2016 Davis Besse Nuclear Power Station Initial License Examination Miscellaneous Correspondence
ML16200A395
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/17/2016
From: Bielby M
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML15274A367 List:
References
Download: ML16200A395 (18)


Text


2016 DAVIS-BESSE NUCLEAR POWER STATION INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co. Davis-Besse Nuclear Power Station REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 October 30, 2015 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Boles:

In a telephone conversation on October 26, 2015, between Mr. Mark Klein, Initial License Exam Lead, and Mr. Michael Bielby, Chief Examiner, arrangements were made for the administration of licensing examinations at the Davis-Besse Nuclear Power Station during the weeks of June 13, 2016, and June 20, 2016. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of May 16, 2016. As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10 of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by February 9, 2016. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by April 12, 2016. Pursuant to Title 10, Section 55.40(b )(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the Commission for review and approval.

All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

B. Boles Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024

), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration.

At least 1 month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33}, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). . ..

B. Boles Thank you for your cooperation in this matter. Mr. M. Klein has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact M. Bielby, at 630-829-9762, or me at 630-829-9711.

Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSER\f Hironori Peterson, Chief Operations Branch Division of Reactor Safety B. Boles Thank you for your cooperation in this matter. Mr. M. Klein has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact M. Bielby, at 630-829-9762, or me at 630-829-9711.

Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSER\f DISTRIBUTION:

Janelle Jessie RidsNrrDorllpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRS III Jim Clay Carmen Olteanu Scott Sloan Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: Ltr 1 Oxx15 Davis Besse Confirmation of Initial Lie Exam (MEB).docx

[gl Publicly Available D Non-Publicly AvailableD Sensitive

[gl Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" = COJ>Y_ with attach/encl "N" =No copy OFFICE Rill I Rill Jr Rill I Rill NAME MBielby:jw fV\9fh DATE 10/f}.?/15

./

fl OFFICIAL RECORD COPY I Mr. Raymond Lieb Site Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 27, 2014 FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Lieb:

We have received your corporate letters L-12-254 dated July 6, 2012, L-13-172 dated June 3, 2013, and L-13-27 4 dated August 28, 2013. In these letters, you requested an initial operator licensing examination scheduled in December 2014 be delayed until June 2015. In response, we have scheduled an initial license exam for the weeks of June 15 and 22, 2015, with an onsite validation date of May 18, 2015. In your letters, you also requested we schedule initial license exams in June 2016 and December 2017 at the Davis-Besse Nuclear Power Station. In response, as you requested, we have scheduled an initial operator licensing examination for the weeks of June 13 and 20, 2016, with an onsite validation scheduled for May 23, 2016. Additionally, we have scheduled an initial operator licensing examination for the weeks of December 4 and 11, 2017, with an onsite validation scheduled for the week of November 13, 2017. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule.

Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program R. Lieb In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html* (the Public Electronic Reading Room). Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServŽ Sincerely, IRA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety R. Lieb In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServŽ DISTRIBUTION:

Ernesto Quinones RidsNrrDorllpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak John McHale Sincerely, IRA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: Ltr 012714 Davis Besse Confirmation of Initial OL Exam.docx l:8l Publicly Available D Non-Publicly Available D Sensitive l:8l Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE Rill I Rill I Rill I Rill I NAME RKWalton:bl HPeterson DATE 01/22/14 01/27/14 OFFICIAL RECORD COPY FENOC 5501 North State Route 2 Oak Harbor, Ohio 43449 FirstEnergy Nuclear Operating Company Barry S. Allen Vice President

-Nuclear July 6, 2012 L-12-254 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RlS) 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," as requested.

The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2017 for Initial Operator License Examinations and through calendar year 2015 for Generic Fundamentals Examinations.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Charles N. Steenbergen, Acting Site Training Manager, at (419) 321-7594.

Sincerely, fo.,. B.s.

Barry S.

vaw

Enclosure:

NRC Form 536 -Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill DB-1 NRC/NRR Project Manager DB-1 NC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board 419-321-7676 Fax: 419-321-7582 JUL 1 6 2D12 Enclosure L-12-254 Form NRC-536 Operator Licensing Examination Data ( orte page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 09/30/2014 (9-2011) Esffmated burden per response to comply wiln this voluntary information colledion request t hour. This Information collection Is used to plan budgets and resources for operator OPERATOR LICENSING examinations.

Send comments reganling burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Wasnington.

DC 20555.0001, or hy Internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOS-10202, (3150*0131),

of Management and Budget, Washington, DC 20503. If a means used lo impose an Information collection doos not display a currenlly valid OMS control number, the NRC may not conduct or sponsor, and a persnn Is not required to respond lo, the information collection.

FACILITY NRC REGION Davis-Besse Power Station, Unit 1 3 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 14 CY 15 CY 16 CY 17 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 I l EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 14 CY 15 CY 16 CY 17 --------NUMBER OF RE.A.CTOR 6 0 6 6 OPERATORS NUMBER OF SENIOR REACTOR 5 0 5 5 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3 0 3 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 1211/14 NA 6/13116 12/1/J 7 ALTERNATE DATE 115115 NA 7/18/16 1/5/18 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 13 CY 15 PROPOSED --NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 11 CANDIDATES NRC FORM 536 (9*2011)

FENOClM ArstEnergy Nuclear OpBrating Company Raymond A. L/6b Vice President.

Nuclear June 3, 2013 L-13-172 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Rescheduling of Operator Licensing Examinations 5501 North State Route 2 Oak Harbor. Ohio 43449 419-321-7676 Fax: 419-321-7582 This letter is being submitted to request rescheduling of the Davis-Besse Nuclear Power Station (DBNPS) Initial Operator Licensing Examination for 2014. Letter L-11-209, Response to Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator Licensing Examinations," dated June 23, 2011, requested a primary examination date of December 1, 2014, and an alternate date of January 5, 201.5. Due to preparations for our upcoming Steam Generator Replacement outage in the spring of 2014, an approximate six month extension to these dates is needed. Therefore, the FirstEnergy Nuclear Operating Company (FENOC) is requesting a primary examination date for the week of June 1, 2015, with an alternate date of July 6, 2015. These proposed changes have been discussed with Mr. R Keith Walton, NRC Region Ill Operator Licensing.

Please note that the upcoming 2013 examinations are unaffected by this change, as are the examinations scheduled in 2016. An updated Operator Licensing Examination Data Form (NRC Form 536) is enclosed to reflect these changes, along with a revised schedule for the proposed administration of the Generic Fundamentals Examination in 2013 and 2014. There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel T. Hartnett, Superintendent-Nuclear Operations Training at (419) 249-2396.*

Raymond A. Lieb vaw Davis-Besse Nuclear Power Station Unit 1 L-13-172 Page 2 of2

Enclosure:

NRC Form 536 -Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill PB-1 NRC/NRR Project Manager DB-1 NC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board Enclosure L-13-172 Form NRC -536 Operator Licensing Examination Data (one page follows)

NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3160..0131 EXPIRES: 09130/2014 (09-2011)

Estimated burden per response to comply wilh this voluntary Information collection request 1 hOur. This information colledion is used 10 plan budgets and resources for operator OPERA TOR LICENSING examinations.

Send comments regartling bulden esnmale 10 the lnfonnation Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mall to lnlocollec1S.Resource@nrc.gov, and to the Desk Offocer, Ofltce of Information and Ragula!OIJI Affairs, NEOB-10202, [3150-0131), Olfica of Managament and Budget, Washington, DC 20503. If a means used 10 Impose an ilfonnation collection does not display a currently valid OMB control number. the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation collection.

FACILITY INRCRE<.>IUN Davis-Besse Nuclear Power Station Unit I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 -----ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 I I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 ----NUMBER OF REACTOR 6 0 6 6 OPERATORS NUMBER OF SENIOR REACTOR 5 0 5 5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 3 0 3 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 06/03/2013 06/0112015 06/13/2016 ALTERNATE DATE 07/15/2013 07/16/2015 07/18/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 13 CY 14 PROPOSED --NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 15 CANDIDATES NRC FORM 536 (09-2011)

,. RrstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, Ohio 43449 Raymond A Ueb Vice President, Nuclear August28,2013 L-13-274 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

-

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2013-06, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," as requested.

The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2018 for Initial Operator License Examinations and throuQh calendar year 2016 for Generic Fundamentals Examinations.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel T. Hartnett, Superintendent

-Nuclear Operations Training at ( 419) 249-2396.

Raymond A. Lieb vaw

Enclosure:

NRC Form 536 -Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill DB-1 NRC/NRR Project Manager DB-1 NC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board 419-321-7676 Fax: 419-321-7582 -fifVEO SfP 0 9 2013 Enclosure L-13-274 Form NRC -536 Operator Licensing Examination Data (one page follows)

.. -NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations.

Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION NRC Region III Davis-Besse Nuclear Power Station Unit 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18 --------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18 --------NUMBER OF REACTOR 4 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 6 5 5 0 OPERATORS -INSTANT .. NUMBER OF SENIOR REACTOR 1 3 3 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 6/1/2015 6/13/2016 1211/2017 ALTERNATE DATE 7/16/2015 7118/2016 1/8/2018 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 15 CY 16 PROPOSED -----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 CANDIDATES NRC FORM 536 (09-2011)


2016 DAVIS-BESSE NUCLEAR POWER STATION INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co. Davis-Besse Nuclear Power Station REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 October 30, 2015 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Boles:

In a telephone conversation on October 26, 2015, between Mr. Mark Klein, Initial License Exam Lead, and Mr. Michael Bielby, Chief Examiner, arrangements were made for the administration of licensing examinations at the Davis-Besse Nuclear Power Station during the weeks of June 13, 2016, and June 20, 2016. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of May 16, 2016. As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10 of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by February 9, 2016. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by April 12, 2016. Pursuant to Title 10, Section 55.40(b )(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the Commission for review and approval.

All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

B. Boles Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024

), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration.

At least 1 month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33}, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). . ..

B. Boles Thank you for your cooperation in this matter. Mr. M. Klein has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact M. Bielby, at 630-829-9762, or me at 630-829-9711.

Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSER\f Hironori Peterson, Chief Operations Branch Division of Reactor Safety B. Boles Thank you for your cooperation in this matter. Mr. M. Klein has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact M. Bielby, at 630-829-9762, or me at 630-829-9711.

Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSER\f DISTRIBUTION:

Janelle Jessie RidsNrrDorllpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRS III Jim Clay Carmen Olteanu Scott Sloan Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: Ltr 1 Oxx15 Davis Besse Confirmation of Initial Lie Exam (MEB).docx

[gl Publicly Available D Non-Publicly AvailableD Sensitive

[gl Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" = COJ>Y_ with attach/encl "N" =No copy OFFICE Rill I Rill Jr Rill I Rill NAME MBielby:jw fV\9fh DATE 10/f}.?/15

./

fl OFFICIAL RECORD COPY I Mr. Raymond Lieb Site Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 27, 2014 FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Lieb:

We have received your corporate letters L-12-254 dated July 6, 2012, L-13-172 dated June 3, 2013, and L-13-27 4 dated August 28, 2013. In these letters, you requested an initial operator licensing examination scheduled in December 2014 be delayed until June 2015. In response, we have scheduled an initial license exam for the weeks of June 15 and 22, 2015, with an onsite validation date of May 18, 2015. In your letters, you also requested we schedule initial license exams in June 2016 and December 2017 at the Davis-Besse Nuclear Power Station. In response, as you requested, we have scheduled an initial operator licensing examination for the weeks of June 13 and 20, 2016, with an onsite validation scheduled for May 23, 2016. Additionally, we have scheduled an initial operator licensing examination for the weeks of December 4 and 11, 2017, with an onsite validation scheduled for the week of November 13, 2017. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule.

Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program R. Lieb In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html* (the Public Electronic Reading Room). Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServŽ Sincerely, IRA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety R. Lieb In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServŽ DISTRIBUTION:

Ernesto Quinones RidsNrrDorllpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak John McHale Sincerely, IRA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: Ltr 012714 Davis Besse Confirmation of Initial OL Exam.docx l:8l Publicly Available D Non-Publicly Available D Sensitive l:8l Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE Rill I Rill I Rill I Rill I NAME RKWalton:bl HPeterson DATE 01/22/14 01/27/14 OFFICIAL RECORD COPY FENOC 5501 North State Route 2 Oak Harbor, Ohio 43449 FirstEnergy Nuclear Operating Company Barry S. Allen Vice President

-Nuclear July 6, 2012 L-12-254 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RlS) 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," as requested.

The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2017 for Initial Operator License Examinations and through calendar year 2015 for Generic Fundamentals Examinations.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Charles N. Steenbergen, Acting Site Training Manager, at (419) 321-7594.

Sincerely, fo.,. B.s.

Barry S.

vaw

Enclosure:

NRC Form 536 -Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill DB-1 NRC/NRR Project Manager DB-1 NC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board 419-321-7676 Fax: 419-321-7582 JUL 1 6 2D12 Enclosure L-12-254 Form NRC-536 Operator Licensing Examination Data ( orte page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 09/30/2014 (9-2011) Esffmated burden per response to comply wiln this voluntary information colledion request t hour. This Information collection Is used to plan budgets and resources for operator OPERATOR LICENSING examinations.

Send comments reganling burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Wasnington.

DC 20555.0001, or hy Internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOS-10202, (3150*0131),

of Management and Budget, Washington, DC 20503. If a means used lo impose an Information collection doos not display a currenlly valid OMS control number, the NRC may not conduct or sponsor, and a persnn Is not required to respond lo, the information collection.

FACILITY NRC REGION Davis-Besse Power Station, Unit 1 3 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 14 CY 15 CY 16 CY 17 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 I l EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 14 CY 15 CY 16 CY 17 --------NUMBER OF RE.A.CTOR 6 0 6 6 OPERATORS NUMBER OF SENIOR REACTOR 5 0 5 5 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 3 0 3 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 1211/14 NA 6/13116 12/1/J 7 ALTERNATE DATE 115115 NA 7/18/16 1/5/18 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 13 CY 15 PROPOSED --NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 11 CANDIDATES NRC FORM 536 (9*2011)

FENOClM ArstEnergy Nuclear OpBrating Company Raymond A. L/6b Vice President.

Nuclear June 3, 2013 L-13-172 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Rescheduling of Operator Licensing Examinations 5501 North State Route 2 Oak Harbor. Ohio 43449 419-321-7676 Fax: 419-321-7582 This letter is being submitted to request rescheduling of the Davis-Besse Nuclear Power Station (DBNPS) Initial Operator Licensing Examination for 2014. Letter L-11-209, Response to Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator Licensing Examinations," dated June 23, 2011, requested a primary examination date of December 1, 2014, and an alternate date of January 5, 201.5. Due to preparations for our upcoming Steam Generator Replacement outage in the spring of 2014, an approximate six month extension to these dates is needed. Therefore, the FirstEnergy Nuclear Operating Company (FENOC) is requesting a primary examination date for the week of June 1, 2015, with an alternate date of July 6, 2015. These proposed changes have been discussed with Mr. R Keith Walton, NRC Region Ill Operator Licensing.

Please note that the upcoming 2013 examinations are unaffected by this change, as are the examinations scheduled in 2016. An updated Operator Licensing Examination Data Form (NRC Form 536) is enclosed to reflect these changes, along with a revised schedule for the proposed administration of the Generic Fundamentals Examination in 2013 and 2014. There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel T. Hartnett, Superintendent-Nuclear Operations Training at (419) 249-2396.*

Raymond A. Lieb vaw Davis-Besse Nuclear Power Station Unit 1 L-13-172 Page 2 of2

Enclosure:

NRC Form 536 -Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill PB-1 NRC/NRR Project Manager DB-1 NC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board Enclosure L-13-172 Form NRC -536 Operator Licensing Examination Data (one page follows)

NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3160..0131 EXPIRES: 09130/2014 (09-2011)

Estimated burden per response to comply wilh this voluntary Information collection request 1 hOur. This information colledion is used 10 plan budgets and resources for operator OPERA TOR LICENSING examinations.

Send comments regartling bulden esnmale 10 the lnfonnation Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mall to lnlocollec1S.Resource@nrc.gov, and to the Desk Offocer, Ofltce of Information and Ragula!OIJI Affairs, NEOB-10202, [3150-0131), Olfica of Managament and Budget, Washington, DC 20503. If a means used 10 Impose an ilfonnation collection does not display a currently valid OMB control number. the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation collection.

FACILITY INRCRE<.>IUN Davis-Besse Nuclear Power Station Unit I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 -----ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 I I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 ----NUMBER OF REACTOR 6 0 6 6 OPERATORS NUMBER OF SENIOR REACTOR 5 0 5 5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 3 0 3 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 06/03/2013 06/0112015 06/13/2016 ALTERNATE DATE 07/15/2013 07/16/2015 07/18/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 13 CY 14 PROPOSED --NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 15 CANDIDATES NRC FORM 536 (09-2011)

,. RrstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, Ohio 43449 Raymond A Ueb Vice President, Nuclear August28,2013 L-13-274 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

-

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2013-06, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," as requested.

The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2018 for Initial Operator License Examinations and throuQh calendar year 2016 for Generic Fundamentals Examinations.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel T. Hartnett, Superintendent

-Nuclear Operations Training at ( 419) 249-2396.

Raymond A. Lieb vaw

Enclosure:

NRC Form 536 -Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill DB-1 NRC/NRR Project Manager DB-1 NC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board 419-321-7676 Fax: 419-321-7582 -fifVEO SfP 0 9 2013 Enclosure L-13-274 Form NRC -536 Operator Licensing Examination Data (one page follows)

.. -NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations.

Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION NRC Region III Davis-Besse Nuclear Power Station Unit 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18 --------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18 --------NUMBER OF REACTOR 4 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 6 5 5 0 OPERATORS -INSTANT .. NUMBER OF SENIOR REACTOR 1 3 3 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 6/1/2015 6/13/2016 1211/2017 ALTERNATE DATE 7/16/2015 7118/2016 1/8/2018 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 15 CY 16 PROPOSED -----NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 CANDIDATES NRC FORM 536 (09-2011)