DCL-11-074, Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Revision as of 15:24, 10 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations
ML11194A051
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/01/2011
From: Welsch J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-11-074
Download: ML11194A051 (3)


Text

.1 a Pacific Gas and Electric Company'James M. Welsch Station Director Diablo Canyon Power Plant Mail Code 104/5/502 P. 0. Box 56 Avila Beach, CA 93424 July 1,2011 PG&E Letter DCL-11-074 805.545.3242 Internal:

691.3242 Fax: 805.545.4234 10 CFR 50.55 Internet:

JMWl@pge.com U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations Dear Commissioners and Staff: Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2011-04, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed.Pacific Gas and Electric Company makes no regulatory commitments (as defined by NEI 99-04) in this letter.If you have further questions, please contact Mr. John M. Becerra, Operations Training Leader, at (805) 545-4006.Sincerely, James M. Welsch swh/50408543 Enclosure cc/enc: John M. Becerra Elmo E. Collins, NRC Region IV Michael S. Peck, NRC Senior Resident Inspector James T. Polickoski, NRR Project Manager Alan B. Wang, NRR Project Manager Huc3 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway -Comanche Peak .Diablo Canyon -Palo Verde

  • San Onofre
  • South Texas Project .Wolf Creek jJ "L Enclosure PG&E Letter DCL-1 1-074 NRC Form 536,"Operator Licensing Examination Data" NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Diablo Canyon Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 Cy 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2 0 1 4 CY 2 0 1 5 CY 2 0 1 6 NUMBER OF REACTOR 8 0 8 8 OPERATORS NUMBER OF SENIOR REACTOR 7 0 4 4 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR OPERATORS

-UPGRADE 0 3 3 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 10/10/2013 08/10/2015 10/10/2016 ALTERNATE DATE 11/10/2013 09/10/2015 11/10/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER NUMBER OF 15 CANDIDATES NRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER