R. E. Ginna - Supplemental Report on Reportable Occurrence 76-12, 30-Day Report, Containment Personnel Airlock Handwheel Shaft Seal Excessive Leakage During Testing
ML18143A960
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/25/1976
From: White L
Rochester Gas & Electric Corp
To: O'Reilly J
NRC/IE, NRC Region 1
References
LER 1976-012-00
Download: ML18143A960 (4)


Text

htRC Fud<<," 195,,<(~iM)V.S.NUCLEAR REGULATORY MISSION TO: MR~O'TEILLY FROM: ROCHESTER GAS 8o ELEC CORP ROCHESTER'Y L D WHITE, JR NRC fllSTR(BUTION FDR PART 50 DOCKET MATERIAL DOCKET NUMIIER 5a-k DATE RECEIVE~FILL'UMBER XNCXDENT REPORT DATE OF DOCUMENT s-"t t'TTEB ABORIGINAL COPY DESCRIPTION QNOTOBIZED

/UNCLASSIFIED PROP INPUT FORM ENCLOSURE NVMOEB OF COPIES RECEIVE D~sic uzb LTR REF THEIR 4-23-76 RO 76-l2 30-DAY REPORT...ADVISING CORRECTIVE ACTION IS PLANNED TO PLACE KEEPERS ON THE PACKING GLAND NUTS-TO PREVXZPP ROTATION@~~~~~~~~~~~~~~~~~~~~~~...,DO NOT REMOVE ZCZZOV/LEDGE0 I PLANT NAME~NOTE: IF PERSONNEL EXPOSURE IS INVOI.VED SEND DIRECTLY TO KREGER/J.COLLINS SAFETY BRANCH CHIEF: W 3 CYS FOR ACTION LICE ASST: W/CYS ACRS Lg,CYS HOLDING ENT TO LA FOR ACTION/INFORMATION ENVXRO RE FX NRC PDR X&E 2 c'SCHROEDER/XPPOLXTO INTERNAL D Rl BUTION IST NOVAK CHECK jS"~GAS hhEQlF~L'DL'SC~OMACCARY F..I BARR SIIAO OI.L?IERQBI INCH RHCzEI<JQ~OIj.

NS C.eSTL=R Q5 LPDR: iX(NSXC EXTERNAL OISTRIBUTION CONTROL NUMBFR ggof S te'~4~~~t~~~~C<<4 ROCHESTER GAS AND ELECTRIC CORPORATION r r r~rr I o 89 EAST AVENUE, ROCHESTER, N.Y.14649 LEON D.WHITE.JR, VICE uAESIDENT Regulatory Docket Fite'ay 25, 1976 TELEu+ONE AREA COOE 7ld 546.-2700~g/Mr.James P.O'Reilly, Director U.S.Nuclear Regulatory Commission Office of Inspection and Enforcement qo~" Region I~gu~631 Park Avenue King of Prussia, Pennsylvania 19406~b

Subject:

Supplemental Report on Reportable e 76-12, 30-day report, dated April 23, 1976 R.E.Ginna Nuclear Power Plant, Unit No.1 Docket No.50-244

Dear Mr.O'Reilly:

On April 23, 1976 we submitted Reportable Occurrence 76-12, 30-day report, Containment Personnel Airlock Handwheel Shaft Seal Excessive Leak-age During Testing.In that report the statement was made that action to prevent a recurrence of that event was being investigated.

This is to inform you that the corrective action planned is to place keepers on the packing gland nuts to prevent them from rotating with the shaft, precluding their loosening and permitting leakage through the packing.These keepers will be installed at a future plant outage when the door assemblies can be dismantled for this maintenance.

In addition, procedure changes have been submitted to require as initial conditions that a mechanic verify proper seating of the packing gland nut prior to performing the applicable tests.Two additional copies of this letter are enclosed to conform to the original submittal of Reportable Occurrence 76-12, 30-day report.Very truly yours,""/J'.D.White, Jr.cc: Dr.Ernst Volgenau (30)Mr.William Q.McDonald (3) 1 4~~/lf P/f l f