GO2-97-048, Monthly Operating Rept for Feb 1997 for WNP-2
| ML17292A739 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/28/1997 |
| From: | Kasko B, Galen Smith WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GO2-97-048, GO2-97-48, NUDOCS 9703190082 | |
| Download: ML17292A739 (8) | |
Text
CATHGORY 1 REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR: 9703190082 DOC. DATE: 97/02/28 NOTARIZED:
NO DOCKET
'FACIL: 50-397 WPPSS Nuclear Pro Jecti Unit 2i Washington Public~ Poee 05000397 AUTH. NAI iE AUTHOR AFFILIATION KASKOi B.
Washington Public Power Supply System SMITHI G. O.
Washington Public Poeer Supply System RECIP. NAME RECIPIENT AFFILIATION SUB JECT:
Month l g operating rep t &or Feb 1997 for WNP-2. W/9'70313 1 tr.
DISTRIBUTION CODE:
IE24D COPIES RECEIUED: LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES'EC IP IENT ID CODE/NAME'D4-2 PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/N'AME COLBURNi T COPIES
'TTR ENCL 1
1 INTERNAL:
ACRS 1
1 1
1 1
AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 1
1 1
1 1
EXTERNAL: LITCO BRYCEs 8 H
NRC PDR 1
1 NOAC NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COP IES REGUIR'ED:
LTTR 1 1 ENCL 1 1
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ Richland, Washington 99352-0968 March 13, 1997 G02-97-048 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555.
Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT FEBRUARY 1997 Transmitted herewith is the Monthly Operating Report for the month of February 1997 as required by Technical Specification 5.6.4.
E g Respectfully, G. O. Smith Plant General Manager MailDrop 9270 cc:
EW Merschoff - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston &Strawn INPO ANILibrary UtilityData Institute DLWilliams - BPA / 399 9703i90082 970228 PDR ADQCK 050003'P7 R
PDR I
I'800g~
I!Il!I/I!!IIUUIIIIK!ill!Xl!!!lllIIJIII[!!
h e
'P
)
~
I
OPERATING STATUS REPORT for WNP-2 Date:
March 1, 1997 2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Outage + On-line Hours:
672.0 3486 1199 1153 1153 1107 none none Docket:
50-397 Reporting Period: FEBRUARY 1997 UtilityContact:
Bernice Kasko (509) 377-4473 Licensed Thermal Power (MW,):
Nameplate Rating (Gross MW, ):
Design Electrical Rating (Net MW,):
Maximum Dependable Capacity - summer (Gross MW,):
Maximum Dependable Capacity - summer (Net MW,):
Ifchanges occur above since last report, give reasons; Power to which restricted, ifany (Net MW,):
Reasons for restrictions, ifany:
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)
Gross Electrical Energy (MWH)
Net Electrical Energy (MWH)
Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate Forced Outage Hours MONTH 672.0 672.0 0.0 672.0 0.0 1,583,699 514,360 493,396 100.0%
100.0%
66.3%
63.7%
0.0%
0.0 YEAR 1,416.0 1,416.0 0.0 1,416.0 0.0 3,607,980 1,191,354 1,145,792 100.0%
100.0%
73.1%
70.2%
0.0%
0.0 CUMULATIVE 107,048.2 77,288.6 1,730,8 74,666.1 1,956.2 221,454,010 74,576,144 71,454,067 69.7%
71.6%
61.1%
- 60. 1%
10.2%
8,443.0 26.
Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/18/97, duration is 60 days 27.
Ifcurrently shutdown, estimated startup date:
28.
Challenges to safety/relief valves:
None Note:
Cumulative Unit Capacity Factors (MDC 8c DER) are calculated with weighted averages.
AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:
FEBRUARY 1997 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: March 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 DAY AVERAGEDAILYPOWER LEVEL (Net MWe)
AVERAGEDAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 629 627 623 725 747 754 499 247 456 992 874 699 713 722 611 16 17 18 19 20 21 22 23 24 25 26 27 28 737 944 948 600 710 699 580 399 743 1068 1064 1077 1070 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
REPORT PERIOD:
FEBRUARY 1997 UNIT SHUTDOWNS AND POWER REDUCTIONS tr DOCKET 'NO.: 50-397 UNIT NAME: WNP-2 DATE: March 1, 1997 COMPLETED BY: B Kasko TELEPHONE:
(509) 377M73 No.
Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 97%3 2/7/97 S
0 B
1 N/A CB INSTRU Downpowered to 25% to recover RRC-P-1A 97-04 2/11/97 F
97-05 2/15/97 0
A N/A N/A CB CB INSTRU INSTRU RRC-ASD-1A2 tripped. Plant entered single loop operation Downpowered to recover RRC-P-1A in single channel operation 97-06 2/19/97 9747 2/22/97 N/A N/A ZZ CB ZZZZZZ Economic dispatch INSTRU Reduced power to install 1A1 channel hardware
SUMMARY
TYPE F - Forced S - Scheduled REASON A-Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Other METHOD I - M~uMl 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT G%161 E its
&H
c>
'v S
1 le