ML061320542

From kanterella
Jump to navigation Jump to search
E-mail from G. Bowman of USNRC to S. Smith of USNRC, Regarding Executive Summaries
ML061320542
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/15/2006
From: Gregory Bowman
Entergy Nuclear Operations
To: Shawn Smith
NRC/FSME
References
FOIA/PA-2006-0140
Download: ML061320542 (17)


Text

Stacy Smith FW: 6iv 6 -guriA'a6e"iS--1..I-I~

ay Sih F--:E----

e ui eS 1-,1-maIe-~-,- -11 11 111,--I 1-- .- -X--=-1.1 Pag -11 From: "Bowman, Greg " <GBowm90@entergy.com>

To: "'sms4@nrc.gov"' <sms4@nrc.gov>

Date: 3/15/06 8:28AM

Subject:

FW: Executive Summaries From: Croulet, Donald Sent: Thursday, January 26, 2006 12:16 PM To: Janicki, John; 'James Noggle'; 'Timothy Rice'; PRICE, ERNEST JR; Robert Oliveira (boliveira@ amnucins.com) <mailto:boliveira@amnucins.com)>; Cox, Mark R; Bowman, Greg

Subject:

FW: Executive Summaries fyi From: Lavera, Ron Sent: Thursday, January 26, 2006 11:15 AM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; ERNEST PRICE; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Robert Oliveira; Ron Lavera; Ronald Sachatello; T. R. Jones; Thomas Burns

Subject:

Executive Summaries Please see the attached sample executive summaries.

Ron <<mwexecsummSort-byDateJan_26_2006.doc>>

<<mwexecsummSortby_WellJan_26_2006.doc>>

RLaVera entergy.com <mailto:RLaVera©entergy.com>

914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308

c!:\ternP\G}QO0TMP--I 1111----1-1111- Page Mail Envelope Properties (4418167A.027: 1: 57383)

Subject:

FW: Executive Summaries Creation Date: 3/15/06 8:27AM From: "Bowman, Greg " <GBowm90@entergy.com>

Created By: GBowm90@entergy.com Recipients nrc.gov kpl-po.KPDO SMS4 (Stacy Smith)

Post Office Route kpl-po.KP.DO nrc.gov

]Files Size Date & Time MESSAGE 1348 03/15/0 5 08:27AM TEXT.htm 3635 mwexecsummSort_byvDate Jan_26_2006.doc 142336 mwexecsumm__Sortby-WellJan_26_2006.doc 218624 Mime.822 501770 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard

I. --- __

'Stacv ' I--- mw Smith 1-11-execsumm- I1wIZ,

- , ISort, Z'

- e'ypa

- -- - --- - I1-1-1 I - ,

"qO _q.doc Page 1 4 Stacy Smithr .....

->9mw eesusSmmSo,__..r.....by,,...,.

,= =006;.,o

,_Ja_ .,,.,,26.

_:at,,,,,___e Pag 1,.....

On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6 th Date ID Location Sample Results 9/28- MW-107 NEM ND/HTO 29/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO MW-111 Transformer Yard 212,000 pCi/l HTO 10/5/05 MW-111 Transformer Yard 188,000 pCi/l HTO 10/6/05 U3-1 U3 Discharge Canal 417 pCi/l HTO U3-2 U3 Discharge Canal 960 pCi/I HTO U3-3 U3 Discharge Canal 439 pCi/l HTO 10/7/05 U3-T1 U3 South Turbine 703 pCiIl HTO U3-T2 U3 North Turbine 1,590 pCi/I HTO MW-111 Transformer Yard 188,000 pCi/I HTO 10/14/05 MW-111 Transformer Yard 6,820 pCi/I HTO (rain)

MW-111 Transformer Yard 6,320 pCi/I HTO (back-up) 10/16/05 U3-4 U3 Condensate Polisher 406 pCi/A HTO 10/18/05 MH-B8 IP-3 Manhole IP-3 Disch Canal 959 pCi/I HTO East of IP-3 Monitor Tank MH-A4 ND/HTO 10/21/05 MW-111 Transformer Yard 284,000 pCill HTO 267,000 pCi/I HTO DEC 10/21/05 U3-1 U3 Discharge Canal ND/HTO U3-1 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal 512 pCi/I HTO DEC U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 399 pCi/I HTO U3-4 U3 Condensate Polisher 344 pCi/I HTO DEC U3-T1 U3 South Turbine ND/HTO U3-T1 U3 South Turbine ND/HTO DEC U3-T2 U3 North Turbine 1,470 pCi/l HTO U3-T2 U3 North Turbine 1,420 pCi/I HTO DEC mwexecsummSort-byDateJan_26_2006.doc Page 1 of 7

~ ~

- - ",V,-VI---- -- - ~_- ~-- ~Y -- - ~ . ...

-~. , - -

,do- -. 111-11 Page 2,.1 Page 2 Stacy Smith mwexecsummSorLbyDateJan26_2006.doc On-Site Monitoring Wells Sorted by Date Executive Sununary January 26 th 10/28/05 MW-l1l Transformer Yard 218,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal NDI/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-T1 U3 South Turbine NDIHTO U3-T2 U3 North Turbine 1,280 pCi/I HTO 11/4/05 MW-111 Transformer Yard 302,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal NDIHTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO Date ID Location Sample Results 11/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/05 MW-111 Transformer Yard 246,000 pCi/I HTO U3-1 U3 Discharge Canal NDIHTO U3-2 U3 Discharge Canal NDIHTO U3-3 U3 Discharge Canal 471 pCi/I HTO U3-4 U3 Condensate Polisher NDIHTO U3-T1 U3 South Turbine 563 pCi/I HTO U3-T2 U3 North Turbine 1,640 pCi/I HTO MH-6 Transformer Yard 51,300 pCi/I HTO 11/18/05 MW-111 Transformer Yard 171,000 pCi/I HTO U3-1 U3 Discharge Canal NDIHTO U3-2 U3 Discharge Canal ND/IHTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,130 pCiA HTO 11/22/05 MW-111 Transformer Yard 180,000 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc Page 2 of 7

11,11-1

---I,, I-, - __, ." . , -- ...... - - -111-111-111""

iiiiffi__ w_6x-6ecsumn , , "So-'r'...

C-6, --,b-a-t J...an i",2",,6"""2"0"0-6,-.--do"c,', Page 31 Stac Smith - wexcum~rb

--- ~ ....." _-- Dat_Ja_26_2006.doc _ __... _6......._ _,___,- Page_ 3 On-Site Monitoring Wells Sorted by Date Executive Summary January 26th 12/02/05 MW-l1l Transformer Yard 125,000 pCiVI HTO MW-38 End of IP-3 Discharge Canal Concrete ND/HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine- 498 pCi/I HTO U3-T2 U3 North Turbine 1,130 pCi/I HTO 12/5/05 MW-38 End of IP-3 Discharge Canal Concrete ND/HTO 12/6/05 MW-38 End of IP-3 Discharge Canal Concrete ND/HTO 12/8/05 MW-101 U2 Warehouse ND/HTO MW-101 U2 Warehouse ND Sr-90 Teledyne MW-105 Maintenance Training ND/HTO MW-105 Maintenance Training ND Sr-90 Teledyne MW-107 NEM ND/HTO MW-107 NEM ND Sr-90 Teledyne MW-38 End of IP-3 Discharge Canal Concrete 985 pCi/I HTO MW-38 End of IP-3 Discharge Canal Concrete 701 pCi/I HTO DEC MW-38 End of IP-3 Discharge Canal Concrete ND Sr-90 Teledyne 12/08/05 MW-l1l Transformer Yard 270,000 pCi/I HTO MH-3 North of IP-2 Turb. 894 pCi/I HTO MH-5 Transformer Yard 2,020 pCill HTO MH-6 Transformer Yard 37,100 pCi/i HTO MW-38 End of IP-3 Discharge Canal Concrete 985 pCi/I HTO MW-101 EOF 701 pCi/I HTO DEC MW-101 EOF ND/HTO MW-105 Maint. Train. Facil ND/HTO DEC MW-105 Maint. Train. Facil ND/HTO MW-107 NEM Well 96 pCi/I HTO DEC MW-107 NEM Well ND/HTO 12113/05 MW-34 Transformer Yard 63,900 pCiAi HTO MW-35 Transformer Yard 42,300 pCi/I HTO 12/15/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 399 pCi/I HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,290 pCi/I HTO MW-33 Transformer Yard 142,000 pCi/I HTO MW-111 Transformer Yard 296,000 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc Page 3 of 7

Smith Stacy

"' 6_s,u,m m,- -S6'r,_t b,y-,

o, yat_Jan

,-,rn-exesum

-,-D,

-a" i_e,.......

.J,,"a'

_n,,,,2-6 d X~_I-_26_20.....06.-doc 6,_

,,d",

o,c

- ~_ - ---- __--1-1,-1 I.. ..... ,,_ Page Pag 4 On-Site Monitoring Wells Sorted by Date Executive Summary January 261h 12/16/05 MH-19 Transformer Yard 1,800 pCi/QHTO MH-18 Transformer Yard 854 pCi/l HTO MH-17 Transformer Yard 1,710 pCi/l HTO MH-10 Transformer Yard 2,940 pCi/l HTO MH-9 Transformer Yard 2,140 pCi/l HTO MH-8 Transformer Yard 4,510 pCi/I HTO MH-6 Transformner Yard 12,200 pCi/l HTO MH-4 Transformer Yard 4,320 pCi/l HTO MH-2 North of IP-2 Turb 651 pCi/l HTO 12/19/05 MW-33 Transformer Yard 199,000 pCi/l HTO MW-34 Transformer Yard 121,000 pCi/I HTO MW-35 Transformer Yard 76,000 pCi/AHTO MW-111 Transformer Yard 192,000 pCi/l HTO MH-3 North of IP-2 Turb. 2,330 pCi/l HTO MH-5 ABFP Bldg).. 6,920 pCi/l HTO MH-7 Transformer Yard 5,340 pCi/lHTO 12/19/05 Discharge Hudson River <MDA pCi/l HTO Canal 12/20/05 MH4-3 ',-Outside of Turbine Bldg. 2,330 pCill HTO MH-S Aux Feed Bldg. 6,920 pCi/l HTO 12/21/05 MH-4A Condensor Tube Pull Pit 2,730 pCi/I HTO MH-I River Front Dry - No Sample Taken 12/29/05 MW-l1l MOB 212,000 pCi/I HTO MW-33 Transformer Yard 220,000 pCi/l HTO MW-34 Transformer Yard 147,000 pCi/I HTO MW-35 Transformer Yard 80,500 pCi/I HTO 12/30/05 MW-31 MOB 4,060 pCi/l HTO U3-1 U3 Discharge Canal 651 pCi/l HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HrO U3-4 U3 Discharge Canal 442 pCi/l HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,690 pCi/I HTO MW-31 Outside MOB 4,060 pCi/l HTO MW-38 End of IP-3 Discharge Canal Concrete ND/HTO, mwexecsummSort-byDateJan_26_2006.doc Page 4 of 7

- - - -I,,--,',', 1 - --- - -- '- ....-- - - -- ,

I Stacy~K Smith ,mw_execsumm

-- - -or---b-- j,

-_--,-ate I -___-'-"'_""'-"'__'

an-26-2006.doc Ja_6_06.o -,

Page 5 j Page 5 1--

On-Site Monitoring Wells Sorted by Date Executive Summary January 2 6th 1/4/06 MH-2A By IP-2 EDG ND/HTO CB-4 'I By IP-2 RWST 3 1,010 pCi/l HTO CB12 South U1 Superheater ND/HTO CB-24 I ,,ByIP-2 Security Bldg.3 822 pCi/i HTO MH-1 North of IP-2 Turb. Bldg. ND/HTO MH-2 North of IP-2 Turb. Bldg. ND/HTO MH-3 North of IP-2 Turb. Bldg 3,450 pCi/l HTO MH-4 4Between Turb. & A B 3,070 pCi/I HTO MH-4A )P-2 Cond. Tub Pit 3,380 pCi/l HTO MH-5 A4 JIP-2 ABFP Bldg' 3,480 pCi/i HTO MH-6 IP-2 Transformer Yard 13,100 pCi/I HTO MH-7 IP-2 Transformer Yard 8,140 pCi/l HTO MH-8 IP-2 Transformer Yard 5,740 pCi/l HTO MH-12 North End IP-2 Turb. ND/HTO MH-14 North End IP-2 Turb. ND/HTO 1/5/06 MW-31 MOB 3,050 pCi/lHTO 1/6/06 MW-l1l Transformer Yard 113,740 pCi/I HTO MW-33 Transformer Yard 189,000 pCi/i HTO MW-34 Transformer Yard 159,000 pCi/i HTO MW-35 Transformer Yard 95,400 pCi/i HTO MW-38 End of IP-3 Discharge Canal Concrete 1,018 pCi/l HTO U3-T2 U3 North Turbine 2,417 pCi/I HTO 1/10/06 MW-31 Outside MOB 4,030 pCi/l HTO 1-11-06 SD A2 East of IP-3 PAB ND/HTO SD A4 East of A2 South of A3 ND/HTO SD B 1 IP-3 Trans Yard 4,530 pCi/lHTO SD B3 IP-3 Trans Yard 6,280 pCi/i HTO SD B4 West U3 VC East Turb 3,180 pCi/I HTO SD B5 North IP-3 Turb IP-3 VC 5,200 pCi/lHTO SD B7 North IP-3 Turb Hall 2,510 pCi/lHTO SD Cl West of IP-3 Admin Bldg 997 pCi/lHTO SD D2 .South IP-3 Admin Bldg ND/HTO 1/12/06 MW-32 Between PAB & FSB 3,720 pCi/lHTO U3-1 U3 Discharge Canal 744 pCi/lHTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 573 pCi/lHTO U3-T1 U3 South Turbine 787 pCi/l HTO U3-T2 U3 North Turbine 1,780 pCi/I HTO mwexecsummSort-byDateJan_26_2006.doc Page 5 of 7

-- -- - 1--l"I,--- I',-- ---I,--- - -1I__ - -- -11, - - - __-- - ,

1111-1-1-1 y mith - mwexecsummSort by Date-Jan-26-2006.doc 1-1 --K__ Pa9qAI Stacy Smith mwexecsummSorLbyDateJan_26_2006.doc Page 6:j On-Site Monitoring Wells Sorted by Date Executive Summary January 26th 1-13-06 MW-111 Transformer Yard 199,000 pCi/l HTO MW-33 Transformer Yard 232,000 pCi/l HTO MW-34 Transformer Yard 131,000 pCi/l HTO MW-35 Transformer Yard 97,800 pCi/I HTO 1-13-06 MH-13 IP-2 East of MH-12 ND/HTO MH-15 North east of MH-14 South IP-i Super ND/HTO CB-12 Heater 849 pCi/I HTO CB-13 South IP-1 Super Heater 856 pCi/I HTO CB-14 West of CB-13 734 pCi/I HTO CB-15 U2 North of MH-14 ND/HTO CB-19 South MH-14 ND/HTO 1/17/06 SD Bi Trans Yard IP-3 5,010 pCi/l HTO SD B3 Trans Yard IP-3 4,650 pCi/l HTO SD B4 North U3 Turb'& VC 3,430 pCi/l HTO SD B6 North IP-3 Turb. ND/HTO SD B7 North U3 Turb 2,690 pCi/I HTO SD Cl West U3 Admin 867 pCi/l HTO SD D2 South U3 Admin ND/HTO SD E4 South End Admin & road ND/HTO SD E4A SE End U3 Admin South of road ND/HTO SD E5 SW End Admin & South of Road ND/HTO SD E5A SE End U3 Admin South of road ND/HTO SD E6 SW U3 Admin South of Road ND/HTO SD E7 West U3 Admin by Disch Canal ND/HTO 1/19/06 CB-12 South IP-1 Super Heater 849 pCi/i HTO CB-15 South Ul Screen Structure 959 pCi/l SD A2 East of IP-3 PAB ND/HTO SD A6 West of U3 WH-U Tank Pad 686 pCi/l SD El South East Road way ND/HTO SD E2 South East Road way ND/HTO SD E2B South East Road way ND/HTO SD E3 South of Admin & north of road ND/HTO SD E3A South of Admin in road ND/HTO MH-2 River Front ND/HTO MH-3 North of IP-2 Turbine Building 2,240 pCi/I MH4 Transformer Yard 3,780 pCi/l MH-5 ux Feed Bldg3 3,570 pCi/l MH-6 aransformer Yard 18,600 pCi/I MH-7 Transformer Yard 3,840 pCi/i MH-12 West of IP-2 Turb. Bldg. by river ND/HTO MH-14 North End IP-2 Turb. 1,310 pCi/l mwexecsummSort-byDate_Jan_26_2006.doc Page 6 of 7

Ftac Smth-- mweesMm Sort_bv_Date_Jan_26_2006.doc Page 7 JI Page 7 Stacy Smith mwexecsummSorLbyDateJan_26_2006.doc

................................................ .... ,.m,.<= .. vvYe

. =. ,* a>* .. K< As, . = .. z:EMuE.u<. = .g<

On-Site Monitoring Wells Sorted by Date Executive Summary January 26' Monitoring Wells I Locations Off-Site Date Location Results 10/18/05 Croton Reservoir ND/HTO - Gamma Camp Field Reservoir ND/HTO - Gamma 10/20/05 Gypsum Outfall ND/HTO - Gamma Algonquin NDIHTO - Gamma 5' Street Well ND/HTO - Gamma 10/25/05 Rock Quarry ND/HTO - Gamma 11/8/05 5' Street Well NDIHTO - Gamma 11/30/05 Gypsum Outfall

  • NDJHTO 11/30/05 Algonquin
  • NDHITO 5' Street Well
  • ND/HTO Rock Quarry
  • NDIHTO Croton Reservoir NDIHTO Camp Field Reservoir NDIHTO 12/6/05 Gypsum Plant Well #1 NDIHTO Gypsum Plant Well #2 NDJHTO 12/13/05 Algonquin Outfall ND/HTO Gypsum Outfall ND/ITO Rock Quarry ND/HTO
  • Environmental levels only of HTO & Sr-90 from 11/30/05 DEC Split samples mwexecsummSort-by-DateJan_26_2006.doc Page 7 of 7

1 111 - 111.11 I-I- I- 11 I- 11 I- -- - I -11,

.......- - 11,11,11-I

---e--x-e--c-i6m""m"'---Sort- b,_y'_"'_W_,_,"eIIJa'n"' '2,,_6"_"_2,_0_0,6_.doc_, Page 1g

. 1 Pag m-x ~,

[Sac Smith----111

,X-,-1"- sm ~I-1 ~ orb~I I-- ,I-_Ja---n_26_-2_006.doc'_"- .... " .- ._,___ _

On-Site Monitoring Wells Sorted by Well Location ExecLItive Summary January 26 th Man-holes (Storm Drains)

ID Date Location Sample Results MH-1 12/21/2005 North of IP-2 Turb. Bldg. by Too dry to sample 1/04/2006 Water ND/HTO MH-2 12/16/2005 River Front 651 pCi/I (IPEC) 1/4/2006 ND/HTO 1/19/2006 ND/HTO CIM 11 f % Lt MH-2A 1/4/2006 'By IP-2 EDG G ND/HTO 5Q.a.

MH-3 11/10/2005 North of IP-2 Turbine Building 1,950 pCi/i 12/8/2005 894 pCi/i 12/20/2005 2,330 pCi/i 1/4/2006 3,450 pCi/I 1/19/2006 2,240 pCi/I MH-4 12/16/2005 Transformer Yard 4,370 pCi/l 1/4/2006 3,070 pCi/i 1/19/2006 3,780 pCi/I MH-4A 12/21/2005 IP-2 Condenser Tube removal pit 2,730 pCi/i 1/4/2006 3,380 pCi/I MH-5 11/10/2005 Xux Feed Bldg 2,390 pCi/I 12/8/2005 2,020 pCi/I &aVI 12/20/2005 6,920 pCi/l 1/4/2006 3,480 pCi/i 1/19/2006 3,570 pCi/i MH-6 11/10/2005 Transformer Yard 51,300 pCi/i 12/8/2005 37,100 pCi/i 12/16/2005 12,200 pCi/I 1/4/2006 13,100 pCi/l 1/19/2006 18,600 pCi/I MH-7 12/19/2005 Transformer Yard 5,340 pCi/l 1/4/2006 8,140 pCi/i 1/19/2006 3,840 pCi/I MH-8 12/16/2005 Transformer Yard 4,510 pCi/l 1/4/2006 5,740 pCi/l 1/19/2006 3,210 pCi/I MH-9 12/16/2005 MOB Hill - 80' 2,140 pCi/I MH-10 12/16/2005 MOB Hill - 80' 2,940 pCi/i MH-12 1/4/2006 West of IP-2 Turb. Bldg. by river ND/HTO 1/13/2006 ND/HTO 1/19/2006 ND/HTO MH-14 1/4/2006 North End IP-2 Turb. ND/HTO 1/19/2006 1,310 pCi/l mwexecsummSort-byWellJan_26_2006.doc Page I of 8

I[--- m I Sort by Welijan 26 - 6 Paqe 219 Pa Stacy Smith mwexecsummSorLbyWellJan_26_2006.doc On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MH-15 1/13/2006 IP-2 North east of MH-14 ND/HTO MH-17 12/16/2005 Transformer Yard 1,710 pCi/I MH-18 12/16/2005 Transformer Yard 854 pCi/i MH-19 12/16/2005 Transformer Yard 1,800 pCi/i MH-A4 10/18/2005 IP-3 Manhole Located east of the ND/HTO IP-3 Monitor Tank MH-B8 10/18/2005 IP-3 Manhole located west of the 959 pCi/I north end of the IP-3 turbine hall over the discharge canal CB-4 1/4/2006 By IP-2 RWST _ 1,010 pCill CB-12 1/13/2006 South IP-1 Super Heater 849 pCi/I HTO F4"I CB-13 1/13/2006 South IP-1 Super Heater 856 pCi/l HTO CB-14 1/13/2006 West of CB-1 3 734 pCi/I HTO CB-15 1/13/2006 South U1 Screen Structure ND/HTO 1/19/2006 959 pCi/I CB-19 1/13/2006 South MH-14 ND/HTO CB-24 1/4/2006 jy IP-2 Sec. Bldg. 822 pCi/i SD A2 1/11/2006 East of IP-3 PAB ND/HTO 1/19/2006 ND/HTO SD A4 1/11/2006 East of A2 south A3 ND/HT 1/19/2006 1,190 pCi/I SD A6 1/19/2006 West of U3 WHU Tank Pad 686 pCi/I SD B 1 1/11/2006 Trans Yard 1P-3 4,530 pCi/i 1/17/2006 5,010 pCi/I SD B3 1/11/2006 Trans Yard IP-3 6,280 pCi/i 1/17/2006 4,650 pCi/I SD B4 1/11/2006 North U3 Turb & VC 3,180 pCi/i 1/17/2006 3,600 pCi/I SD B5 1/11/2006 North U3 Turb & VC 5,200 pCi/i 1/19/2006 3,320 pCi/l SD B6 1/17/2006 North 1P-3 Turb. ND/HTO SD B7 1/11/2006 North U3 Turb 2,510 pCi/i 1/17/2006 2,690 pCi/I SD B8 1/17/2006 North U3 Turb. By Disch Canal ND/HTO SD Cl 1/11/2006 West U3 Admin 997 pCi/l 1/17/2006 867 pCi/I mwexecsummSort-byWellJan_26_2006.doc Page 2 of 8

- - - - -I- .- 111,1'.",- -- -I..--,-- - - II I - - -- =_ 111 - = - -I

."S** __, mw execsumm Sort bv Well Jan 26 2006.doc Paqe 3 4 Page 3J IStacy Smith - mw execsummSorLbyWellJan_26_2006.doc On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th SD D2 1/11/2006 South U3 Admin ND/HTO 1/17/2006 ND/HTO SD El 1/19/2006 South East Road way ND/HTO SD E2 1/19/2006 South East Road way ND/HTO SD E2B 1/19/2006 South East Road way ND/HTO SD E3 1/19/2006 South of Admin & north of road ND/HTO SD E3A 1/19/2006 South of Admin in road ND/HTO SD E4 1/17/2006 South End Adrmin & road ND/HTO SD E4A 1/17/2006 SE End U3 Admin South of road ND/HTO SD E5 1/17/2006 SW End Admin & South of Road ND/HTO SD E5A 1/17/2006 SW U3 Admin in Road ND/HTO SD E6 1/17/2006 SW U3 Admin South of Road ND/HTO SD E7 1/17/2006 West U3 Admin by Disch Canal ND/HTO ID Date Location Sample Results MW-30 11/22/2005 SB Leakage Areaoote: Well 464, 000 to 600, 000 pCi/l development NOT completed HTO beffv MW-31 12/30/2005 Outside MOB 4,060 pCi/l HTO 1/5/2006 3,050 pCi/I HTO 1/10/2006 _ 4,030 pCi/l HTO MW-32 1/12/2006 Between FSB & PAB_ 3,720 pCiAI HTO - Raw Water &II!rT MW-33 12/15/2005 Transformer Yard 142,000 pCi/l HTO 12/19/2005 199,000 pCi/l HTO 12/29/2005 220,000 pCi/l HTO 01/06/2006 189,000 pCi/i HTO 1/13/2006 232,000 pCi/I HTO MW-34 12/13/2005 Transformer Yard 63,900 pCi/l HTO 12/19/2005 121,000 pCi/l HTO 12/29/2005 147,000 pCi/I HTO 1/2006/2006 159,000 pCi/l HTO 1/13/2006 131,000 pCi/l HTO MW-35 12/13/2005 Transformer Yard 42,300 pCi/I HTO 12/19/2005 76,000 pCi/I HTO 12/29/2005 80,500 pCi/l HTO 1/6/2006 95,400 pCi/l HTO

_ 1/13/2006 97,800 pCi/l HTO mwexecsummSort-byWellJan_26_2006.doc Page 3 of 8

Fgfk-Shi ith__- mw execsurnm

- ,--,",- __ Sort

" by"--- Well


Jan 26 2006.doc Pag'4"J I Stacy Smith - mwexecsummSorLbyWellJan_262006.doc Paae 4]..'t1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th ID Date Location Sample Results MW-38 12/5/2005 End of IP-3 Discharge Canal ND/HTO 12/6/2005 Concrete ND/HTO 12/8/2005 985 pCi/l IPEC 12/8/2005 701 pCi/l NYSDEC 12/8/2005 ND SR-90 Teledyne 12/30/2006 ND/HTO 1/10/2006 1,008 pCi/l IPEC ID Date Location Sample Results MW- 11 9/28/2005 Transformer Yard 212,000 pCi/l HTO 10/5/2005 188,000 pCi/l HTO 10/7/2005 188,000 pCi/l HTO 10/14/2005 6820 pCi/l HTO(rain) 10/14/2005 6320 pCi/l HTO (back-up) 10/21/2005 284,000 pCi/l HTO 10/21/2005 267,000 pCi/l HTO DEC 10/28/2005 218,000 pCi/l HTO 11/4/2005 302,000 pCi/l HOT 11/10/2005 246,000 pCi/l HTO 11/18/2005 171,000 pCill HTO 11/22/2005 180,000 pCi/l HTO 12/02/2005 125,000 pCi/l HTO 12/08/2005 270,000 pCi/l HTO 12/15/2005 296,000 pCi/l HTO 12/19/2005 192,000 pC/I HTO 12/29/2005 212,000 pC/I HTO 1/6/2006 113,000 pC/I HTO 1/13/2006 199,000 pC/l HTO ID Date Location Sample Results MW-101 12/8/2005 U2 Warehouse ND/HTO 12/8/2005 ND/HTO DEC 12/8/2005 ND Sr-90 Teledyne mwexecsummSort-byWell_Jan_26_2006.doc Page 4 of 8

9_1-I-I--._-- , 1.., -_,"","'-'-, , , . .....X- __r - - Well-Jan

-1 - - _1,1--_ _ I---I.,

- rnw-execsymm-Sort by 26-2006.doc Page 51 Page 5I Stacy Smith mwexecsummSorLbyWellJan_26_2006.doc On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MW-105 12/8/2005 Mtce. Training ND/HTO 12/8/2005 96 pCi/I DEC 12/8/2005 ND Sr-90 Teledyne MW-107 9/28/2005 NEM ND/HTO 12/8/2005 ND/HTO 12/8/2005 ND/HTO DEC 12/8/2005 ND Sr-90 Teledyne MW-108 9/29/2005 GT-1 ND/HTO 11/3/2005 ND/HTO MW-109 9/28/2005 GT-1 ND/HTO 11/04/2005 ND/HTO ID Date Location Sample Results U3- 1 10/6/2005 U3 Discharge Canal 417 pCi/I HTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HTO 12/30/2005 ND/HTO 1/12/2006 ND/HTO U3-2 10/6/2005 U3 Discharge Canal 960 pCi/l HTO 10/21/2005 ND/HTO 10/21/2005 512 pCi/l HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HTO 12/30/2005 ND/HTO 1/11/2006 ND/HTO mwexecsummSort-by-WellJain_26_2006.doc Page 5 of 8

Stay',Sm,,h IIJ2 X _ . P g 6

~StcSmth - mw oexemmSok Well Jan 262006.doc Page 6,1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th U3-3 10/6/2005 U3 Discharge Canal 439 pCi/I HTO 10/21/2005 ND/HTO 10/21/2005 ND/HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 471 pCi/I HTO 11/18/2005 ND/HTO 12/2/2005 ND/HTO 12/15/2005 ND/HT 12-30-05 ND/HTO 1/11/2006 ND/H-T0 U3-4 10/16/2005 U3 Condensate Polisher 406 pCi/I HTO 10/21/2005 399 pCi/I HTO 10/21/2005 344 pCi/I HTO DEC 10/28/2005 405 pCi/I HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HT0 12/2/2005 ND/HTO 12/15/2005 399 pCi/I HTO 12-30-05 442 pCi/I HTO 1/12/2006 573 pCi/l HTO U3-T1 10/6/2005 U3 South Turbine 703 pCi/I HTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 563 pCi/i HTO 11/18/2005 ND/HTO 12/2/2005 498 pCi/i HTO 12/15/2005 ND/HT0 12-30-05 529 pCi/i HTO 1/12/2006 __ _ _ _ _ _ _ _ _ _ _ _ _ 786 p Ci/I HTO mwexecsummSort-byWellJa.n_26_2006.doc Page 6 of 8

StacV Smith - mwexecsummSor(_bvWe11 Jan-26-2006.doc Stacy Smith mwexecsummSorLbyWellJan_26_2006.doc

-___ __-- =111e-11111-- .- 11,1- , - -

1___.-11____ ____ ___

Page 7:1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th U3-T2 10/7/2005 U3 North Turbine 1,590 pCi/I HTO 10/21/2005 1,470 pCi/i HTO 10/21/2005 1,420 pCi/ HTO DEC 10/28/2005 1,280 pCi/i HTO 11/4/2005 1,190 pCi/i HTO 11/10/2005 1,640 pCi/I HTO 11/18/2005 1,130 pCi/I HTO 12/2/2005 1,329 pCi/I HTO 12/15/2005 1,290 pCi/I HTO 12/30/2005 1,685 pCi/I HTO 1/06/2006 2,417 pCi/I HTO 01/12/2006 1,776 pCi/ lHTO ID Date Location Sample Results Well-I 12/06/2005 Lafarge Property. North East ND/HTO 12/06/2005 Well - Farthest from river NDJHTO DEC 12/06/2005 ND SR-90 Teledyne Well-3 12/06/2005 Lafarge Property. North West ND/HTO 12/06/2005 Well - closest to river ND SR-90 Teledyne 12/06/2005 ND/HTO DEC mwexecsummSort-by-WellJan_26_2006.doc Page 7 of 8

Stacy Smith - mw-execsumm=Sort-byWellJan_26_2006.doc Page 81

-- 811--

Stacy--Smith mw execsu..mm or by1--1ell-_Ja--n_2I6_2006.d-oc

- II11 - -- -- Page -

On-Site Monitoring Wells Sorted by Well Location Executive Summary January 26 th MW-1l1, MW-33, MW-34 & MW-35 Tritium 350,000 300,000 250,000 R -*- MW-lll pCi HTO 8 200,000 rAW-33 pCVI HTO E MW-34 pCO HTO E 150,000

-ir- MW-35 pCVI HTO 100,000 50,000 0

L 0O8 010(0LO(0(0LO I I LO M (0 (0 0 ~0 0 0 0 C 0 Date mwexecsummSort_byWellJan_26_2006.doc Page 8 of 8