MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 IR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report 2024-02-02
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information ML23125A1602023-05-0505 May 2023 NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23125A1462023-05-0505 May 2023 NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23122A0342023-05-0202 May 2023 NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22357A0302022-12-23023 December 2022 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000346/2023010 ML22312A5912022-11-0808 November 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22278A0972022-10-0606 October 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Fire Protection Program Changes ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22234A1482022-08-22022 August 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22214A7042022-08-0202 August 2022 Reissue - Davis-Besse Nuclear Power Station, Unit 1 Notification of Nrc Fire Protection Team Inspection Request for Information: Inspection Report 05000346/2022011 ML22187A0992022-07-0606 July 2022 Notification of NRC Supplemental Inspection (95001) and Request for Information ML22182A4442022-07-0202 July 2022 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection Report 05000440/2022010 ML22178A1322022-06-24024 June 2022 Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22136A2122022-05-16016 May 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 ML22130A5662022-05-12012 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22089A2452022-03-30030 March 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-12 ML22068A1822022-03-0909 March 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22013A7512022-01-13013 January 2022 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000334/2022010 and 05000412/2022010 IR 05000346/20210912021-12-17017 December 2021 NRC Inspection Report (05000346/2021091) Preliminary Greater than Green Finding ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21301A0992021-10-28028 October 2021 Draft Request for Additional Information: Proposed Alternate for Examination of Steam Generator Welds - Energy Harbor Nuclear Corp., Davis-Besse Nuclear Power Station, Unit No. 1 ML21292A0482021-10-19019 October 2021 Ti 2515/194 Inspection Documentation Request ML21259A1642021-09-16016 September 2021 NRR E-mail Capture - Request for Additional Information Regarding the LAR for Core Operating Limits ML21203A3252021-07-28028 July 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000346/2021011 ML21168A0662021-06-17017 June 2021 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000440/2021010 ML21155A1952021-06-0404 June 2021 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Davis Besse Nuclear Power Station ML21124A1322021-05-0404 May 2021 Notification of Conduct of a Fire Protection Team Inspection ML21110A6852021-04-19019 April 2021 NRR E-mail Capture - Final RAI - Perry - Request to Review the Emergency Plan ML21102A1542021-04-0909 April 2021 Request for Additional Information (2nd Round) - Steam Generator Tube Sleeve LAR ML21082A4942021-03-23023 March 2021 Final RAIs for GL 04-02 Closure (Email) ML21068A3502021-03-0909 March 2021 Final Request for Additional Information for Reactor Coolant System (RCS) and Pressure and Tempature Limits Report(Ptlr) TS LAR ML21053A0252021-02-20020 February 2021 NRR E-mail Capture - Request for Additional Information (Rais) - LaSalle Request for Exemption from Pre-Access Drug and Alcohol Testing ML21050A1032021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-3, Rev. 0 and VR-5, Rev. 0 ML21050A1112021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-4, Rev. 0 and VR-6, Rev. 0 ML21050A1072021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-7, Rev. 0 ML21049A2702021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request SR-2, Rev. 0 (EPID: L-2021-LLR-0005) (2nd Round RAI) ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21032A3422021-02-0101 February 2021 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Alternative Request SR-2, Rev. 0 ML21020A0392021-01-20020 January 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000440/2021010 ML21015A5762021-01-14014 January 2021 Final RAIs for Steam Generator 180 Day Tube Inspection Report 2023-08-15
[Table view] |
Text
Mr. David 8. Hamilton Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 May 29, 2019 FirstEnergy Nuclear Operating Company 341 White Pine Drive Akron, OH 44320
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1; AND PERRY NUCLEAR POWER PLANT, UNIT NO. 1 -SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: APPLICATION FOR ORDER CONSENTING TO TRANSFER OF LICENSES AND CONFORMING LICENSE AMENDMENTS (EPID-L-2019-LLM-OOOO)
Dear Mr. Hamilton:
By letter dated April 26, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19116A087), FirstEnergy Nuclear Operating Company (FENOC), acting on behalf of itself and FirstEnergy Nuclear Generation, LLC (FENGen) (together, the Applicants) submitted an application for an Order consenting to the transfer of the licenses for Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1, and their respective generally licensed independent spent fuel storage installation facilities (ISFSls).
The application also requests conforming license amendments to update the entity names on the licenses and modify the $400 million support agreement.
Portions of the letter dated April 26, 2019, contained sensitive unclassified non-safeguards information and, accordingly, have been withheld from public disclosure pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations ( 1 O CFR). The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this license transfer application.
The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. The provisions of Section 184 of the Atomic Energy Act of 1954, as amended, and the NRC's regulations at 10 CFR 50.80, "Transfer of licenses," require NRC approval prior to the transfer of control of the ownership and/or operating authority responsibilities within the facility operating license. Specifically, 10 CFR 50.BO(a) states, in part, that "No license for a production or utilization facility ... , shall be transferred, assigned, or in any manner disposed of, either voluntarily or involuntarily, directly or indirectly, through transfer of control of the license to any person, unless the Commission gives its consent in writing."
D. Hamilton Consistent with 1 O CFR 50.80(b ), an application for transfer of a license include as much of the technical and financial qualifications information described in 10 CFR 50.33 and 50.34 on the proposed transferee as would be required for an initial license. In addition, pursuant to 10 CFR 50.33(k)(1) applicants must provide "information in the form of a report, as described in 10 CFR 50.75, indicating how reasonable assurance will be provided that funds will be available to decommission the facility.
The NRC staff has reviewed your application and concluded that the information requested in the enclosure to this letter is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed action in terms of regulatory requirements and the protection of public health and safety and the environment.
In order to make the application complete, the NRC staff requests that the Applicants supplement the application to address the information requested in the enclosure by June 7, 2019. This will enable the NRC staff to begin its detailed technical review. If the information responsive to the NRC staff's request is not received by the above date, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC will cease its review activities associated with the application.
If the application is subsequently accepted for review, you will be advised of any further information needed to support the staff's detailed technical review by separate correspondence.
The information requested and associated time frame in this letter were discussed with Thomas A Lentz of your staff on May 28, 2019.
D. Hamilton If you have any questions, please contact me at (301) 415-3308.
Docket Nos. 50-334, 50-412, 72-1043, 50-346, 72-14, 50-440, and 72-69
Enclosure:
Supplemental Information Needed cc: Mr. Frank R. Payne Acting Site Vice President Sincerely, Bhalchandra Vaidya, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FirstEnergy Nuclear Operating Company Perry Nuclear Power Station P.O. Box 97, SB306 Perry, OH 44081-0097 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 N. State Route 2 Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760 Mr. Richard D. Bologna Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SSB P.O. Box 4, Route 168 Shippingport, PA 15077 Listserv SUPPLEMENTAL INFORMATION NEEDED APPLICATION FOR ORDER CONSENTING TO TRANSFER OF LICENSES AND CONFORMING LICENSE AMENDMENTS FIRSTENERGY NUCLEAR OPERA TING COMPANY BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2: DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1; AND PERRY NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NOS. 50-334, 50-412, 72-1043, 50-346, 72-14, 50-440, AND 72-69 In accordance with the U.S. Nuclear Regulatory Commission (NRC) regulations in Section 50.80(b)(1
)(i) of Title 10 of the Code of Federal Regulations (10 CFR), an application for transfer of a license shall include as much of the technical and financial qualifications information described in 10 CFR 50.33 and 50.34 of the proposed transferee as would be required for an initial license. In addition, pursuant to 10 CFR 50.33(k)(1) applicants must provide "information in the form of a report, as described in 1 O CFR 50. 75, indicating how reasonable assurance will be provided that funds will be available to decommission the facility." Section 50.75(b)(1) states, in part: For an applicant for or holder of an operating license under part 50, the report must contain a certification that financial assurance for decommissioning will be (for a license applicant), or has been (for a license holder), provided in an amount which may be more, but not less, than the amount stated in the table in paragraph (c)(1) of this section adjusted using a rate at least equal to that stated in paragraph (c)(2) of this section. Pursuant to Section 50. 75(b)(4), "The amount stated in the applicant's or licensee's certification may be based on a cost estimate for decommissioning the facility." Thus, for the NRC staff to make a reasonable assurance finding that sufficient funding is available to decommissioning a facility, applicants must demonstrate compliance with the decommissioning financial assurance requirements in 10 CFR 50. 75, including that financial assurance is being provided in the required amount in accordance with 10 CFR 50. 75(b ). Regulatory Guide (RG) 1.159, Revision 2, "Assuring the Availability of Funds for Decommissioning Nuclear Reactors," October 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML112160012), provides guidance for assuring the availability of funds for decommissioning nuclear reactors.
RG 1.159 includes guidance for licensees on correcting shortfalls in decommissioning funding when a licensee can no longer provide decommissioning financial assurance in the amount required by 10 CFR 50. 75. As noted in RG 1.159, a shortfall is defined as "The difference between the amount of financial assurance provided by the licensee and the amount of financial assurance required, when the amount provided is less than the amount required." Enclosure In its March 15, 2019, submittal for the Decommissioning Funding Status Report (ADAMS Accession No. ML19074A242), FirstEnergy Nuclear Operating Company (FENOC, the licensee) identified a projected shortfall for the Beaver Valley Power Station Unit No 1 (BVPS-1) decommissioning trust fund of approximately
$78 million. In its report, FENOC included a regulatory commitment that "Shortfalls in decommissioning funding assurance for BVPS-1 will be reconciled in accordance with the methods described in 10 CFR 50.75(e)(1) by March 31, 2020." In the license transfer application dated April 26, 2019 (ADAMS Accession No. ML19116A087), 1 FENOC and FirstEnergy Nuclear Generation, LLC (FENGen) (together, the Applicants) reference the March 15, 2019, regulatory commitment to reconcile the shortfall by March 31, 2020, and state that this commitment aligns with NRC regulatory guidance in RG 1.159. Relying on this commitment, the Applicants state that the report dated March 15, 2019, demonstrates reasonable assurance of adequate funding for radiological decommissioning.
- 1. As part of its review of the Applicants' license transfer application, the NRC must make a finding that the Applicants have demonstrated that there is reasonable assurance that funds will be available to decommission the facility in accordance with 10 CFR 50.33(k)(1) and 10 CFR 50.75. Any shortfall in decommissioning funding must be corrected by the time of the transfer to demonstrate compliance with NRC decommissioning financial assurance requirements in 10 CFR 50.75. To allow the NRC staff to complete its review of the license transfer application, please provide the following information:
- a. The Applicants have indicated that there is a shortfall in decommissioning funding for BVPS-1, that they plan to reconcile by March 31, 2020. Will the license transfer transaction be consummated on or after March 31, 2020? b. If the license transfer transaction will be consummated prior to March 31, 2020, please provide supplemental information demonstrating how the Applicants will provide reasonable assurance that funds will be available to decommission the facility, including how the projected shortfall in decommissioning funding will be corrected on or prior to the date the license transfer transaction is consummated.
1 Portions of the letter dated April 26, 2019, contained sensitive unclassified non-safeguards information and, accordingly, have been withheld from public disclosure pursuant to 10 CFR 2.390.
D. Hamilton
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2; DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1; AND PERRY NUCLEAR POWER PLANT, UNIT NO. 1 -SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: APPLICATION FOR ORDER CONSENTING TO TRANSFER OF LICENSES AND CONFORMING LICENSE AMENDMENTS (EPID-L-2019-LLM-OOOO)
DATED MAY 29, 2019 DISTRIBUTION:
PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDlpPfpb Resource RidsNrrDorlLpl1 Resource RidsNrrDorlLpl3 Resource RidsNrrLAJBurkhardt Resource RidsNrrLALRonewicz Resource RidsNrrLASRohrer Resource RidsNrrPMBeaverValley Resource RidsNrrPMDavisBesse Resource RidsNrrPMPerry Resource RidsOgcMailCenter Resource RidsRgn 1 MailCenter RidsRgn3Mai1Center SHarwell, NRR/DLP/PFPB TWertz, NRR/DLP/PFPB ADAMS Accession No. ML19143A073 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NAME BVaidya SRohrer (JBurkhardt for) DATE 05/28/2019 5/24/19 OFFICE OGC(*) NRR/DORL/LPL3/BC(A)
NAME AGhosh LRegner (with comments)
DATE 05/28/2019 5/29/19 OFFICIAL RECORD COPY !*) Bv email NRR/DLP/PFPB/BC(A)
FMiller 5/29/19 NRR/DORL/LPL3/PM BVaidya 5/29/19