Withdrawal of Request for Relief from the Requirements of the ASME OM Code Case OMN-20 (CAC Nos. MF9724, MF9725, MF9726, and MF9727; EPID L-2017-LLR-0028)
ML17310A244
Person / Time
Site: Mcguire, Harris, Robinson, McGuire  Duke Energy icon.png
Issue date: 11/08/2017
From: Dennis Galvin
Plant Licensing Branch II
To: Henderson K
Duke Energy Corp
Galvin D, NRR/DORL/LPLII-2, 415-6256
References
CAC MF9724, CAC MF9725, CAC MF9726, CAC MF9727, EPID L-2017-LLR-0028
Download: ML17310A244 (3)


Text

Mr. Kelvin Henderson Senior Vice President Nuclear Corporate Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 8, 2017

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2; H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2; AND SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -WITHDRAWAL OF REQUEST FOR RELIEF FROM THE REQUIREMENTS OF THE ASME OM CODE CASE OMN-20 (CAC NOS. MF9724, MF9725, MF9726, AND MF9727; EPID L-2017-LLR-0028)

Dear Mr. Henderson:

By letter dated May 19, 2017 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML17139C014), Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC (Duke Energy) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for the use of a proposed alternative to the requirements of the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the McGuire Nuclear Station, Units 1 and 2; the H. B. Robinson Steam Electric Plant, Unit No. 2; and the Shearon Harris Nuclear Power Plant, Unit 1. The proposed alternative would adopt approved Code Case OMN-20, "lnservice Test Frequency," for the current ten-year lnservice Testing intervals for the respective plants. Subsequently, by letter dated November 1, 2017 (ADAMS Accession No. ML17305A549), Duke Energy withdrew the request for the use of the proposed alternative.

The purpose of this letter is to advise that the above-cited application is being treated as withdrawn.

K. Henderson If you have any questions, please contact the Project Manager, Dennis Galvin at (301) 415-6256 or by e-mail to Dennis.Galvin@nrc.gov.

Docket Nos. 50-369, 50-370, 50-261 , and 50-400 cc: Mr. Steven D. Capps Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078 Ms. Tanya Hamilton Site Vice President Sincerely, Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Shearon Harris Nuclear Power Plant, Unit 1 5413 Shearon Harris Road, M/C HNP01 New Hill, NC 27562-0165 Mr. Ernest J. Kapopoulos, Jr. Site Vice President H. 8. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550 Additional Distribution via Listserv K. Henderson

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2; H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2; AND SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -WITHDRAWLAL OF REQUEST FOR RELIEF FROM THE REQUIREMENTS OF THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS OM CODE CASE OMN-20 (CAC NOS. MF9724, MF9725, MF9726, AND MF9727; EPID L-2017-LLR-0028)

DATED NOVEMBER 8, 2017 DISTRIBUTION:

PUBLIC RidsNrrDorlLpl2-1 Resource RidsNrrDorlLpl2-2 Resource RidsNrrLAKGoldstein Resource RidsNrrLABClayton Resource RidsNrrPMRobinsonResource RidsNrrPMMcGuire Resource RidsNrrPMHarris Resource RidsRgn2MailCenter Resource RidsNrrDeEmib Resource RidsACRS_MailCTR Resource GBedi, NRR ADAMS Accession No.: ML17310A244 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NAME DGalvin BClavton (PBlechman for) UShoop (PBuckberq for) DATE 11/08/2017 11/07/2017 11/08/2017 OFFICIAL RECORD COP NRR/DORL/LPL2-2/PM DGalvin 11/08/2017