DCL-11-028, Annual Statement of Insurance

From kanterella
Jump to navigation Jump to search
Annual Statement of Insurance
ML111020443
Person / Time
Site: Diablo Canyon, Humboldt Bay
Issue date: 04/01/2011
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation
References
DCL-11-028, HBL-11-007
Download: ML111020443 (2)


Text

PacificGas and lfflý ElectricCompany James R. Becker Site Vice President Diablo Canyon Power Plant Mail Code 104/5/601 P 0. Box 56 Avila Beach, CA 93424 April 1,2011 805.545.3462 Internal: 691.3462 Fax: 805.545.6445 PG&E Letter DCL-1 1-028 PG&E Letter HBL-1 1-007 U.S. Nuclear Regulatory Commission 10 CFR 50.54 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 2011 Annual Statement of Insurance for Pacific Gas and Electric Company's Diablo Canyon Power Plant and Humboldt Bay Power Plant

Dear Commissioners and Staff:

As required by 10 CFR 50.54(w)(3), listed below is the annual reporting of nuclear property insurance coverage for the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP):

t Insurer/Type of Policy Policy Policy Plant Coverage Limits Number Period DCPP NEIL Primary $ 500,000,000 P11-027 04/01/11 to 4/01/12 NEIL II Excess $1,250,000,000 Xl 1-042 04/01/11 to 4/01/12 NEIL Blanket Excess $1,000,000,000 BX1 1-007 04/01/11 to 4/01/12 TOTAL $2,750,000,000 HBPP NEIL Primary $ 131,100,000 Pll-028 04/01/11 to 4/01/12 Pacific Gas and Electric Company makes no regulatory commitments in this letter.

If you have any questions regarding this information, please contact Mr. George Page at (415) 267-7244.

Sincerely, James R. Becker 1ý-k ool A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway - Comanche Peak

  • Diabto Canyon - Palo Verde
  • San Onofre - South Texas Project
  • Wolf Creek

Document Control Desk PG&E Letter DCL-1 1-028 April 1,2011 PG&E Letter HBL-1 1-007 Page 2 swh/64018356 cc: Elmo E. Collins, NRC Region IV Robert J. Evans, NRC Region IV Inspector John B. Hickman, NRC Project Manager Michael S. Peck, NRC Senior Resident Inspector Jennifer Post Alan B. Wang, NRC Project Manager Diablo Distribution PG Fossil Gen HBPP Humboldt Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway - Comanche Peak e Diabto Canyon

  • Palo Verde
  • San Onofre
  • Wolf Creek