From: Halpin E
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
DCL-16-037, HBL-16-005
Download: ML16092A057 (2)


Text

Pacific Gas and Electric Company Edward D. Halpin Diablo Canyon Power Plant Senior Vice President P.O. Box 56 Generation and Avila Beach, CA 93424 Chief Nuclear Officer 805.545.4100 E-Mail: El H8@pge.com April1, 2016 PG&E Letter DCL-16-037 PG&E Letter HBL-16-005 U.S. Nuclear Regulatory Commission 10 CFR 50.54 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 2016 Annual Statement of Insurance for Pacific Gas and Electric Company's Diablo Canyon Power Plant and Humboldt Bay Power Plant

Dear Commissioners and Staff:

As required by 10 CFR 50.54(w)(3), listed below is the annual reporting of nuclear property insurance coverage with Nuclear Electric Insurance Limited (NEIL) for the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP):

Policy Policy Policy Limits Number Period DCPP NEIL Primary $1,500,000,000 P16-027 04/01/16 to 4/01/17 NEIL Blanket Excess $1,250,000,000 BX16-007 04/01/16 to 4/01/17 TOTAL $2,750,000,000 HBPP NEIL Primary $ 131 '1 00,000 P16-028 04/01/16 to 4/01/17 Pacific Gas and Electric Company (PG&E) procures an additional $200,000,000 of Property Damage in excess of the stated NEIL limits from European Mutual Association of Nuclear Insurance. The Policy Number is A14/1006/2016/0 for the 'l Policy Period April1, 2016, to April1, 2017.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

~~~ April1, 2016 PG&E Letter HBL-16-005

' & Page 2 If you have any questions regarding this information, please contact Ms. Janaize Markland at (415) 973-8756.

Sincerely, Edward D. Halpin Senior Vice President, Generation and Chief Nuclear Officer bnsm/4540/6412250 1 cc: Marc L. Dapas, NRC Region IV Administrator Robert J. Evans, NRC Region IV Inspector John B. Hickman, NRC Reactor Decommissioning Branch Project Manager Janaize Markland, PG&E Director, Enterprise Risk Management Koji Maemura, PG&E Sr. Loss Control Engineer Jennifer K. Post, PG&E Attorney Balwant K. Singal, NRC Project Manager Binesh K. Tharakan, NRC Acting Senior Resident Inspector Diablo Distribution Humboldt Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Pacific Gas and Electric Company Edward D. Halpin Diablo Canyon Power Plant Senior Vice President P.O. Box 56 Generation and Avila Beach, CA 93424 Chief Nuclear Officer 805.545.4100 E-Mail: El H8@pge.com April1, 2016 PG&E Letter DCL-16-037 PG&E Letter HBL-16-005 U.S. Nuclear Regulatory Commission 10 CFR 50.54 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 2016 Annual Statement of Insurance for Pacific Gas and Electric Company's Diablo Canyon Power Plant and Humboldt Bay Power Plant

Dear Commissioners and Staff:

As required by 10 CFR 50.54(w)(3), listed below is the annual reporting of nuclear property insurance coverage with Nuclear Electric Insurance Limited (NEIL) for the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP):

Policy Policy Policy Limits Number Period DCPP NEIL Primary $1,500,000,000 P16-027 04/01/16 to 4/01/17 NEIL Blanket Excess $1,250,000,000 BX16-007 04/01/16 to 4/01/17 TOTAL $2,750,000,000 HBPP NEIL Primary $ 131 '1 00,000 P16-028 04/01/16 to 4/01/17 Pacific Gas and Electric Company (PG&E) procures an additional $200,000,000 of Property Damage in excess of the stated NEIL limits from European Mutual Association of Nuclear Insurance. The Policy Number is A14/1006/2016/0 for the 'l Policy Period April1, 2016, to April1, 2017.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

~~~ April1, 2016 PG&E Letter HBL-16-005

' & Page 2 If you have any questions regarding this information, please contact Ms. Janaize Markland at (415) 973-8756.

Sincerely, Edward D. Halpin Senior Vice President, Generation and Chief Nuclear Officer bnsm/4540/6412250 1 cc: Marc L. Dapas, NRC Region IV Administrator Robert J. Evans, NRC Region IV Inspector John B. Hickman, NRC Reactor Decommissioning Branch Project Manager Janaize Markland, PG&E Director, Enterprise Risk Management Koji Maemura, PG&E Sr. Loss Control Engineer Jennifer K. Post, PG&E Attorney Balwant K. Singal, NRC Project Manager Binesh K. Tharakan, NRC Acting Senior Resident Inspector Diablo Distribution Humboldt Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway