MONTHYEARML24011A1702024-01-11011 January 2024 Washington State University, Revised Responses to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request - Section 5 of the Technical Specifications and Bases ML24003A7892024-01-0303 January 2024 Washington State Univ., Request to Rescind Responses to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request Section 5 of the Technical Specifications and Bases for the Washington State University Modifie ML24003A9152024-01-0303 January 2024 Washington State University, Change in Level 1 Management for the Wsu Reactor Facility ML23334A1952023-11-30030 November 2023 Response to Request for Additional Information in Reference to LAR 2023-1: License Amendment Request Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, P ML23261A6082023-09-20020 September 2023 Washington State University Rfai License Amendment Request for Section 5 of the Technical Specifications for the Washington State University Modified Triga Nuclear Reactor and Facility License R-76 ML23242A3122023-08-30030 August 2023 Washington State University Modified Triga Reactor, 2023 Annual Report ML23102A2052023-08-28028 August 2023 Examination Result Letter No. 50-027/OL-23-01, Washington State University ML23220A3862023-08-0808 August 2023 License Amendment Request Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, Proposed Amendment 22 IR 05000027/20232012023-06-13013 June 2023 Washington State University U.S. Nuclear Regulatory Commission Routine Inspection Report 05000027-2023201 ML23102A2022023-05-10010 May 2023 Examination Confirmation Letter No. 50-027/Ol-23-01 Washington State University IR 05000027/20222012022-10-0606 October 2022 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000027/2022201 ML22242A3062022-08-30030 August 2022 Washington State University Modified Triga Reactor - 2022 Annual Report for the Wsu Nuclear Science Center ML22137A1022022-06-0606 June 2022 Examination Confirmation Letter No. 50-27/OL-22-01, Washington State University IR 05000027/20212012021-08-27027 August 2021 Washington State University - U.S. Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000027/2021201 ML21228A1322021-08-16016 August 2021 2021 Annual Report for the Wsu Nuclear Science Center ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20258A0312020-09-14014 September 2020 Examination Confirmation Letter No. 50-027/OL-21-01, Washington State University IR 05000027/20202012020-08-24024 August 2020 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000027/2020201 ML20045D7822020-02-14014 February 2020 Washington State University Modified Triga Reactor: Nuclear Science Center Emergency Plan Updates - Summary of Changes (Revision 1/2020) ML20027C5532020-01-27027 January 2020 Washington State Univ., License Amendment Request (Supplemental) - Nuclear Radiation/Science Center Name Change and Removal of Primary Coolant Ph Specification ML19273A9412019-09-30030 September 2019 Washington State University, License Amendment Request - Nuclear Radiation/Science Center Name Change and Removal of Primary Coolant Ph Specification ML19246C1622019-09-0303 September 2019 Washington State University Modified Triga Reactor - Change to Level 2 Management in the Facility Organization IR 05000027/20192012019-08-30030 August 2019 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-027/2019-201 ML19235A0592019-08-20020 August 2019 Submittal of the 2019 Annual Report for the Wsu Nuclear Science Center ML19210D9652019-07-30030 July 2019 Examination Report No. 50-027/OL-19-01, Washington State University ML19204A2042019-07-29029 July 2019 Washington State University - Approval of the Revised Operator Requalification Program for the Washington State University Research Reactor ML19172A1042019-06-18018 June 2019 Washington State University Modified Triga Reactor - Change in Level 2 Management ML19072A0472019-03-18018 March 2019 Examination Confirmation Letter No. 50-027/OL-19-01, Washington State University ML18334A1022018-11-19019 November 2018 Washington State Univ., Submittal of Reactor Staff Requalification Program IR 05000027/20182022018-10-19019 October 2018 Washington State University - U.S. Nuclear Regulatory Commission Security Inspection Report No. 50-027/2018-202 (Letter) ML18235A3182018-08-20020 August 2018 Annual Report for the Wsu Facility for the Period July 1, 2017 Through June 30, 2018 IR 05000027/20182012018-08-13013 August 2018 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-027/2018-201 ML18179A4932018-06-28028 June 2018 Examination Report No. 50-027/OL-18-01, Washington State University Nuclear Radiation Center ML18012A0492018-01-10010 January 2018 Washington State University - Response to Part 71 Quality Assurance Program Approval Biennial Change Report ML17237A0522017-08-22022 August 2017 Washington State University Submittal of Annual Operating Report for the Period July 1, 2016 Through June 30, 2017 IR 05000027/20172012017-08-17017 August 2017 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000027/2017201 ML17181A2032017-07-0606 July 2017 Examination Report No. 50-027/OL-17-01, Washington State University ML17067A4042017-04-17017 April 2017 Washington State University GL 2016-01 Closeout Form Letter for Rtrs with No Credited NAM ML17073A0072017-03-16016 March 2017 Examination Confirmation Letter, 50-027/OL-17-01, Washington State University ML16321A4042016-11-0707 November 2016 Washington State University Response to Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML16266A2142016-10-25025 October 2016 Request for Withholding Information from Public Disclosure for the Virgil C. Summer Nuclear Station, Units 2 and 3 ML16245A2282016-08-19019 August 2016 Washington State University, Submittal of Annual Report from July 1, 2015 Through June 30, 2016 IR 05000027/20162022016-08-18018 August 2016 Washington State University - NRC Security-Related Inspection Report 05000027/2016202 IR 05000027/20162012016-08-11011 August 2016 Washington State University NRC Routine Inspection Report No. 05000027/2016201,July 19-21, 2016 ML16068A1162016-03-0808 March 2016 Examination Notification Letter No. 50-027/OL-16-01, Washington State University ML15278A3712015-12-29029 December 2015 Request for Withholding Proprietary Information from Public Disclosure for Virgil C. Summer Nuclear Station Units 2 and 3 License Amendment Request, Supplemental Requirements for Mechanical Coupler Weld Acceptability, Supplement 2, Enclosur ML15278A2872015-11-0505 November 2015 Acceptance Letter Sce&G V.C. Summer LAR 15-17, Addition of Two New Turbine Building Sump Pumps to ITAAC ML15223A4382015-08-0707 August 2015 Washington State University - Annual Report for Operating Period July 1, 2014 Through June 30, 2015 ML15217A4932015-07-28028 July 2015 Letter from Donald Wall Reportable Occurrence Involving Release of Fission Products Into Environment ML15182A2612015-07-21021 July 2015 Examinantion Report 50-027/OL-15-02 Washington State University 2024-01-03
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23220A3872023-08-0808 August 2023 License Amendment Request Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, Proposed Amendment 22 ML23220A3862023-08-0808 August 2023 License Amendment Request Section 5 of the Technical Specifications and Bases for the Washington State University Modified Triga Reactor and Facility License R-76, Proposed Amendment 22 ML19273A9422019-09-30030 September 2019 Washington State University - License Amendment Request - Nuclear Radiation/Science Center Name Change and Removal of Primary Coolant Ph Specification ML1023601942010-08-17017 August 2010 Washington State University Submittal of Proposed Technical Specifications for Washington State University Research Nuclear Reactor ML0724104932007-08-15015 August 2007 Washington State University - License Amendment Request for Two Orders, One for Increasing Possession Limits for Uranium-235 (Possession Order), and a Second Order for Conversion of the Wsu Reactor from HEU to Leu Fuel (Conversion Order) ML0213303472002-04-26026 April 2002 Washington State Univ - License Application Dated 04/26/2002 ML0213301342002-04-26026 April 2002 Washington State University Triga Reactor Facility, Request for Amendment, Amends TSs by Eliminating Phrase at Least Every 2 Years and from Section 4.3.4 on Page 22 2023-08-08
[Table view] |
Text
Nuclear Science Center August 8, 2023 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Reference:
Washington State University Modified TRIGA Reactor License No. R-76; Docket No.50-027
Subject:
License Amendment Request - Section 5 of the Technical Specifications and Bases for the Washington State University Modified TRIGA Reactor and Facility License R-76, Proposed Amendment 22 To Whom It May Concern:
The WSU Nuclear Science Center requests amendment to the Technical Specifications and Bases for the Washington State University Modified TRIGA Reactor. This request is to clarify the facility as described in specification 5.1.
A summary of the changes is provided with discussion. Only those pages identified in the proposed amendment are enclosed, including change bars and the addition of Amendment No. 22 and Date YY to any pages that are changed.
The proposed changes were reviewed and approved by the Reactor Safeguards Committee on July 13, 2023.
PO Box 641300, Pullman, WA 991641300 l 5093358641 l nsc.wsu.edu l or.nsc@wsu.edu
WSU LAR 2023-1 Page 2 of 3 Technical Specifications, Page 52 Clarify technical specification 5.1(3) by replacing facility with licensed area, and 5.1(4) to include language about the meaning of the facility.
Justification: Technical Specification 5.1 refers to the facility in 5.1(3). The definition used in 5.1(3) is not of the facility, but is that of licensed area as defined in section 1 of the technical specifications. The Bases for specifications 5.1(2) and 5.1(3) state that these specifications are a description of the location of the research reactor and that the research reactor shall be located within the licensed area of the facility. Technical specification 5.1(4) states that the facility shall be a restricted area. This license amendment request adds that the facility as stated is the area bound by the physical perimeter of the Dodgen Research Facility building.
Specifically, Technical Specification 5.1(3) states that the facility shall be the room in which the WSU reactor is located, also known as 201, the reactor control room, the pump room, primary coolant water purification room, primary coolant and makeup water valve manifold room. Further, TS 5.1(3) states that the facility shall also be the research reactor beam room, also known as room 2. This verbiage is the definition of a licensed area, not the facility.
The amendment request will not impact the objectives in section 5.1.
Safety Basis: The definition of licensed area, found in section 1 of the Technical Specifications states that a licensed area is part of the Dodgen Research Facility that includes the reactor pool room, and adjacent rooms that allow direct unrestricted access to the pool room and the beam room and adjacent rooms that allow direct unrestricted access to the beam room.
The bases for the technical specification 5.1(2) and 5.1(3) provide a description of the location of the reactor and the licensed area, and that the location of the research reactor shall be within the licensed area of the facility. The licensed area, as defined in the definitions correctly states that the licensed area are those areas with access to the reactor and experimental facilities. This is in contradiction; however, to Technical Specification 5.1(3) that states that these are defined as the facility.
licensed areas are part of the facility, and correctly constitute the licensed area where the research reactor is located. The parts of the definitions in section 1 for licensed area, and those found in 5.1(3) are synonymous and are the definition of the licensed area.
Facility Operating License R-76, page 3 A change to Section 2.C(2) is requested by WSU to update the amendment number to 22 by changing as revised through Amendment No. 21 to as revised through Amendment No. 22.
If you have any questions, please do not hesitate to contact me.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on 8/8/2023 .
WSU LAR 2023-1 Page 3 of 3 Best regards, C. Corey Hines Director
Attachment:
Proposed Amendment 22 to the License, Technical Specifications, and Bases for the WSU Modified TRIGA Reactor cc: Mr. Duane Hardesty, Sr. Project Manager U.S. Nuclear Regulatory Commission Mr. Craig Bassett, Inspector U.S. Nuclear Regulatory Commission