DCL-16-037, 2016 Annual Statement of Insurance

From kanterella
Revision as of 07:33, 20 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2016 Annual Statement of Insurance
ML16092A057
Person / Time
Site: Diablo Canyon, Humboldt Bay
Issue date: 04/01/2016
From: Halpin E
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
DCL-16-037, HBL-16-005
Download: ML16092A057 (2)


Text

Pacific Gas and Electric Company Edward D. Halpin Senior Vice President Generation and Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Chief Nuclear Officer 805.545.4100 E-Mail: El H8@pge.com April1, 2016 PG&E Letter DCL-16-037 PG&E Letter HBL-16-005 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 10 CFR 50.54 2016 Annual Statement of Insurance for Pacific Gas and Electric Company's Diablo Canyon Power Plant and Humboldt Bay Power Plant Dear Commissioners and Staff: As required by 10 CFR 50.54(w)(3), listed below is the annual reporting of nuclear property insurance coverage with Nuclear Electric Insurance Limited (NEIL) for the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP): Policy Limits DCPP NEIL Primary $1,500,000,000 NEIL Blanket Excess $1,250,000,000 TOTAL $2,750,000,000 HBPP NEIL Primary $ 131 '1 00,000 Policy Number P16-027 BX16-007 P16-028 Policy Period 04/01/16 to 4/01/17 04/01/16 to 4/01/17 04/01/16 to 4/01/17 Pacific Gas and Electric Company (PG&E) procures an additional

$200,000,000 of Property Damage in excess of the stated NEIL limits from European Mutual Association of Nuclear Insurance.

The Policy Number is A14/1006/2016/0 for the Policy Period April1, 2016, to April1, 2017. PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek 'l
  • 1 Document Control Desk April1, 2016 ' & Page 2 PG&E Letter DCL-16-037 PG&E Letter HBL-16-005 If you have any questions regarding this information, please contact Ms. Janaize Markland at (415) 973-8756.

Sincerely, Edward D. Halpin Senior Vice President, Generation and Chief Nuclear Officer bnsm/4540/6412250 1 cc: Marc L. Dapas, NRC Region IV Administrator Robert J. Evans, NRC Region IV Inspector John B. Hickman, NRC Reactor Decommissioning Branch Project Manager Janaize Markland, PG&E Director, Enterprise Risk Management Koji Maemura, PG&E Sr. Loss Control Engineer Jennifer K. Post, PG&E Attorney Balwant K. Singal, NRC Project Manager Binesh K. Tharakan, NRC Acting Senior Resident Inspector Diablo Distribution Humboldt Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek Pacific Gas and Electric Company Edward D. Halpin Senior Vice President Generation and Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Chief Nuclear Officer 805.545.4100 E-Mail: El H8@pge.com April1, 2016 PG&E Letter DCL-16-037 PG&E Letter HBL-16-005 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 10 CFR 50.54 2016 Annual Statement of Insurance for Pacific Gas and Electric Company's Diablo Canyon Power Plant and Humboldt Bay Power Plant Dear Commissioners and Staff: As required by 10 CFR 50.54(w)(3), listed below is the annual reporting of nuclear property insurance coverage with Nuclear Electric Insurance Limited (NEIL) for the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP): Policy Limits DCPP NEIL Primary $1,500,000,000 NEIL Blanket Excess $1,250,000,000 TOTAL $2,750,000,000 HBPP NEIL Primary $ 131 '1 00,000 Policy Number P16-027 BX16-007 P16-028 Policy Period 04/01/16 to 4/01/17 04/01/16 to 4/01/17 04/01/16 to 4/01/17 Pacific Gas and Electric Company (PG&E) procures an additional

$200,000,000 of Property Damage in excess of the stated NEIL limits from European Mutual Association of Nuclear Insurance.

The Policy Number is A14/1006/2016/0 for the Policy Period April1, 2016, to April1, 2017. PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek 'l
  • 1 Document Control Desk April1, 2016 ' & Page 2 PG&E Letter DCL-16-037 PG&E Letter HBL-16-005 If you have any questions regarding this information, please contact Ms. Janaize Markland at (415) 973-8756.

Sincerely, Edward D. Halpin Senior Vice President, Generation and Chief Nuclear Officer bnsm/4540/6412250 1 cc: Marc L. Dapas, NRC Region IV Administrator Robert J. Evans, NRC Region IV Inspector John B. Hickman, NRC Reactor Decommissioning Branch Project Manager Janaize Markland, PG&E Director, Enterprise Risk Management Koji Maemura, PG&E Sr. Loss Control Engineer Jennifer K. Post, PG&E Attorney Balwant K. Singal, NRC Project Manager Binesh K. Tharakan, NRC Acting Senior Resident Inspector Diablo Distribution Humboldt Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek