ML18122A241

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Accepted for Review - Sequoyah 1 and 2, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04)
ML18122A241
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/02/2018
From: Samson Lee
Plant Licensing Branch 1
To: Hess T
Tennessee Valley Authority
References
L-2018-LLA-0060
Download: ML18122A241 (2)


Text

NRR-DMPSPEm Resource From: Lee, Samson Sent: Wednesday, May 2, 2018 10:27 AM To: tahess@tva.gov Cc: Hon, Andrew

Subject:

Accepted for Review - Sequoyah Nuclear Plant, Units 1 and 2, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) (EPID: L-2018-LLA-0060)

By letter dated March 9, 2018 (ADAMS No. ML18071A349), as supplemented by letter dated April 11, 2018 (ADAMS No. ML18102B430), TVA submitted the subject request for Sequoyah Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

The NRC staff is expected to spend 335 hours13.958 days <br />1.994 weeks <br />0.459 months <br /> to complete the review within 12 months.

If you have any questions, please contact me.

Andy Hon, PE Project Manager (Sequoyah Nuclear Plant)

Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 1

Hearing Identifier: NRR_DMPS Email Number: 338 Mail Envelope Properties (Samson.Lee@nrc.gov20180502102600)

Subject:

Accepted for Review - Sequoyah Nuclear Plant, Units 1 and 2, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) (EPID: L-2018-LLA-0060)

Sent Date: 5/2/2018 10:26:36 AM Received Date: 5/2/2018 10:26:00 AM From: Lee, Samson Created By: Samson.Lee@nrc.gov Recipients:

"Hon, Andrew" <Andrew.Hon@nrc.gov>

Tracking Status: None "tahess@tva.gov" <tahess@tva.gov>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1817 5/2/2018 10:26:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: