Ltr 09/22/2006 Perry Notification of NRC Trienial Fire Protection Baseline Inspection 06-008
ML062650330
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/22/2006
From: Julio Lara
Engineering Branch 3
To: Pearce L
FirstEnergy Nuclear Operating Co
References
IR-06-006
Download: ML062650330 (11)


Text

September 22, 2006Mr. L. William PearceSite Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT NOTIFICATION OF AN NRC TRIENNIALFIRE PROTECTION BASELINE INSPECTION 05000440/2006008(DRS)

Dear Mr. Pearce:

On November 27, 2006, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennialfire protection baseline inspection at the Perry Nuclear Power Plant. This inspection will be performed in accordance with the NRC baseline Inspection Procedure 71111.05T.The schedule for the inspection is as follows:

  • Information gathering visit - November 13-15, 2006
  • On-site inspection activity - November 27 to December 1, 2006, and December 11-15, 2006The purpose of the information gathering visit is: (1) to obtain information and documentationneeded to support the inspection; (2) to become familiar with the Perry Nuclear Power Plant fireprotection program, fire protection features, post-fire safe shutdown capabilities and plantlayout; and (3) to arrange administrative details such as office space, availability ofknowledgeable office personnel and to ensure unescorted site access privileges.Experience has shown that the baseline fire protection inspections are extremely resourceintensive both for the NRC inspectors and the licensee staff. In order to minimize the inspectionimpact on the site and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups. The first group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection. It is requested that this information be provided to Mr. Zelig Falevits via mail or electronically, zxf@nrc.gov

, no later than October 23, 2006. Thesecond group lists information necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be available on-site no later than November 13, 2006. The third group of requested documents are those items that theinspection team will review, or need access to, during the inspection. Please have thisinformation available by the first day of the on-site portion of the inspection, November 27, 2006.

W. Pearce-2-The fourth group lists information necessary to aid the inspection team in tracking issuesidentified as a result of the inspection.It is requested that this information be provided to the lead inspector as the information isgenerated during the inspection. It is important that all of these documents are up to date andcomplete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.The lead inspector for this inspection is Mr. Zelig Falevits. We understand that our regulatorycontact for this inspection is Mr. Charles Eberfield of your organization, and that our technical contact is Mr. Craig Miller, also of your organization. If there are any questions about theinspection or the material requested, please contact the lead inspector at (630) 829-9717 or via e-mail at zxf@nrc.gov

.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (thePublic Electronic Reading Room).Sincerely,/RA/Julio F. Lara, ChiefEngineering Branch 3 Division of Reactor SafetyDocket No. 50-440License No. NPF-58

Enclosure:

Fire Protection Inspection Document RequestSee Attached Distribution List W. Pearce-3-cc w/encl:G. Leidich, President and Chief Nuclear Officer - FENOCJ. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health W. Pearce-2-The fourth group lists information necessary to aid the inspection team in tracking issuesidentified as a result of the inspection.It is requested that this information be provided to the lead inspector as the information isgenerated during the inspection. It is important that all of these documents are up to date andcomplete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.The lead inspector for this inspection is Mr. Zelig Falevits. We understand that our regulatorycontact for this inspection is Mr. Charles Eberfield of your organization, and that our technical contact is Mr. Craig Miller, also of your organization. If there are any questions about theinspection or the material requested, please contact the lead inspector at (630) 829-9717 or via e-mail at zxf@nrc.gov

.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (thePublic Electronic Reading Room).Sincerely,Julio F. Lara, ChiefEngineering Branch 3 Division of Reactor SafetyDocket No. 50-440License No. NPF-58

Enclosure:

Fire Protection Inspection Document RequestSee Attached Distribution ListDOCUMENT NAME:E:\Filenet\ML062650330.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIDRSRIIIDRSRIIIRIIINAMEZFalevits: lsEDuncanJLara DATE09/22/0609/22/0609/22/06OFFICIAL RECORD COPY W. Pearce-3-cc w/encl:G. Leidich, President and Chief Nuclear Officer - FENOCJ. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of HealthDISTRIBUTION

DXC1 TEB SJC4 RidsNrrDirsIrib

GEG KGO MEF1 CAA1 DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov FIRE PROTECTION INSPECTION DOCUMENT REQUESTINITIAL REQUESTEnclosure 1Inspection Report

05000440/2006006(DRS)Inspection Dates
November 13 - 15, 2006, Information Gathering VisitNovember 27 to December 1, 2006, On-site Inspection Activity December 11-15, 2006, On-site Inspection ActivityInspection Procedures
IP 71111.05T, "Fire Protection-Triennial"IP 71152, "Identification and Resolution of Problems"Inspectors
Zelig Falevits, Lead Inspector630-829-9717 zxf@nrc.govDarrell L. Schrum 630-829-9741 dls3@nrc.govDariusz Szwarc 630-829-9515 dxs4@nrc.govA.Information Requested Prior to the Information Gathering VisitThe following information is requested by October 23, 2006. If you have any questionsregarding this information, please call the lead inspector as soon as possible. All information may be sent electronically (to Mr. Zelig Falevits, e-mail address zxf@nrc.gov

)or provided on compact disc (the preferred method). If compact discs are provided,three sets (one for each inspector) are requested.(1)The reactor plant's Individual Plant Examination for External Events (IPEEE) forfire, results of any post-IPEEE reviews for fire, and listings of actions taken and/or plant modifications conducted in response to IPEEE information for fire.

Alternatively, probabilistic risk analyses for fire and associated information, if itexists and is more recent than the IPEEE.(2)A list of fire areas requiring alternative shutdown capability, (i.e., those areas forwhich 10 CFR Part 50, Appendix R, Section III.G requirements are satisfied underSection III.G.3), or where both safe shutdown trains can be affected.

FIRE PROTECTION INSPECTION DOCUMENT REQUESTINITIAL REQUESTEnclosure 2B.Information Requested During the Information Gathering Visit(November 13 - 15, 2006)This information is requested to be available in one set of hard-copy documents (wherepossible) on-site during the information gathering visit. In addition, if the requested information is available electronically, it is requested that the information be provided on three sets of compact discs (searchable, if possible).(1)Licensing Information(a)The facility license, including the fire protection license condition;(b)All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports(SERs) applicable to fire protection (specifically including those SERs referenced by the plant fire protection license condition) and all other associated licensing correspondence applicable to fire protection;(c)The fire protection program and applicable portions of the Updated SafetyAnalysis Report, as referenced by the fire protection license condition;(d)Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, andassociated licensing correspondence;(e)For pre-1979 plants (i.e., "Appendix R" plants), a listing all 10 CFRPart 50, Appendix R, sections and paragraphs that are applicable to the facility under 10 CFR 50.48(b)(1);(f)For pre-1979 plants, all licensing correspondence associated with thosesections of CFR Part 50, Appendix R, which are not applicable to the plant under 10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with those fire protection features proposed or implemented by the licensee that have been accepted by the NRC staff as satisfying theprovisions of Appendix A to Branch Technical Position (BTP)

APCSB-9.5-1 reflected in NRC fire protection safety evaluation reportsissued before February 19, 1981 (10 CFR 50.48(b)(1)(i)); or those fire protection features which were accepted by the NRC staff in comprehensive fire protection safety evaluation reports issued before Appendix A to BTP APCSB 9.5-1 was published in August 1976, (10 CFR 50.48(b)(1)(ii));(g)For post-1979 plants, all licensing correspondence associated with thecomparison to Standard Review Plan (NUREG-0800), Section 9.5.1 orequivalent for licensing purposes; and FIRE PROTECTION INSPECTION DOCUMENT REQUESTINITIAL REQUESTEnclosure 3(h)For those plants intending to transition to NFPA 805, all correspondenceto and responses from the NRC relating to the planned transition.(2)Fire Protection Program(a)If not already provided under request II(1)(c) above, fire protectionprogram documents including fire hazards analyses and post-fire safe shutdown analyses;(b)A listing of changes made to the fire protection program (includingassociated adverse to safe shutdown analyses);(c)For pre-1979 plants, a listing of the protection methodologies identifiedunder 10 CFR Part 50, Appendix R, Section III.G used to achievecompliance for selected fire zones/areas (to be determined during information gathering visit). That is, please specify whether 3-hour rated fire barriers (Section III.G.2.a), 20-foot separation along with detection and suppression (Section III.G.2.b), 1-hour rated fire barrierswith detection and suppression (Section III.G.2.c), or alternative shutdowncapability (Section III.G.3) is used for each selected fire zone/area;(d)A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safeshutdown evaluations);(e)A list of applicable codes and standards related to the design of plant fireprotection features. The list should include National Fire Protection Association (NFPA) code versions committed to (i.e., the NFPA codes of record);(f)A list of plant deviations from code commitments and associatedevaluations; and(g)Facility layout drawings which identify plant fire area delineation, areasprotected by automatic fire suppression and detection, and the locations offire protection equipment.(3)Facility Information(a)Piping and instrumentation (flow) diagrams showing the components usedto achieve and maintain hot standby and cold shutdown for fires outside the control room and those components used for those areas requiring alternative shutdown capability;(b)Facility layout and equipment drawings which identify the physical facilitylocations of hot standby and cold shutdown equipment for selected fire zones/areas (to be determined during information gathering visit);

FIRE PROTECTION INSPECTION DOCUMENT REQUESTINITIAL REQUESTEnclosure 4(c)One-line drawings of the electrical distribution system for 4160 Volts -alternating current (Vac) down to 480 Vac;(d)One-line drawings of the electrical distributi on system for 250 Volts - directcurrent (Vdc) and 125 Vdc systems as applicable; and(e)Safe shutdown cable routing database (requested electronically such ason compact disc), if available.(4)Operations Response for Fire Protection(a)Pre-fire plans for selected fire zones/areas (to be determined duringinformation gathering visit); and(b)Plant operating procedures which would be used and describe shutdownfor a postulated fire in selected fire zones/areas (to be determined during information gathering visit).(5)Corrective Actions(a)Listing of open and closed fire protection condition reports (i.e., problemidentification forms and their resolution reports) since the date of the last triennial fire protection inspection; and(b)Listing of fire impairments since the date of the last triennial fire protectioninspection.(6)General Information(a)A listing of abbreviations and/or designators for plant systems;(b)Organization charts of site personnel down to the level of fire protectionstaff personnel; and(c)A phone list for on-site licensee personnel.(7)On-Site DiscussionsIn addition, during the information gathering visit, it is requested that licensee staffbe available for the following:(a)Informal discussion on plant procedures operators would use in the eventof fire and under what conditions would the plant be shutdown using alternative shutdown methodology; FIRE PROTECTION INSPECTION DOCUMENT REQUESTINITIAL REQUESTEnclosure 5(b)Informal discussion on the plant's safe shutdown cable routing databaseand the plant-wide cable routing database, as applicable; and(c)A tour of alternative shutdown and risk significant fire areas.C.Information Requested to be Available on First Day of Inspection(November 27, 2006)This information is requested to be available in one set of hard-copy documents (wherepossible) on-site during the information gathering visit. In addition, if the requested information is available electronically, it is requested that the information be provided on three sets of compact discs (searchable, if possible).(1)Procedures(a)List of the fire protection program implementing procedures(e.g., administrative controls, surveillance testing, fire brigade);(b)List of maintenance and surveillance testing procedures for alternativeshutdown capability and fire barriers, detectors, pumps and suppressionsystems;(c)List of maintenance procedures which routinely verify fuse breakercoordination in accordance with the post-fire safe shutdown coordination analysis;(d)List of procedures and/or instructions that control the configuration of thereactor plant's fire protection program, features, and post-fire safe shutdown methodology and system design; and(e)List of procedures and/or instructions that govern the implementation ofplant modifications, maintenance, and special operations, and their impact on fire protection.(2)Design and Equipment Information(a)Coordination calculations and/or justifications that verify fuse/breakercoordination for selected fire zones/areas (to be determined during information gathering visit) that are fed off of the same electrical buses as components in the protected safe shutdown train;(b)Copies of significant fire protection and post-fire safe shutdown relateddesign change package descriptions (including their associated 10 CFR Part 50.59 evaluations) and Generic Letter (GL) 86-10 (or adverse to safe shutdown) evaluations; FIRE PROTECTION INSPECTION DOCUMENT REQUESTINITIAL REQUESTEnclosure 6(c)Gaseous suppressi on system pre-operational testing, if applicable, forselected fire zones/areas (to be determined during information gathering visit);(d)Hydraulic calculations and supporting test data which demonstrateoperability for water suppression systems, if applicable, for selected firezones/areas (to be determined during information gathering visit);(e)Alternating current (ac) coordination calculations for 4160 Vac down to480 Vac electrical systems; and(f)Vendor manuals and information for fire protection equipment (such asdetection, suppression systems, fire pumps), applicable to selected firezones/areas (to be determined during information gathering visit). It is acceptable to make vendor manuals available to the inspectors in lieu of providing a copy.(3)Assessment and Corrective Actions(a)The three most recent fire protection Quality Assurance (QA) auditsand/or fire protection self-assessments; and(b)Corrective action documents (e.g., condition reports, including status ofcorrective actions) generated as a result of the three most recent fire protection Quality Assurance (QA) audits and/or fire protection self-assessments.D.Information Requested to Be Provided Throughout the Inspection(1)Copies of any corrective action documents generated as a result of the team'squestions or queries during this inspection; and(2)Copies of the list of questions submitted by the team members and thestatus/resolution of the information requested (provide daily during the inspection to each team member).