ML061320542

From kanterella
Revision as of 19:14, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
E-mail from G. Bowman of USNRC to S. Smith of USNRC, Regarding Executive Summaries
ML061320542
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/15/2006
From: Gregory Bowman
Entergy Nuclear Operations
To: Shawn Smith
NRC/FSME
References
FOIA/PA-2006-0140
Download: ML061320542 (17)


Text

Stacy Smith FW: 6 -guriA'a6e"i S a y S ih F :E e u i e S m a Ie --1..I-I~ -- ---- 1-,1- -~-,- -11 11 111,--I 1-- .- -X--=-1.1 Pag -11 From: "Bowman, Greg " <GBowm90@entergy.com>

To: "'sms4@nrc.gov"'

<sms4@nrc.gov>

Date: 3/15/06 8:28AM

Subject:

FW: Executive Summaries From: Croulet, Donald Sent: Thursday, January 26, 2006 12:16 PM To: Janicki, John; 'James Noggle'; 'Timothy Rice'; PRICE, ERNEST JR; Robert Oliveira (boliveira@

amnucins.com)

<mailto:boliveira@amnucins.com)>;

Cox, Mark R; Bowman, Greg

Subject:

FW: Executive Summaries fyi From: Lavera, Ron Sent: Thursday, January 26, 2006 11:15 AM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta;ERNEST PRICE; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Robert Oliveira; Ron Lavera; Ronald Sachatello; T. R. Jones; Thomas Burns

Subject:

Executive Summaries Please see the attached sample executive summaries.

Ron <<mwexecsummSort-byDateJan_26_2006.doc>>

<<mwexecsummSortby_WellJan_26_2006.doc>>

RLaVera entergy.com

<mailto:RLaVera©entergy.com>

914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308 c!:\ternP\G}QO0TMP--I Page 1111----1-1111-Mail Envelope Properties (4418167A.027:

1: 57383)

Subject:

Creation Date: From: Created By: FW: Executive Summaries 3/15/06 8:27AM"Bowman, Greg " <GBowm90@entergy.com>

GBowm90@entergy.com Recipients nrc.gov kpl-po.KPDO SMS4 (Stacy Smith)Post Office kpl-po.KP.DO Route nrc.gov]Files Size Date &MESSAGE 1348 03/15/0 TEXT.htm 3635 mwexecsummSort_byvDate Jan_26_2006.doc 142336 mwexecsumm__Sortby-WellJan_26_2006.doc 218624 Mime.822 501770 Time 5 08:27AM Options Expiration Date: Priority: Reply Requested:

Return Notification:

Concealed

Subject:

Security: None Standard No None No Standard I. __ I --1 -w IZ, , I , Z' --- ---- -I1-1-1 I -, 'Stacv Smith -mw execsumm Sort "qO--_q.doc Page 1 4 Stacy Smithr .....,= ->9 mw eesusSmmSo,__..r.....by,,...,.

_:at,,,,,___e

,_Ja_ .,,.,,26.

= 006;.,o Pag 1,..................................v..,,,=.....

..On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6 th Date ID Location Sample Results 9/28- MW-107 NEM ND/HTO 29/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO MW-111 Transformer Yard 212,000 pCi/l HTO 10/5/05 MW-111 Transformer Yard 188,000 pCi/l HTO 10/6/05 U3-1 U3 Discharge Canal 417 pCi/l HTO U3-2 U3 Discharge Canal 960 pCi/I HTO U3-3 U3 Discharge Canal 439 pCi/l HTO 10/7/05 U3-T1 U3 South Turbine 703 pCiIl HTO U3-T2 U3 North Turbine 1,590 pCi/I HTO MW-111 Transformer Yard 188,000 pCi/I HTO 10/14/05 MW-111 Transformer Yard 6,820 pCi/I HTO (rain)MW-111 Transformer Yard 6,320 pCi/I HTO (back-up)10/16/05 U3-4 U3 Condensate Polisher 406 pCi/A HTO 10/18/05 MH-B8 IP-3 Manhole IP-3 Disch Canal 959 pCi/I HTO East of IP-3 Monitor Tank MH-A4 ND/HTO 10/21/05 MW-111 Transformer Yard 284,000 pCill HTO 267,000 pCi/I HTO DEC 10/21/05 U3-1 U3 Discharge Canal ND/HTO U3-1 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal 512 pCi/I HTO DEC U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 399 pCi/I HTO U3-4 U3 Condensate Polisher 344 pCi/I HTO DEC U3-T1 U3 South Turbine ND/HTO U3-T1 U3 South Turbine ND/HTO DEC U3-T2 U3 North Turbine 1,470 pCi/l HTO U3-T2 U3 North Turbine 1,420 pCi/I HTO DEC mwexecsummSort-byDateJan_26_2006.doc 7 Page 1 of

,do--.111-11 ",V,-V -- -- --~ I --~ -~ _ -~ -- ~Y -- --~. , -~ -....Page 2,.1 Stacy Smith -mwexecsummSorLbyDateJan26_2006.doc Page 2 On-Site Monitoring Wells Sorted by Date Executive Sununary January 2 6 th 10/28/05 MW-l1l Transformer Yard 218,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal NDI/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-T1 U3 South Turbine NDIHTO U3-T2 U3 North Turbine 1,280 pCi/I HTO 11/4/05 MW-111 Transformer Yard 302,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal NDIHTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO Date ID Location Sample Results 11/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/05 MW-111 Transformer Yard 246,000 pCi/I HTO U3-1 U3 Discharge Canal NDIHTO U3-2 U3 Discharge Canal NDIHTO U3-3 U3 Discharge Canal 471 pCi/I HTO U3-4 U3 Condensate Polisher NDIHTO U3-T1 U3 South Turbine 563 pCi/I HTO U3-T2 U3 North Turbine 1,640 pCi/I HTO MH-6 Transformer Yard 51,300 pCi/I HTO 11/18/05 MW-111 Transformer Yard 171,000 pCi/I HTO U3-1 U3 Discharge Canal NDIHTO U3-2 U3 Discharge Canal ND/IHTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,130 pCiA HTO 11/22/05 MW-111 Transformer Yard 180,000 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc 7 Page 2 of 11,11-1

--- I,, I -, -__ , ." ., --... ... ---1 11-111-111"",--, -iiiiffi__ , , "So-'r' ... C-6, --, b -a- t- 6 -J... an i",2",,6"""2"0"0-6,-.--do"c,', Page 31 Stac Smith ---~ ..... " _-- -wexcum~rb Dat_Ja_26_2006.doc Page_ _ __... _6......._

_,___,- 3 ----On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6 th 12/02/05 MW-l1l Transformer Yard 125,000 pCiVI HTO MW-38 End of IP-3 Discharge Canal Concrete ND/HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine- 498 pCi/I HTO U3-T2 U3 North Turbine 1,130 pCi/I HTO 12/5/05 MW-38 End of IP-3 Discharge Canal Concrete ND/HTO 12/6/05 MW-38 End of IP-3 Discharge Canal Concrete ND/HTO 12/8/05 MW-101 U2 Warehouse ND/HTO MW-101 U2 Warehouse ND Sr-90 Teledyne MW-105 Maintenance Training ND/HTO MW-105 Maintenance Training ND Sr-90 Teledyne MW-107 NEM ND/HTO MW-107 NEM ND Sr-90 Teledyne MW-38 End of IP-3 Discharge Canal Concrete 985 pCi/I HTO MW-38 End of IP-3 Discharge Canal Concrete 701 pCi/I HTO DEC MW-38 End of IP-3 Discharge Canal Concrete ND Sr-90 Teledyne 12/08/05 MW-l1l Transformer Yard 270,000 pCi/I HTO MH-3 North of IP-2 Turb. 894 pCi/I HTO MH-5 Transformer Yard 2,020 pCill HTO MH-6 Transformer Yard 37,100 pCi/i HTO MW-38 End of IP-3 Discharge Canal Concrete 985 pCi/I HTO MW-101 EOF 701 pCi/I HTO DEC MW-101 EOF ND/HTO MW-105 Maint. Train. Facil ND/HTO DEC MW-105 Maint. Train. Facil ND/HTO MW-107 NEM Well 96 pCi/I HTO DEC MW-107 NEM Well ND/HTO 12113/05 MW-34 Transformer Yard 63,900 pCiAi HTO MW-35 Transformer Yard 42,300 pCi/I HTO 12/15/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 399 pCi/I HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,290 pCi/I HTO MW-33 Transformer Yard 142,000 pCi/I HTO MW-111 Transformer Yard 296,000 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc 7 Page 3 of

"' 6 _s, u, m, --S 6'r, _t b, y-, -, -D, -a" i _e, ....... .J, , "a' _n, , , , , 2-6 d , , d", o, c Page Stacy Smith ,-,rn-exesum o, yat_Jan X~_I- _26_20.....06.-doc

-~_ -----__--1-1,-1 I.. ..... ,,_ Pag 4 On-Site Monitoring Wells Sorted by Date Executive Summary January 261h 12/16/05 MH-19 Transformer Yard 1,800 pCi/Q HTO MH-18 Transformer Yard 854 pCi/l HTO MH-17 Transformer Yard 1,710 pCi/l HTO MH-10 Transformer Yard 2,940 pCi/l HTO MH-9 Transformer Yard 2,140 pCi/l HTO MH-8 Transformer Yard 4,510 pCi/I HTO MH-6 Transformner Yard 12,200 pCi/l HTO MH-4 Transformer Yard 4,320 pCi/l HTO MH-2 North of IP-2 Turb 651 pCi/l HTO 12/19/05 MW-33 Transformer Yard 199,000 pCi/l HTO MW-34 Transformer Yard 121,000 pCi/I HTO MW-35 Transformer Yard 76,000 pCi/A HTO MW-111 Transformer Yard 192,000 pCi/l HTO MH-3 North of IP-2 Turb. 2,330 pCi/l HTO MH-5 ABFP Bldg).. 6,920 pCi/l HTO MH-7 Transformer Yard 5,340 pCi/l HTO 12/19/05 Discharge Hudson River <MDA pCi/l HTO Canal 12/20/05 MH4-3 ',-Outside of Turbine Bldg. 2,330 pCill HTO MH-S Aux Feed Bldg. 6,920 pCi/l HTO 12/21/05 MH-4A Condensor Tube Pull Pit 2,730 pCi/I HTO MH-I River Front Dry -No Sample Taken 12/29/05 MW-l1l MOB 212,000 pCi/I HTO MW-33 Transformer Yard 220,000 pCi/l HTO MW-34 Transformer Yard 147,000 pCi/I HTO MW-35 Transformer Yard 80,500 pCi/I HTO 12/30/05 MW-31 MOB 4,060 pCi/l HTO U3-1 U3 Discharge Canal 651 pCi/l HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HrO U3-4 U3 Discharge Canal 442 pCi/l HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,690 pCi/I HTO MW-31 Outside MOB 4,060 pCi/l HTO MW-38 End of IP-3 Discharge Canal Concrete ND/HTO, mwexecsummSort-byDateJan_26_2006.doc 7 Page 4 of


I,,--,',', 1-11 ----- ---'- .....-- ----,-_--, j, -_ __-'-"'_""'-"'__'

I an-26-2006.doc Page 5 j Stacy~K Smith , mw_execsumm

-- --or---b-- -ate I Ja_6_06.o Page 5 1--11111-

-, On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6 th 1/4/06 MH-2A CB-4 CB12 CB-24 MH-1 MH-2 MH-3 MH-4 MH-4A MH-5 MH-6 MH-7 MH-8 MH-12 MH-14'I I By IP-2 EDG By IP-2 RWST 3 South U1 Superheater

,,By IP-2 Security Bldg.3 North of IP-2 Turb. Bldg.North of IP-2 Turb. Bldg.North of IP-2 Turb. Bldg 4Between Turb. & A B)P-2 Cond. Tub Pit JIP-2 ABFP Bldg'IP-2 Transformer Yard IP-2 Transformer Yard IP-2 Transformer Yard North End IP-2 Turb.North End IP-2 Turb.ND/HTO 1,010 pCi/l HTO ND/HTO 822 pCi/i HTO ND/HTO ND/HTO 3,450 pCi/l HTO 3,070 pCi/I HTO 3,380 pCi/l HTO 3,480 pCi/i HTO 13,100 pCi/I HTO 8,140 pCi/l HTO 5,740 pCi/l HTO ND/HTO ND/HTO A4 1/5/06 MW-31 MOB 3,050 pCi/l HTO 1/6/06 MW-l1l Transformer Yard 113,740 pCi/I HTO MW-33 Transformer Yard 189,000 pCi/i HTO MW-34 Transformer Yard 159,000 pCi/i HTO MW-35 Transformer Yard 95,400 pCi/i HTO MW-38 End of IP-3 Discharge Canal Concrete 1,018 pCi/l HTO U3-T2 U3 North Turbine 2,417 pCi/I HTO 1/10/06 MW-31 Outside MOB 4,030 pCi/l HTO 1-11-06 SD A2 East of IP-3 PAB ND/HTO SD A4 East of A2 South of A3 ND/HTO SD B 1 IP-3 Trans Yard 4,530 pCi/l HTO SD B3 IP-3 Trans Yard 6,280 pCi/i HTO SD B4 West U3 VC East Turb 3,180 pCi/I HTO SD B5 North IP-3 Turb IP-3 VC 5,200 pCi/lH TO SD B7 North IP-3 Turb Hall 2,510 pCi/l HTO SD Cl West of IP-3 Admin Bldg 997 pCi/l HTO SD D2 .South IP-3 Admin Bldg ND/HTO 1/12/06 MW-32 Between PAB & FSB 3,720 pCi/l HTO U3-1 U3 Discharge Canal 744 pCi/l HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 573 pCi/l HTO U3-T1 U3 South Turbine 787 pCi/l HTO U3-T2 U3 North Turbine 1,780 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc 7 Page 5 of y mith -mwexecsummSort by Date-Jan-26-2006.doc 1-1 ---1111-1-1-1

-1 1-1--l" I,--- I', ----I,--- --1 I__ --- -11, ---__ ---,--K Pa9qAI Stacy Smith -mwexecsummSorLbyDateJan_26_2006.doc Page 6:j On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6 th 1-13-06 MW-111 Transformer Yard 199,000 pCi/l HTO MW-33 Transformer Yard 232,000 pCi/l HTO MW-34 Transformer Yard 131,000 pCi/l HTO MW-35 Transformer Yard 97,800 pCi/I HTO 1-13-06 MH-13 IP-2 East of MH-12 ND/HTO MH-15 North east of MH-14 South IP-i Super ND/HTO CB-12 Heater 849 pCi/I HTO CB-13 South IP-1 Super Heater 856 pCi/I HTO CB-14 West of CB-13 734 pCi/I HTO CB-15 U2 North of MH-14 ND/HTO CB-19 South MH-14 ND/HTO 1/17/06 SD Bi Trans Yard IP-3 5,010 pCi/l HTO SD B3 Trans Yard IP-3 4,650 pCi/l HTO SD B4 North U3 Turb'& VC 3,430 pCi/l HTO SD B6 North IP-3 Turb. ND/HTO SD B7 North U3 Turb 2,690 pCi/I HTO SD Cl West U3 Admin 867 pCi/l HTO SD D2 South U3 Admin ND/HTO SD E4 South End Admin & road ND/HTO SD E4A SE End U3 Admin South of road ND/HTO SD E5 SW End Admin & South of Road ND/HTO SD E5A SE End U3 Admin South of road ND/HTO SD E6 SW U3 Admin South of Road ND/HTO SD E7 West U3 Admin by Disch Canal ND/HTO 1/19/06 CB-12 South IP-1 Super Heater 849 pCi/i HTO CB-15 South Ul Screen Structure 959 pCi/l SD A2 East of IP-3 PAB ND/HTO SD A6 West of U3 WH-U Tank Pad 686 pCi/l SD El South East Road way ND/HTO SD E2 South East Road way ND/HTO SD E2B South East Road way ND/HTO SD E3 South of Admin & north of road ND/HTO SD E3A South of Admin in road ND/HTO MH-2 River Front ND/HTO MH-3 North of IP-2 Turbine Building 2,240 pCi/I MH4 Transformer Yard 3,780 pCi/l MH-5 ux Feed Bldg3 3,570 pCi/l MH-6 aransformer Yard 18,600 pCi/I MH-7 Transformer Yard 3,840 pCi/i MH-12 West of IP-2 Turb. Bldg. by river ND/HTO MH-14 North End IP-2 Turb. 1,310 pCi/l mwexecsummSort-byDate_Jan_26_2006.doc 7 Page 6 of Ftac Smth-- mweesMm Sort_bv_Date_Jan_26_2006.doc Page 7 J.=. ,* a>* .. K < As, .= ..z:EMuE.u<.

= .g< ................................................

....,.m,.<= ..vvYe Stacy Smith -

Page 7 On-Site Monitoring Wells Sorted by Date Executive Summary January 26'Monitoring Wells I Locations Off-Site Date Location Results 10/18/05 Croton Reservoir ND/HTO -Gamma Camp Field Reservoir ND/HTO -Gamma 10/20/05 Gypsum Outfall ND/HTO -Gamma Algonquin NDIHTO -Gamma 5' Street Well ND/HTO -Gamma 10/25/05 Rock Quarry ND/HTO -Gamma 11/8/05 5' Street Well NDIHTO -Gamma 11/30/05 Gypsum Outfall

  • NDJHTO 11/30/05 Algonquin
  • NDHITO 5' Street Well
  • ND/HTO Rock Quarry
  • NDIHTO Croton Reservoir NDIHTO Camp Field Reservoir NDIHTO 12/6/05 Gypsum Plant Well #1 NDIHTO Gypsum Plant Well #2 NDJHTO 12/13/05 Algonquin Outfall ND/HTO Gypsum Outfall ND/ITO Rock Quarry ND/HTO* Environmental levels only of HTO & Sr-90 from 11/30/05 DEC Split samples mwexecsummSort-by-DateJan_26_2006.doc 7 Page 7 of 1 111 -111.11 I- I- I -11 I -11 I ----I -11, ... .... --11,11,11-I---

b,_y'_"'_W_,_,"eIIJa'n"'

'2,,_6"_"_2,_0_0,6_.doc_, Page 1 g[Sac Smith----111 ,X-,-1"- ~, ~I-1 I m-x sm ~ orb~ I -- , I-_Ja---n_26_-2_006.doc'_"-

.. .. " .- ._,___ _ Pag 1 .On-Site Monitoring Wells Sorted by Well Location ExecLItive Summary January 26 th Man-holes (Storm Drains)ID Date Location Sample Results MH-1 12/21/2005 North of IP-2 Turb. Bldg. by Too dry to sample 1/04/2006 Water ND/HTO MH-2 12/16/2005 River Front 651 pCi/I (IPEC)1/4/2006 ND/HTO 1/19/2006 ND/HTO MH-2A 1/4/2006 'By IP-2 EDG G ND/HTO MH-3 11/10/2005 North of IP-2 Turbine Building 1,950 pCi/i 12/8/2005 894 pCi/i 12/20/2005 2,330 pCi/i 1/4/2006 3,450 pCi/I 1/19/2006 2,240 pCi/I MH-4 12/16/2005 Transformer Yard 4,370 pCi/l 1/4/2006 3,070 pCi/i 1/19/2006 3,780 pCi/I MH-4A 12/21/2005 IP-2 Condenser Tube removal pit 2,730 pCi/i 1/4/2006 3,380 pCi/I MH-5 11/10/2005 Xux Feed Bldg 2,390 pCi/I 12/8/2005 2,020 pCi/I 12/20/2005 6,920 pCi/l 1/4/2006 3,480 pCi/i 1/19/2006 3,570 pCi/i MH-6 11/10/2005 Transformer Yard 51,300 pCi/i 12/8/2005 37,100 pCi/i 12/16/2005 12,200 pCi/I 1/4/2006 13,100 pCi/l 1/19/2006 18,600 pCi/I MH-7 12/19/2005 Transformer Yard 5,340 pCi/l 1/4/2006 8,140 pCi/i 1/19/2006 3,840 pCi/I MH-8 12/16/2005 Transformer Yard 4,510 pCi/l 1/4/2006 5,740 pCi/l 1/19/2006 3,210 pCi/I MH-9 12/16/2005 MOB Hill -80' 2,140 pCi/I MH-10 12/16/2005 MOB Hill -80' 2,940 pCi/i MH-12 1/4/2006 West of IP-2 Turb. Bldg. by river ND/HTO 1/13/2006 ND/HTO 1/19/2006 ND/HTO MH-14 1/4/2006 North End IP-2 Turb. ND/HTO 1/19/2006 1,310 pCi/l 5Q.a.CIM 11 f %&aVI Lt mwexecsummSort-byWellJan_26_2006.doc Page I of 8 m Sort by Welijan 26 I[--- I -6 Paqe 219 Stacy Smith -mwexecsummSorLbyWellJan_26_2006.doc Pa On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MH-15 1/13/2006 IP-2 North east of MH-14 ND/HTO MH-17 12/16/2005 Transformer Yard 1,710 pCi/I MH-18 12/16/2005 Transformer Yard 854 pCi/i MH-19 12/16/2005 Transformer Yard 1,800 pCi/i MH-A4 10/18/2005 IP-3 Manhole Located east of the ND/HTO IP-3 Monitor Tank MH-B8 10/18/2005 IP-3 Manhole located west of the 959 pCi/I north end of the IP-3 turbine hall over the discharge canal CB-4 1/4/2006 By IP-2 RWST _ 1,010 pCill CB-12 1/13/2006 South IP-1 Super Heater 849 pCi/I HTO CB-13 1/13/2006 South IP-1 Super Heater 856 pCi/l HTO CB-14 1/13/2006 West of CB-1 3 734 pCi/I HTO CB-15 1/13/2006 South U1 Screen Structure ND/HTO 1/19/2006 959 pCi/I CB-19 1/13/2006 South MH-14 ND/HTO CB-24 1/4/2006 jy IP-2 Sec. Bldg. 822 pCi/i SD A2 1/11/2006 East of IP-3 PAB ND/HTO 1/19/2006 ND/HTO SD A4 1/11/2006 East of A2 south A3 ND/HT 1/19/2006 1,190 pCi/I SD A6 1/19/2006 West of U3 WHU Tank Pad 686 pCi/I SD B 1 1/11/2006 Trans Yard 1P-3 4,530 pCi/i 1/17/2006 5,010 pCi/I SD B3 1/11/2006 Trans Yard IP-3 6,280 pCi/i 1/17/2006 4,650 pCi/I SD B4 1/11/2006 North U3 Turb & VC 3,180 pCi/i 1/17/2006 3,600 pCi/I SD B5 1/11/2006 North U3 Turb & VC 5,200 pCi/i 1/19/2006 3,320 pCi/l SD B6 1/17/2006 North 1P-3 Turb. ND/HTO SD B7 1/11/2006 North U3 Turb 2,510 pCi/i 1/17/2006 2,690 pCi/I SD B8 1/17/2006 North U3 Turb. By Disch Canal ND/HTO SD Cl 1/11/2006 West U3 Admin 997 pCi/l 1/17/2006 867 pCi/I F4 "I mwexecsummSort-byWellJan_26_2006.doc Page 2 of 8


I- .-

-- -I..--,--

--I I I ---- =_ 111 ---I__, mw execsumm Sort bv Well Jan 26 2006.doc Paqe 3 4 I Stacy Smith -mw execsummSorLbyWellJan_26_2006.doc Page On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th SD D2 1/11/2006 South U3 Admin ND/HTO 1/17/2006 ND/HTO SD El 1/19/2006 South East Road way ND/HTO SD E2 1/19/2006 South East Road way ND/HTO SD E2B 1/19/2006 South East Road way ND/HTO SD E3 1/19/2006 South of Admin & north of road ND/HTO SD E3A 1/19/2006 South of Admin in road ND/HTO SD E4 1/17/2006 South End Adrmin & road ND/HTO SD E4A 1/17/2006 SE End U3 Admin South of road ND/HTO SD E5 1/17/2006 SW End Admin & South of Road ND/HTO SD E5A 1/17/2006 SW U3 Admin in Road ND/HTO SD E6 1/17/2006 SW U3 Admin South of Road ND/HTO SD E7 1/17/2006 West U3 Admin by Disch Canal ND/HTO ID Date Location Sample Results MW-30 11/22/2005 SB Leakage Areaoote:

Well 464, 000 to 600, 000 pCi/l development NOT completed HTO MW-31 12/30/2005 Outside MOB 4,060 pCi/l HTO 1/5/2006 3,050 pCi/I HTO 1/10/2006

_ 4,030 pCi/l HTO MW-32 1/12/2006 Between FSB & PAB_ 3,720 pCiAI HTO -Raw Water MW-33 12/15/2005 Transformer Yard 142,000 pCi/l HTO 12/19/2005 199,000 pCi/l HTO 12/29/2005 220,000 pCi/l HTO 01/06/2006 189,000 pCi/i HTO 1/13/2006 232,000 pCi/I HTO MW-34 12/13/2005 Transformer Yard 63,900 pCi/l HTO 12/19/2005 121,000 pCi/l HTO 12/29/2005 147,000 pCi/I HTO 1/2006/2006 159,000 pCi/l HTO 1/13/2006 131,000 pCi/l HTO MW-35 12/13/2005 Transformer Yard 42,300 pCi/I HTO 12/19/2005 76,000 pCi/I HTO 12/29/2005 80,500 pCi/l HTO 1/6/2006 95,400 pCi/l HTO_ 1/13/2006 97,800 pCi/l HTO beffv&II!rT mwexecsummSort-byWellJan_26_2006.doc Page 3 of 8 ith -mw execsurnm Sort by Well Jan 26 2006.doc

__ -, --,", -__ " "-- --- ----Pag '4"J..'t1 I Stacy Smith -mwexecsummSorLbyWellJan_262006.doc Paae 4]On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th ID Date Location Sample Results MW-38 12/5/2005 End of IP-3 Discharge Canal ND/HTO 12/6/2005 Concrete ND/HTO 12/8/2005 985 pCi/l IPEC 12/8/2005 701 pCi/l NYSDEC 12/8/2005 ND SR-90 Teledyne 12/30/2006 ND/HTO 1/10/2006 1,008 pCi/l IPEC ID Date Location Sample Results MW- 11 9/28/2005 Transformer Yard 212,000 pCi/l HTO 10/5/2005 188,000 pCi/l HTO 10/7/2005 188,000 pCi/l HTO 10/14/2005 6820 pCi/l HTO(rain)10/14/2005 6320 pCi/l HTO (back-up)10/21/2005 284,000 pCi/l HTO 10/21/2005 267,000 pCi/l HTO DEC 10/28/2005 218,000 pCi/l HTO 11/4/2005 302,000 pCi/l HOT 11/10/2005 246,000 pCi/l HTO 11/18/2005 171,000 pCill HTO 11/22/2005 180,000 pCi/l HTO 12/02/2005 125,000 pCi/l HTO 12/08/2005 270,000 pCi/l HTO 12/15/2005 296,000 pCi/l HTO 12/19/2005 192,000 pC/I HTO 12/29/2005 212,000 pC/I HTO 1/6/2006 113,000 pC/I HTO 1/13/2006 199,000 pC/l HTO ID Date Location Sample Results MW-101 12/8/2005 U2 Warehouse ND/HTO 12/8/2005 ND/HTO DEC 12/8/2005 ND Sr-90 Teledyne mwexecsummSort-byWell_Jan_26_2006.doc Page 4 of 8 9_1-I-I--._-- , 1. ., , , .... ..X- __ r ---1 --_1,1--_ I--- I.,-rnw-execsymm-Sort by Well-Jan 26-2006.doc Page 51 Stacy Smith -mwexecsummSorLbyWellJan_26_2006.doc Page 5 I On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MW-105 12/8/2005 Mtce. Training ND/HTO 12/8/2005 96 pCi/I DEC 12/8/2005 ND Sr-90 Teledyne MW-107 9/28/2005 NEM ND/HTO 12/8/2005 ND/HTO 12/8/2005 ND/HTO DEC 12/8/2005 ND Sr-90 Teledyne MW-108 9/29/2005 GT-1 ND/HTO 11/3/2005 ND/HTO MW-109 9/28/2005 GT-1 ND/HTO 11/04/2005 ND/HTO ID Date Location Sample Results U3- 1 10/6/2005 U3 Discharge Canal 417 pCi/I HTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HTO 12/30/2005 ND/HTO 1/12/2006 ND/HTO U3-2 10/6/2005 U3 Discharge Canal 960 pCi/l HTO 10/21/2005 ND/HTO 10/21/2005 512 pCi/l HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HTO 12/30/2005 ND/HTO 1/11/2006 ND/HTO mwexecsummSort-by-WellJain_26_2006.doc Page 5 of 8 Stay',Sm,,h

,------ IIJ2 _ .P g 6 X~StcSmth -mw oexemmSok Well Jan 262006.doc Page 6,1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th U3-3 10/6/2005 U3 Discharge Canal 439 pCi/I HTO 10/21/2005 ND/HTO 10/21/2005 ND/HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 471 pCi/I HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HT 12-30-05 ND/HTO 1/11/2006 ND/H-T0 U3-4 10/16/2005 U3 Condensate Polisher 406 pCi/I HTO 10/21/2005 399 pCi/I HTO 10/21/2005 344 pCi/I HTO DEC 10/28/2005 405 pCi/I HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HT0 12/2/2005 ND/HTO 12/15/2005 399 pCi/I HTO 12-30-05 442 pCi/I HTO 1/12/2006 573 pCi/l HTO U3-T1 10/6/2005 U3 South Turbine 703 pCi/I HTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 563 pCi/i HTO 11/18/2005 ND/HTO 12/2/2005 498 pCi/i HTO 12/15/2005 ND/HT0 12-30-05 529 pCi/i HTO 1/12/2006

__ _ _ _ _ _ _ _ _ _ _ _ _ 786 p Ci/I HTO mwexecsummSort-byWellJa.n_26_2006.doc Page 6 of 8 StacV Smith -mwexecsummSor(_bvWe11 Jan-26-2006.doc

...-___ __-- =111e-11111-

-.- 11,1- , --1___.-11____

____ ___Stacy Smith -mwexecsummSorLbyWellJan_26_2006.doc Page 7:1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th U3-T2 10/7/2005 10/21/2005 10/21/2005 10/28/2005 11/4/2005 11/10/2005 11/18/2005 12/2/2005 12/15/2005 12/30/2005 1/06/2006 01/12/2006 U3 North Turbine 1,590 pCi/I HTO 1,470 pCi/i HTO 1,420 pCi/ HTO DEC 1,280 pCi/i HTO 1,190 pCi/i HTO 1,640 pCi/I HTO 1,130 pCi/I HTO 1,329 pCi/I HTO 1,290 pCi/I HTO 1,685 pCi/I HTO 2,417 pCi/I HTO 1,776 pCi/ lHTO ID Date Location Sample Results Well-I 12/06/2005 Lafarge Property.

North East ND/HTO 12/06/2005 Well -Farthest from river NDJHTO DEC 12/06/2005 ND SR-90 Teledyne Well-3 12/06/2005 Lafarge Property.

North West ND/HTO 12/06/2005 Well -closest to river ND SR-90 Teledyne 12/06/2005 ND/HTO DEC mwexecsummSort-by-WellJan_26_2006.doc Page 7 of 8

Stacy Smith -mw-execsumm=Sort-byWellJan_26_2006.doc

.Page 81 Stacy -- Smith mw execsu..mm

-II 11-1 or -by1--1ell-_Ja--n_2I6_2006.d-oc Page 811--~ --- -- -- -On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MW-1l1, MW-33, MW-34 & MW-35 Tritium 350,000 300,000 250,000 R 8 200,000 E E 150,000 100,000 50,000 0-*- MW-lll pCi HTO rAW-33 pCVI HTO MW-34 pCO HTO-ir- MW-35 pCVI HTO L 0O8 010(0LO(0(0LO I LO I M (0 (0 0 ~0 0 0 0 C 0 Date mwexecsummSort_byWellJan_26_2006.doc Page 8 of 8