameters Not Met ML20096F0521995-12-31031 December 1995 TMI-1 Cycle 11,Startup Rept ML20095J2311995-12-21021 December 1995 Proposed Tech Specs,Raising Low Voltage Action Level to 105 Volts DC ML20092M1941995-09-21021 September 1995 TMI-1 Pump & Valve IST Program 1999-09-01
[Table view] |
Text
METRCPOLITA'I EDISCII CC!GAITI JERSEY CE ITRAL PCWER & LIGHT CC:GETI MID PE'INSYLVETIA ELECTRIC CC!P Erl THREE MILE ISLAND ;UCLEAR STATIO:I UNIT 1 Operating License IIo. DPR-50" socket :Ir. 50-269 Technical Specification Chance Request No. 83 This Technical Specification Change Reqtest is suLmitted in support of Licensee's request to change Appendix A to Cperating License !Io. DPR-50 for Three Mile Island Nuclear Station Unit 1.
As a part of this request, proposed replacement pages for Appendix A are also included.
METROPOLITMI EDISCN COMPA:Tl a v/-E'Vice President Sworn and subscribed to me this D Ab day of , 1978.M 40 IIctary @uhJ.ic
/p \GEORGE J. TROFFER
, Notary PA:i:, Reicing. Gerns Co.
My Comrn:ss.cn E3p:rss.'an. 25,1922
, 1490 345 7910810 Three Mile Island Nuclear Station, Unit 1 Operating License No. DPR-50 Docket No. 50-289 Frocosed Technical Specification Change No. 83 The license requests that the attached changed pages replace pages 3-88, 3-89, 3-90, 3-91, and 4-73b of the existing Technical Epscification.
Reasons for Change Request 1.Page 3-88 has been changed to clarify Specification 3.18.2.2.b.
--2.Page 3-89 has been changed to dclete the need for a continuous fire watch
'and replace it with a fire patrol to conserve manpower.
3.Page 3-90 has been changed to permit operation with a pressu e below the lov alar = setting pressure.
L.Page 3-91 has been ehtnged to permit maintenance and testing without the Air Intake Tunnel Celuge Systes operable.
5 7tge h-73b has been changed to permit inspection of the diesel generator during cperations.
Refe y Analysis Justifying Change 1.This change only clarifies Section 3.18.2.2.b and does not change any Limiting Conditions for Operation, therefore, an unreviewed safety question has not been propose 1.
2.This change provides for the establishnent of a backup fire suppression water system in the zone where the deluge and/or sprinkler system is inoperable, and the establishment of a fire patrol which would inspect the affected area once per hour. The establishment of a backup fire suppression water system and a fire patrol provides reasonable assurance that adequate detection and subsequent suppression capabilities are available in the event a fire occurs when the suppression or detection system is inoperable. The detection and subsequent suppression of a fire are equally important. As the Technical Specifications now read, should the instrumentation to detect a fire fail to operate, a fire patrol is deemed adequate. Therefore, in a situation where the deluge and/or sprinkler system are inoperable, and a backup fire suppression systen is established to provide suppression protection, a fire patrol provides adequate detection capability and does not represent an unreviewed safety question.3 The specification now requires a minimum pressure of 300 psig in the CO, systen storage tank (s). The normal operating pressure varies between 295 and 305 psig. Although 275 psig is the low pressure alarm setpoint, the systen vill still supply the required amount of CO, to the relay room at a pressure as low as 220 psig. The revised specification of 250 psig vill provide a margin to allow time to respond to the low pressure alarm "hile maintaining sufficient margin to the 220 osig pressure. Therefore, the proposed change does not involve an unreviewed safety question.
1490 346
.h.This change permits the Air Intake Deluge System to be taken out of service for up to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for maintenance and testing when the Halon system is in-operable. The specification now requires the deluge system to be in service unless the tunnel is occupied. The probability that the system would be out of service under the new specification and an aircraft vould strike the unit during this time is not significantly greater than was calculated for such an event occurring under the present specification. Therefore, this change does not involve an unreviewed safety question.
5 The Specification now reads that inspection is only permitted when the reactor is shut down. This change permits inspection af the fire pump diesels when
., the reactor is in operation. Only one fire pump diesel shall be inspected at a time, and the other diesel vould be ready for operation. Therefore, this change does not represent an unreviewed safety question.
Arendmen: Class (10 CFP 1~0)
The licensee has determined that, because this requested Amendment is a similar Amendment for an essentially identical unit, at the same site, this is a Class I Ama*~aa*(per CFR 170.22). The appropriate remittance therefore is $h00.00.
1490 347
..3.18.2 FIRE SUPPRESSION WATER SYSTEM Aeolicability:
All operating conditions Ob.icetive :
To ensure adequate fire suppression capability Srecification:
3.18.2.1 The Fire Suppression Water System shall be operable with:
Two (2) high pressure pumps of the following four (h), shall be a.operable with their discharge aligned to the fire suppression
~header and automatic initiation logic operable. Any two of the
--pumps provide co=bined capacity greater t: tan 3575 gal / min:
.1.Circulating Water Flume Diesel Fire Pump 2.River '4ater Diesel Fire Pump, Unit 1
.3 River Wat'er Diesel Fire Pump, Unit 2 h.River *4 ster Motor Fire Pump, Unit 1 b.Two (2) separate water supplies of the following four (h) each containing a mini =um of 90,000 gallons:
1.Altitude Tank 2.Ci"-"#g Water Flume 3 Unit 1 River Water Intake k.Unit 2 Eiver Water Intake c.An operab'e flow path capable of taking suction from two of the operable sources listed in b. above, and transferring the water
'through distribution piping with operable sectionalizing control or isolation valves to the yard hydrant curb valves and the front valve ahead of the water flov alarm device on each sprinkler, hose standpipe or spray system riser.
3.18.2.2 a.With less thr.n the above required :quipment, restere the inoperable equipment tc OPERABLE r+atus within 7 days or prepare and submit a Special heport to the commission within the next 14 days outlining the plans ar.d procedures to be used to provide for the loss of redundancy in this system.
...b.With the FIRE SUPPRESSION WATER SYSTEM IUCPERABLE:
Return the Fire Suppression hater System to OPERABLE status er l1.establish a backup FIRE SUFPRESSION WATER SYSTEM vithin 2h hours, and provide Prempt Notification with Written Followup pursuant to Specification 6.9 2.A outlining the actions taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status, or 2.be in het shutdown within an additional 1 hcur and cold shutdown l vithin the next 30 hcurs, i490 348 3-88
_..3.18.3 DELUGE /SPRI!!KLER SYSTEt3 Aeolicability: At all times when equipment in the area is required to be operable.Objective: To assure adequate fire suppression capability.
~~Suecification:
_3.18.3.1 The Deluge and/or Sprinkler Systems located in the following areas shall be operable.
.a.Diesel Generator and Radiator Rooms b.Diesel Generator Combustion Air Intakes
--c.Diesel Generator Cooling Air Intake d.Control Build _.ag Filter (AH-F3A, AH-F33) Rooms
-e.Air Intake Tunnel (3 zones) f.Charcoal Filter ( AH-F10, AH-F11) g.Intake Screen Pump House h.Diesel driven fire pump areas
- i. Control Building at elevation 306' 3 13.3.2 With any of the above deluge and/or sprinkler systems in any room or zone inoperable:
a.Establish backup fire suppression equipment for the affected room or zone above, within one hour, b.Within one heur, establish a fire watch patrol to inspect the affected room or zone at least onte per hour, except that no Fire Watch is required in the air intake tunnel.
Restore the system to OPERABLE status within lh days or pre-c.pare and submit a special report to the Commission within the next 30 days outlining the action taken, the cause of in-operability and the plans and schedule for restoring the system to OPERABLE status.
...1490 349 3-89'
.3.13.h CO2 SYSTEM Aeolicability:
At all times whan the eauipment in the area is required to be operable.Objective: To ensure adequate fire suppression capability.
--Scecification:
.3.18.h.1 The CO2 system for the Cable Spreading Room shall be operable with a minimum level corresponding to 8500 lbs and a minimum pressure of
-250 psig in the associated storage tank .
-' f_ ,'3.18.h.2 With the CO2 system for the cable Spreading Room inoperabie:
, a.Establish a patrolling fire wated'vith backup fire suppression.
lequipment fdr the unprotected area within one hour.
b.Restore -he system to OPERABLE status within 1h days or pre-pare and submit a Special Report to the Commission within the next 30 days outlining the action taken, the cause of in-operabili y and the plans and schedule for restoring the system t0 C?I7A3LE status.
....-*To inspect the Cable Spreading Room at least once per hour.
l3-9 1490 350'
_-...-3.18.5 HALON SYSTE'i Applicability: At all times except when the Control Building ventilation m is on recirculation.
Objective: To assure adequate fire suppression for the Air Intake Tunnel.
Suecification :
3 18.5.1 The iIalon Systems for the air intake tunnel shall be operable except
-for testing or maintenance not to exceed h8 hours that requires the air tunnel tc be occupied. The Halon storage tanks shall have at least 905 of fcil charge pressure and 95% full charge weight.
3 18.5.2 If the Halen syste= in any zone is inoperable:
a.The Air Intake Tunnel Deluge system shall be operable except that rencval for up to h8 hours is permitted for maintenance or testing.
b.Restore the system to OPERA 3LE status within 1h days or pre-
- pare and submit a Special Report to the Comission within the next 30 days outlining the action taken, the cause of the in-operability and the plans and schedule for restoring the systes to operabic status.
.0.w-1490 351
. . . _..-_, k.13.2.2 The fire pump diesel engines shall be demonstrated OPEF.ABLE:
.a.At least once per 31 days by verifying; 3 The fuel storage tanks contain at least 250 gallons of fuel, and 2.The diesels start from ambient conditions and operate for at least 20 minutes.
,_, b.At least once per 92 days by verifying that a sa=ple of diesel
, fuel from each fuel storage tank, obtained in accordance with ASnt-D270-65, is within the acceptable liv.s specified in Table 1 of ASTM-D975-Th with respect to viscosity, vater content and s ad '- a
- for the type of fuel specified for the diesels, c.At least ence per 18 months, hy:
,"!1.Subjecting each diesel to an inspection in accordance with precedu es prepared in conjunction with its manufacturer's rece mendations for the class of service, and 2.Verifyi.g each diesel starts from ambient conditions on the aute-sta t signal and operates for > 20 minutes while leaded with the fire pump.
_h.18.2.3 Each fire pu p diesel starting 2h-volt battery bank and charger shall be demonstrated OPE?A3LE:
st . At least once per T days by verifying that:
1 The electrolyte level of ea;h batter / is above the plates, and.2.The overall battery voltage is > 2h volts.
_'.._h-73b 1490 352