MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML24011A1702024-01-11011 January 2024 Washington State University, Revised Responses to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request - Section 5 of the Technical Specifications and Bases ML24003A7892024-01-0303 January 2024 Washington State Univ., Request to Rescind Responses to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request Section 5 of the Technical Specifications and Bases for the Washington State University Modifie ML24003A9152024-01-0303 January 2024 Washington State University, Change in Level 1 Management for the Wsu Reactor Facility IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A1952023-11-30030 November 2023 Response to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, P ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23261A6082023-09-20020 September 2023 Washington State University Rfai License Amendment Request for Section 5 of the Technical Specifications for the Washington State University Modified Triga Nuclear Reactor and Facility License R-76 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application ML23242A3122023-08-30030 August 2023 Washington State University Modified Triga Reactor, 2023 Annual Report IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23102A2052023-08-28028 August 2023 Examination Result Letter No. 50-027/OL-23-01, Washington State University ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23220A3862023-08-0808 August 2023 License Amendment Request Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, Proposed Amendment 22 2024-02-07
[Table view] |
Text
SCE&G New Nuclear Deployment July 9, 2014 NND-14-0393 ATTN: Document Control Desk 10 CFR 50.90 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Virgil C. Summer Nuclear Station (VCSNS) Units 2 &
3 Combined License Nos. NPF
-93 and NPF
-94 Docket Nos. 52
-027 & 52-028
Subject:
VCSNS Units 2&3 LAR 14-03S1: Supplement 1 to Request for License Amendment
- Tier 2* Editorial and Consistency Changes
References:
- 1. LAR 14-03 Request for License Amendment: Tier 2* Editorial and Consistency Changes, Dated June 12, 2014 (Accession Number
ML14164A098) In accordance with 10 CFR 50.90, South Carolina Electric & Gas Company (SCE&G), the Licensee for Virgil C. Summer Nuclear Station Units 2&3, requested an amendment to combined operating license (COL) numbers NPF
-93 and NPF
-94 for VCSNS Units 2&3, respectively, in Reference 1. The requested amendment proposed editorial and consistency changes within Tier 2* information contained in the Updated Final Safety Analysis Report (UFSAR)
. On July 3, 2014 SCE&G became aware that Reference 1 misquoted the UFSAR in "Licensing Basis Proposed Changes
- Public (LAR 14-03)" of Reference 1 by omitting a small portion of the text. This misquote occurred on page 3 of Enclosure 2 in the section titled "UFSAR Subsection 3H.3.1, Governing Codes and Standards:" in which the title of American Concrete Institute standard ACI 349-01 was being corrected in the UFSAR to align with the actual title of the standard.
To correct this issue, SCE&G submits Enclosure 4 of this letter which revises page 3 of to include the UFSAR text that was omitted in Reference 1.
The information provided in Enclosure 4 of this letter does not change the scope of, nor affect the Technical Evaluation or the conclusions of the Significant Hazards Consideration determination of the LAR provided in Reference 1. In addition, it does not alter the initial requested approval date.
Ronald A. Jones Vice President New Nuclear Operations
Document Control Desk NND-14-0393 Page 3 of 3 Margaret Felkel Cynthia Lanier Rhonda O'Banion Christopher Levesque Joel Hjelseth Daniel Churchman Brian McIntyre William Hutchins Brian Bedford Tom Geer Michael Frankle Ken Hollenbach Alvis J. Bynum
Marion Cherry
Kathryn M. Sutton Curtis Castell Chuck Baucom AJ Marciano Sean Burk Susan E. Jenkins VCSummer2&3ProjectMail@cbi.com vcsummer2&3project@westinghouse.com DCRM-EDMS@SCANA.COM VCSNNDCorrespondence@scana.com
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Units 2&
3 NND-1 4-0393 Enclosure 4 (Enclosures 1
-3 provided previously in Reference 1
) Supplemental Information Regarding Request for License Amendment 14-03: Tier 2* Editorial and Consistency Changes (LAR 14-03S1)
NND-14-0393 Enclosure 4 Licensing Basis Proposed Changes
- Public (LAR 14
-03S1) Page 2 of 2 hatch, and the access opening to the annex building. The electrical penetration area, trip switchgears, and other electrical equipment motor control centers occupy most of the floor at elevation 117-6. The floor at elevation 135-3 is used for the storage of main control room air cylinders and provides access to the annex building. The roof for these areas is at elevation 160-6. Areas 5 and 6 include facilities for storage and handling of new and spent fuel. The spent fuel pool, fuel transfer canal, and cask loading and cask washdown pits have concrete walls and floors. They are lined on the inside surface with stainless steel plate for leak prevention.
The Interior structural walls and major floors are constructed using concrete filled steel plate modules, steel form modules, or reinforced concrete. The new fuel storage area is a separate reinforced concrete pit providing temporary dry storage for the new fuel assemblies. A 150
-ton cask handling crane travels in the east
-west direction. The location and travel of this crane prevents the crane from carrying loads over the spent fuel pool to preclude them from falling into the spent fuel pool. Mechanical equipment is also located in this area for spent fuel cooling, residual heat removal, and liquid waste processing. This equipment is generally nonsafety
-related.]* UFSAR Subsection 3H.3.1, Governing Codes and Standards:
Revise Tier 2* information, as shown below:
ACI 349-01, "Code Requirement s for Nuclear Safety
- Related Concrete Structures Structure Steel" (refer to subsection 3.8.4.5 for supplementary requirements and subsection 3.8.4.4.1 for alternative requirements
). UFSAR Subsection 3H.5.2, Composite Structures (Floors and Roof):
Revise Tier 2* information, as shown below:
De sign o f co n c r e t e s l ab - T h e conc rete slab a nd the st e el r ei n fo r c ement of t h e c o mp o site s ecti o n a r e eval u at e d for n o r m a l and e x t r e m e env i r on m e n t a l co n d it i ons. T he s la b c o n c r e t e a nd t he r e i n f o r cement is des i g ned t o m e et the r eq u i r ements o f Ame rican C o nc r e te Inst i tute st a nd a rd ACI 3 4 9-01 "Code R e q ui r e m e nts for Nuclear S af e t y- Rel ate d C o nc r e t e S t ru c t u r e s."