Draft Response to Loca/Loop Questions
ML060730525
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/20/2006
From: Coddington C
Susquehanna
To: Richard Guzman
Office of Nuclear Reactor Regulation
References
Download: ML060730525 (4)


Text

Richard Guzman -Draft response to LOCA/LOOP questions Page 1 lFrom: "Coddington, Cornelius T" <ctc:oddington@pplweb.com>

To: "Richard Guzman" <RVG~nrc:.gov>

Date: 1/20/)6 1:14PM

Subject:

Draft response to LOCA/LOOP questions Rich Here are PPL's draft responses to the reviewers questions on LOCA/LOOP testing. Wednesday (1/25) or Thursday (1/26) of next week would be the best time for a phone call.Neil<<Response to e-mailed NRC Questions Rev 1.doc>>The information contain ed in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited.

If you have received this communication in error, please notify us immediately, and delete the original message.

Ic\emp\GWJ00001 .TMP Page 1 I c:\temp\GW}OOOO1 .TMP Page 1 Mail Envelope Properties (43F5DDEE.IBB:

22:12731)

Subject:

Draft response to questions on LOCA/LOOP testing Creation Date: 2/17/06 9:29AM From: "Coddington, Cornelius T" <ctcoddington@pplweb.com>

Created By: ctcoddington@pplweb.com Recipients nrc.gov owf4-po.OWFNDOD RVG (Richard Guzman)Post Office Route owf4_po.OWFNDO) nrc.gov Files Size Date & Time MESSAGE 774 02/17/06 09:29AM TEXT.htm 1470 PLA-zzzz.doc 47104 Mime.822 69098 Options Expiration Date: None Priority:

Standard Reply Requested:

No Return Notification:

None Concealed

Subject:

No Security:

Standard Response to NRC Questions on LOCA/LOOP TS Change Question: In support of their review of the subject amendment (PLA-5869), the Electrical Engineering Branch requests to have a discussion with your technical group. The questions are (1) wiy do two load groups have to be de-energized in order to perform SR 3.8.1.19.

Why can': one load group be d&-energized to perform the SR? (2) Do 2 EDGs have to be in an LCD to perform this SR?Response (1): It is possible to perform the LOCA/LOO]?

surveillance one load group at a time.However, testing in this manner does not adequately test the design of the plant as adverse interactions between the load groups would not be detectable.

The design of the plant for a LOCA/L1DOP relies upon the emergency diesel generators to all start and load onto their respective 4kV ESS bus in each Unit. Design features exist that preclude adverse interaction between any of the load groups. Testing a division (2 load groups) at the same time, verifies that that there is no adverse interaction between the 2 load groups.Response (2): During this testing, all emergency diesel generators (EGD) are operable.

Should an event occur the EDGs are capable of loading onto the required number of Unit 1 and Unit 2 (operating unit) buses and accepting the required loads.During the performance of the LOCA/LCOP surveillance, the following are the Unit 2 Technical Specification Impacts:* U2 TS 3.8.1,A C Sources Operating, Condition A -for loss of one offsite source since one of the two offsite sources' 4kV supply breakers are disabled.Action: Restore offsite source within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s* U2 TS 3.8.7, Distribution Systems Operating, -for the momentary loss of 2 Unit 1 4kV ESS Buses while they are being loaded onto the EDGs. Since there are no Conditions in TS 3.8.7 that apply to the loss of 2 Unit 1 4kV ESS Buses, LCO 3.0.3 is entered.Action: Enter LCO 3.0.3 (reason for Tech Spec change)* U2 TS 3.5.1, E]CCS-Operating, -(only during Division I testing) for the loss of one Core Spray loop on Unit 2. SSES is designed to withstand a LOCA simultaneous with a loss of offsite power assuming the most severe active single failure. This means the plant must withstand a LOCA on one unit combined with a Page 1 of 2 Response to NRC Questions on LOCA/LOOP TS Change (Continued) false or spurious LOCA signal on ihe non-accident unit. Interlocks between the Unit 1 and Unit 2 Core Spray Systems prevent electrical system overloads by limiting the rnumber of CS pumps that can start because of a LOCA/False LOCA signal.Any time a LOCA signal (low reactor water level or high drywell pressure combined with low reactor pressure) is generated in Unit 1, a trip signal is sent to Unit 2 CS pumps A and C. Similarly, if a LOCA signal is generated in Unit 2, Unit 1 CS pumps B and D receive a trip signal. The pumps receiving a trip signal are also prevented from starting.

Therefore, a LOCA in one unit and a false LOCA signal in non-accident unit will start A and C CS pumps on Unit 1 and the B and D CS pumps on Unit 2. A single LOCA signal on either unit will start all four CS pumps of the affected unit and will trip and prevent operation of two CS pumps of the unaffected unit.See FSAR Section 7.3.1.Ia.1.5 for a description of the Core Spray system instrumentation and controls.Action: Restore Core Spray Loop A within 7 days U2 TS 3.3.8.1, Loss of Power (LOP) Instrumentation, because the LOP instrumentation is jumpered out during the test.Action: Restore LOP instrumentation within one hour. (Reason for Tech Spec change)All other equipment needed to support Unit 2 operation remains operable during this surveillance test. In addition, the surveillance procedure provided guidance to the operator on restoring the systems should an event occur.Page 2 of 2