Acknowledgement of Receipt - Perry Response to Issues Identified in NRC Inspection Report 06-014
ML063100618
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/02/2006
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To: Pearce L
FirstEnergy Nuclear Operating Co
References
IR-06-014
Download: ML063100618 (4)


Text

November 2, 2006 Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097

SUBJECT:

ACKNOWLEDGMENT OF RECEIPT - FENOC RESPONSE TO ISSUES IDENTIFIED IN NRC INSPECTION REPORT 05000440/2006014

Dear Mr. Pearce:

This acknowledges receipt of your letter dated October 26, 2006, which responded to the issues identified during the Perry Nuclear Power Plant Confirmatory Action Letter followup inspection of Inspection Procedure 95002 Issues Action Item Effectiveness, documented in NRC Inspection Report 05000440/2006014, dated September 20, 2006. We have reviewed your response and have no further questions at this time.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by Geoffrey C. Wright for/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 DISTRIBUTION:

See next page

Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097

SUBJECT:

ACKNOWLEDGMENT OF RECEIPT - FENOC RESPONSE TO ISSUES IDENTIFIED IN NRC INSPECTION REPORT 05000440/2006014

Dear Mr. Pearce:

This acknowledges receipt of your letter dated October 26, 2006, which responded to the issues identified during the Perry Nuclear Power Plant Confirmatory Action Letter followup inspection of Inspection Procedure 95002 Issues Action Item Effectiveness, documented in NRC inspection report 05000440/2006014, dated September 20, 2006. We have reviewed your response and have no further questions at this time.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 DISTRIBUTION:

See next page DOCUMENT NAME:C:\\FileNet\\ML063100618.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII NAME RRuiz:dtp EDuncan*GCW for DATE 11/02/06 11/02/06 OFFICIAL RECORD COPY

L. Pearce cc:

G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health