Rev 1 to Monthly Operating Rept for Apr 1992 for WNP-2, Revising Net Electrical Energy Originally Reported as 430411
ML17289A737
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1992
From: Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17289A736 List:
References
NUDOCS 9207200171
Download: ML17289A737 (2)


Text

OPERATING DATA REPORT WNP-2 DATE: 01-May-92 1.DOCKET: 50-397 2.REPORTING PERIOD: 3.UTILITY CONTACT: Apr-92 OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509)377-2486 719 4.LICENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe): 6.DESIGN ELECTRICAL RATING (NET MWe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe): 9.IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: 3323 1200.9 1100 1129 1085 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): 11.REASONS FOR RESTRICTIONS, IF ANY: 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 719 416.0 0.0 410.6 0.0 1337639 452340*430311 57.14 57.1>o 55.2%54.4>o 0~0>o 0.0 YEAR 2903 2085.0 0.0 2042.6 0.0 6588250 2233530 2135847 70.4>o 70.4>o 67.8%66.9%21~34 552.0 CUMULATIVE 64687.2 45475.7 340.4 43842.5 381.7 126204072 42089350 40393886 67.8'6 68.44 57.1%56.8w 13.5>6855.8 26.SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION):

27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:*Revision 1-This is to revise net electrical energy for, April as shown above.It was reported as 430411 on original report.9207200i7i 920610 PDR ADOCK 05000397 R PDR CI'I ,iI v