DCL-14-023, 2014 Annual Statement of Insurance

From kanterella
Jump to navigation Jump to search
2014 Annual Statement of Insurance
ML14091A439
Person / Time
Site: Diablo Canyon, Humboldt Bay
(DPR-007, DPR-082, DRP-080)
Issue date: 04/01/2014
From: Halpin E
Pacific Gas & Electric Co
To:
Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation
References
50-133-OL, 50-275-OL, 50-323-OL, DCL-14-023, HBL-14-01 0
Download: ML14091A439 (2)


Text

Pacific Gas and Electric Company April 1, 2014 PG&E Letter DCL-14-023 PG&E Letter HBL-14-01 0 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 Edward D. Halpin Senior Vice President Nuclear Generation & Chief Nuclear Officer Diablo Canyon Power Plant Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 805.545.4100 E*Mail: E1HB@pge.com 10 CFR 50.54 2014 Annual Statement of Insurance for Pacific Gas and Electric Company's Diablo Canyon Power Plant and Humboldt Bay Power Plant

Dear Commissioners and Staff:

As required by 10 CFR 50.54(w)(3), listed below is the annual reporting of nuclear property insurance coverage with Nuclear Electric Insurance Limited (NEIL) for the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP):

Insurer/Type of Policy Policy Policy Coverage Limits Number Period DCPP NEIL Primary

$1,500,000,000 P14-027 04/01/14 to 4/01/15 NEIL Blanket Excess

$1,250,000,000 BX14-007 04/01/14 to 4/01/15 TOTAL

$2,750,000,000 HBPP NEIL Primary

$ 131 I 100,000 P14-028 04/01/14 to 4/01/15 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions regarding this information, please contact Mr. Joshua Fleischer at (415) 973-8735.

Sincerely, Edward D. Halpin A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk April1, 2014 Page 2 J8L3/64087684 cc:

Peter J. Bamford, NRR Project Manager Marc L. Dapas, NRC Region IV Administrator Robert J. Evans, NRC Region IV Inspector Joshua M. Fleischer, Principal Risk Management PG&E Letter DCL-14-023 PG&E Letter HBL-14-01 0 John B. Hickman, NRC/FSME/DWMEP Project Manager Thomas R. Hipschman, NRC Senior Resident Inspector Jennifer L. Post, PG&E Attorney Diablo Distribution HBPP Humboldt Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek